Details
Translated title of the contribution | Time for the change of amounts of productions |
---|---|
Original language | German |
Pages (from-to) | 887-891 |
Number of pages | 5 |
Journal | ZWF Zeitschrift fuer Wirtschaftlichen Fabrikbetrieb |
Volume | 107 |
Issue number | 12 |
Publication status | Published - 1 Dec 2012 |
Abstract
Stock levels held up make possible reaching a desired service degree at swaying demands. Short-term changes of the demand behavior can, however, cause missing part situation. In case the production is able to adapt the amount of production to a changed demand situation at short notice, the delivering ability can remain unchanged. At stochastic demands the right time of the change of amounts of production is a central question.
ASJC Scopus subject areas
- Engineering(all)
- General Engineering
- Business, Management and Accounting(all)
- Strategy and Management
- Decision Sciences(all)
- Management Science and Operations Research
Cite this
- Standard
- Harvard
- Apa
- Vancouver
- BibTeX
- RIS
In: ZWF Zeitschrift fuer Wirtschaftlichen Fabrikbetrieb, Vol. 107, No. 12, 01.12.2012, p. 887-891.
Research output: Contribution to journal › Article › Research › peer review
}
TY - JOUR
T1 - Zeitpunkt zur Veränderung von Fertigungsmengen
AU - Meers, Stephan
AU - Ulimann, Georg
AU - Nyhuis, Peter
PY - 2012/12/1
Y1 - 2012/12/1
N2 - Stock levels held up make possible reaching a desired service degree at swaying demands. Short-term changes of the demand behavior can, however, cause missing part situation. In case the production is able to adapt the amount of production to a changed demand situation at short notice, the delivering ability can remain unchanged. At stochastic demands the right time of the change of amounts of production is a central question.
AB - Stock levels held up make possible reaching a desired service degree at swaying demands. Short-term changes of the demand behavior can, however, cause missing part situation. In case the production is able to adapt the amount of production to a changed demand situation at short notice, the delivering ability can remain unchanged. At stochastic demands the right time of the change of amounts of production is a central question.
UR - http://www.scopus.com/inward/record.url?scp=84873353464&partnerID=8YFLogxK
M3 - Artikel
AN - SCOPUS:84873353464
VL - 107
SP - 887
EP - 891
JO - ZWF Zeitschrift fuer Wirtschaftlichen Fabrikbetrieb
JF - ZWF Zeitschrift fuer Wirtschaftlichen Fabrikbetrieb
SN - 0947-0085
IS - 12
ER -