Details
Translated title of the contribution | Increasing sales volume by logistical measures? |
---|---|
Original language | German |
Pages | 38-40 |
Number of pages | 3 |
Volume | 18 |
Issue number | 2 |
Journal | Productivity Management |
Publication status | Published - 20 May 2013 |
Abstract
The Collaborate Research Centre 489 (SFB 489) at the Institute for Production Systems (IFA) developed a Logistic Information System which provides support in making decisions and is designed specifically for the forging industry. The aim of a beginning research project (T7) has been started in order to develop a universal approach to logistically and monetarily evaluate measures in production.
ASJC Scopus subject areas
- Business, Management and Accounting(all)
- General Business,Management and Accounting
- Engineering(all)
- Industrial and Manufacturing Engineering
Cite this
- Standard
- Harvard
- Apa
- Vancouver
- BibTeX
- RIS
In: Productivity Management, Vol. 18, No. 2, 20.05.2013, p. 38-40.
Research output: Contribution to specialist publication › Contribution in non-scientific journal › Transfer
}
TY - GEN
T1 - Umsatzsteigerung durch Erhöhung der Logistikleistung?
AU - Nyhuis, Peter
AU - Grigutsch, Michael
AU - Keil, Heinz Simon
PY - 2013/5/20
Y1 - 2013/5/20
N2 - The Collaborate Research Centre 489 (SFB 489) at the Institute for Production Systems (IFA) developed a Logistic Information System which provides support in making decisions and is designed specifically for the forging industry. The aim of a beginning research project (T7) has been started in order to develop a universal approach to logistically and monetarily evaluate measures in production.
AB - The Collaborate Research Centre 489 (SFB 489) at the Institute for Production Systems (IFA) developed a Logistic Information System which provides support in making decisions and is designed specifically for the forging industry. The aim of a beginning research project (T7) has been started in order to develop a universal approach to logistically and monetarily evaluate measures in production.
KW - Production management
KW - Production measures
KW - Sales-logistics performance-curve
UR - http://www.scopus.com/inward/record.url?scp=84877748074&partnerID=8YFLogxK
M3 - Beitrag in Publikumszeitung/-zeitschrift
AN - SCOPUS:84877748074
VL - 18
SP - 38
EP - 40
JO - Productivity Management
JF - Productivity Management
SN - 1868-8519
ER -