Details
Original language | English |
---|---|
Publication status | Published - 2017 |
Event | EGU General Assembly 2017 - Wien, Austria Duration: 23 Apr 2017 → 28 Apr 2017 |
Conference
Conference | EGU General Assembly 2017 |
---|---|
Country/Territory | Austria |
City | Wien |
Period | 23 Apr 2017 → 28 Apr 2017 |
Cite this
- Standard
- Harvard
- Apa
- Vancouver
- BibTeX
- RIS
Temporal synthesis of long continuous precipitation series for unobserved locations. / Callaú-Beyer, Ana Claudia; Leimbach, Sören; Haberlandt, Uwe.
2017. Abstract from EGU General Assembly 2017, Wien, Austria.
2017. Abstract from EGU General Assembly 2017, Wien, Austria.
Research output: Contribution to conference › Abstract › Research
Callaú-Beyer, AC, Leimbach, S & Haberlandt, U 2017, 'Temporal synthesis of long continuous precipitation series for unobserved locations', EGU General Assembly 2017, Wien, Austria, 23 Apr 2017 - 28 Apr 2017. https://doi.org/10.15488/3652
Callaú-Beyer, A. C., Leimbach, S., & Haberlandt, U. (2017). Temporal synthesis of long continuous precipitation series for unobserved locations. Abstract from EGU General Assembly 2017, Wien, Austria. https://doi.org/10.15488/3652
Callaú-Beyer AC, Leimbach S, Haberlandt U. Temporal synthesis of long continuous precipitation series for unobserved locations. 2017. Abstract from EGU General Assembly 2017, Wien, Austria. doi: 10.15488/3652
Download
@conference{1a0b2f67975c445e8f06d4a86086b868,
title = "Temporal synthesis of long continuous precipitation series for unobserved locations",
author = "Calla{\'u}-Beyer, {Ana Claudia} and S{\"o}ren Leimbach and Uwe Haberlandt",
year = "2017",
doi = "10.15488/3652",
language = "English",
note = "EGU General Assembly 2017 ; Conference date: 23-04-2017 Through 28-04-2017",
}
Download
TY - CONF
T1 - Temporal synthesis of long continuous precipitation series for unobserved locations
AU - Callaú-Beyer, Ana Claudia
AU - Leimbach, Sören
AU - Haberlandt, Uwe
PY - 2017
Y1 - 2017
U2 - 10.15488/3652
DO - 10.15488/3652
M3 - Abstract
T2 - EGU General Assembly 2017
Y2 - 23 April 2017 through 28 April 2017
ER -