Projektkonfiguration in der Fabrikplanung Methode zur Restrukturierung von Fertigungs- und Montagebereichen

Research output: Contribution to journalArticleResearchpeer review

Authors

  • Felix Bussemer
  • J. Schmitz
  • Peter Nyhuis
View graph of relations

Details

Translated title of the contributionConfiguration of factory planning projects. Method for restructuring manufacturing and assembly areas
Original languageGerman
Pages (from-to)240-244
Number of pages5
JournalWT Werkstattstechnik
Volume108
Issue number4
Publication statusPublished - 2018

Abstract

The following article discusses the basics of factory planning- and restructuring projects as well as the challenges of project configuration. On this basis, the state of the art is explained and the research gap is shown. Then, a description of the selected modelling approach of the configuration method and a final summary of the results will be provided.

ASJC Scopus subject areas

Cite this

Projektkonfiguration in der Fabrikplanung Methode zur Restrukturierung von Fertigungs- und Montagebereichen. / Bussemer, Felix; Schmitz, J.; Nyhuis, Peter.
In: WT Werkstattstechnik, Vol. 108, No. 4, 2018, p. 240-244.

Research output: Contribution to journalArticleResearchpeer review

Bussemer F, Schmitz J, Nyhuis P. Projektkonfiguration in der Fabrikplanung Methode zur Restrukturierung von Fertigungs- und Montagebereichen. WT Werkstattstechnik. 2018;108(4):240-244. doi: 10.37544/1436-4980-2018-04-46
Bussemer, Felix ; Schmitz, J. ; Nyhuis, Peter. / Projektkonfiguration in der Fabrikplanung Methode zur Restrukturierung von Fertigungs- und Montagebereichen. In: WT Werkstattstechnik. 2018 ; Vol. 108, No. 4. pp. 240-244.
Download
@article{2a74d0792207497182c05914ffdacc5b,
title = "Projektkonfiguration in der Fabrikplanung Methode zur Restrukturierung von Fertigungs- und Montagebereichen",
abstract = "The following article discusses the basics of factory planning- and restructuring projects as well as the challenges of project configuration. On this basis, the state of the art is explained and the research gap is shown. Then, a description of the selected modelling approach of the configuration method and a final summary of the results will be provided.",
author = "Felix Bussemer and J. Schmitz and Peter Nyhuis",
year = "2018",
doi = "10.37544/1436-4980-2018-04-46",
language = "Deutsch",
volume = "108",
pages = "240--244",
number = "4",

}

Download

TY - JOUR

T1 - Projektkonfiguration in der Fabrikplanung Methode zur Restrukturierung von Fertigungs- und Montagebereichen

AU - Bussemer, Felix

AU - Schmitz, J.

AU - Nyhuis, Peter

PY - 2018

Y1 - 2018

N2 - The following article discusses the basics of factory planning- and restructuring projects as well as the challenges of project configuration. On this basis, the state of the art is explained and the research gap is shown. Then, a description of the selected modelling approach of the configuration method and a final summary of the results will be provided.

AB - The following article discusses the basics of factory planning- and restructuring projects as well as the challenges of project configuration. On this basis, the state of the art is explained and the research gap is shown. Then, a description of the selected modelling approach of the configuration method and a final summary of the results will be provided.

UR - http://www.scopus.com/inward/record.url?scp=85078057266&partnerID=8YFLogxK

U2 - 10.37544/1436-4980-2018-04-46

DO - 10.37544/1436-4980-2018-04-46

M3 - Artikel

AN - SCOPUS:85078057266

VL - 108

SP - 240

EP - 244

JO - WT Werkstattstechnik

JF - WT Werkstattstechnik

IS - 4

ER -