Details
Translated title of the contribution | Setup sequence optimization: Impact on productivity and throughput time |
---|---|
Original language | German |
Pages | 61-64 |
Number of pages | 4 |
Volume | 18 |
Issue number | 5 |
Journal | Productivity Management |
Publication status | Published - 21 Nov 2013 |
Abstract
Reduce setup time. Setup time is waste. Those who misunderstand this basic principle of Lean Management might possibly end up in a simple trap. Under the condition of sequence-dependent setup times a trade-off between productivity of a production system and throughput time performance of orders exists, which can only be addressed by a logistic positioning.
ASJC Scopus subject areas
- Business, Management and Accounting(all)
- General Business,Management and Accounting
- Engineering(all)
- Industrial and Manufacturing Engineering
Cite this
- Standard
- Harvard
- Apa
- Vancouver
- BibTeX
- RIS
In: Productivity Management, Vol. 18, No. 5, 21.11.2013, p. 61-64.
Research output: Contribution to specialist publication › Contribution in non-scientific journal › Transfer
}
TY - GEN
T1 - Optimierung der Rüstreihenfolge
T2 - Auswirkungen auf Produktivität und Durchlaufzeit
AU - Eilmann, Jörn
AU - Münzberg, Ben
AU - Nyhuis, Peter
PY - 2013/11/21
Y1 - 2013/11/21
N2 - Reduce setup time. Setup time is waste. Those who misunderstand this basic principle of Lean Management might possibly end up in a simple trap. Under the condition of sequence-dependent setup times a trade-off between productivity of a production system and throughput time performance of orders exists, which can only be addressed by a logistic positioning.
AB - Reduce setup time. Setup time is waste. Those who misunderstand this basic principle of Lean Management might possibly end up in a simple trap. Under the condition of sequence-dependent setup times a trade-off between productivity of a production system and throughput time performance of orders exists, which can only be addressed by a logistic positioning.
KW - Logistics
KW - Production
KW - Sequence- dependent setup times
KW - Sequencing
UR - http://www.scopus.com/inward/record.url?scp=84887750964&partnerID=8YFLogxK
M3 - Beitrag in Publikumszeitung/-zeitschrift
AN - SCOPUS:84887750964
VL - 18
SP - 61
EP - 64
JO - Productivity Management
JF - Productivity Management
SN - 1868-8519
ER -