Optimierung der Rüstreihenfolge: Auswirkungen auf Produktivität und Durchlaufzeit

Research output: Contribution to specialist publicationContribution in non-scientific journalTransfer

Authors

  • Jörn Eilmann
  • Ben Münzberg
  • Peter Nyhuis
View graph of relations

Details

Translated title of the contributionSetup sequence optimization: Impact on productivity and throughput time
Original languageGerman
Pages61-64
Number of pages4
Volume18
Issue number5
JournalProductivity Management
Publication statusPublished - 21 Nov 2013

Abstract

Reduce setup time. Setup time is waste. Those who misunderstand this basic principle of Lean Management might possibly end up in a simple trap. Under the condition of sequence-dependent setup times a trade-off between productivity of a production system and throughput time performance of orders exists, which can only be addressed by a logistic positioning.

ASJC Scopus subject areas

Cite this

Optimierung der Rüstreihenfolge: Auswirkungen auf Produktivität und Durchlaufzeit. / Eilmann, Jörn; Münzberg, Ben; Nyhuis, Peter.
In: Productivity Management, Vol. 18, No. 5, 21.11.2013, p. 61-64.

Research output: Contribution to specialist publicationContribution in non-scientific journalTransfer

Eilmann, J, Münzberg, B & Nyhuis, P 2013, 'Optimierung der Rüstreihenfolge: Auswirkungen auf Produktivität und Durchlaufzeit' Productivity Management, vol. 18, no. 5, pp. 61-64.
Eilmann, J., Münzberg, B., & Nyhuis, P. (2013). Optimierung der Rüstreihenfolge: Auswirkungen auf Produktivität und Durchlaufzeit. Productivity Management, 18(5), 61-64.
Eilmann J, Münzberg B, Nyhuis P. Optimierung der Rüstreihenfolge: Auswirkungen auf Produktivität und Durchlaufzeit. Productivity Management. 2013 Nov 21;18(5):61-64.
Eilmann, Jörn ; Münzberg, Ben ; Nyhuis, Peter. / Optimierung der Rüstreihenfolge : Auswirkungen auf Produktivität und Durchlaufzeit. In: Productivity Management. 2013 ; Vol. 18, No. 5. pp. 61-64.
Download
@misc{c826d60d7d1c4b78a7c8f51dcf940602,
title = "Optimierung der R{\"u}streihenfolge: Auswirkungen auf Produktivit{\"a}t und Durchlaufzeit",
abstract = "Reduce setup time. Setup time is waste. Those who misunderstand this basic principle of Lean Management might possibly end up in a simple trap. Under the condition of sequence-dependent setup times a trade-off between productivity of a production system and throughput time performance of orders exists, which can only be addressed by a logistic positioning.",
keywords = "Logistics, Production, Sequence- dependent setup times, Sequencing",
author = "J{\"o}rn Eilmann and Ben M{\"u}nzberg and Peter Nyhuis",
year = "2013",
month = nov,
day = "21",
language = "Deutsch",
volume = "18",
pages = "61--64",

}

Download

TY - GEN

T1 - Optimierung der Rüstreihenfolge

T2 - Auswirkungen auf Produktivität und Durchlaufzeit

AU - Eilmann, Jörn

AU - Münzberg, Ben

AU - Nyhuis, Peter

PY - 2013/11/21

Y1 - 2013/11/21

N2 - Reduce setup time. Setup time is waste. Those who misunderstand this basic principle of Lean Management might possibly end up in a simple trap. Under the condition of sequence-dependent setup times a trade-off between productivity of a production system and throughput time performance of orders exists, which can only be addressed by a logistic positioning.

AB - Reduce setup time. Setup time is waste. Those who misunderstand this basic principle of Lean Management might possibly end up in a simple trap. Under the condition of sequence-dependent setup times a trade-off between productivity of a production system and throughput time performance of orders exists, which can only be addressed by a logistic positioning.

KW - Logistics

KW - Production

KW - Sequence- dependent setup times

KW - Sequencing

UR - http://www.scopus.com/inward/record.url?scp=84887750964&partnerID=8YFLogxK