Life-cycle financial modelling of long term infrastructure projects "PPP-BOT Projects" under uncertainty and risk

Research output: Chapter in book/report/conference proceedingConference contributionResearchpeer review

Authors

  • M. Attarzadeh
  • D.K.H. Chua
  • L. Zhu
  • M. Beer

External Research Organisations

  • National University of Singapore
  • University of Liverpool
View graph of relations

Details

Original languageEnglish
Title of host publicationLife-Cycle and Sustainability of Civil Infrastructure Systems
Subtitle of host publicationProceedings of the 3rd International Symposium on Life-Cycle Civil Engineering, IALCCE 2012
EditorsAlfred Strauss
Place of PublicationBoca Raton
Pages991-996
Number of pages6
Publication statusPublished - 2012
Externally publishedYes
Event3rd International Symposium on Life-Cycle Civil Engineering (IALCCE 2012) - Vienna, Austria
Duration: 3 Oct 20126 Oct 2012
Conference number: 3

Abstract

Economic modelling and risk analysis are important tools in the appraisal of long term infrastructure and revenue-generating PPP-BOT projects. Analysis of a project is usually performed by considering a number of different scenarios and risk assumptions. The paper will attempt to develop a generalized model for analyzing life cycle financial modelling of PPP-BOT projects, which will provide the much required level of detail. In addition to sensitivity analysis of various risks at any specific time of the project, the proposed model is expected to provide their suitable management and control mechanisms. Various performance measures thus formulated, will together build the general economic model for PPP-BOT projects. Dealing with uncertainty and risk will be addressed by using decision making under uncertainty and risk methods via a case study.

ASJC Scopus subject areas

Cite this

Life-cycle financial modelling of long term infrastructure projects "PPP-BOT Projects" under uncertainty and risk. / Attarzadeh, M.; Chua, D.K.H.; Zhu, L. et al.
Life-Cycle and Sustainability of Civil Infrastructure Systems: Proceedings of the 3rd International Symposium on Life-Cycle Civil Engineering, IALCCE 2012. ed. / Alfred Strauss. Boca Raton, 2012. p. 991-996.

Research output: Chapter in book/report/conference proceedingConference contributionResearchpeer review

Attarzadeh, M, Chua, DKH, Zhu, L & Beer, M 2012, Life-cycle financial modelling of long term infrastructure projects "PPP-BOT Projects" under uncertainty and risk. in A Strauss (ed.), Life-Cycle and Sustainability of Civil Infrastructure Systems: Proceedings of the 3rd International Symposium on Life-Cycle Civil Engineering, IALCCE 2012. Boca Raton, pp. 991-996, 3rd International Symposium on Life-Cycle Civil Engineering (IALCCE 2012), Vienna, Austria, 3 Oct 2012. <http://b-dig.iie.org.mx/BibDig2/P12-0373/pdf/CH131.pdf>
Attarzadeh, M., Chua, D. K. H., Zhu, L., & Beer, M. (2012). Life-cycle financial modelling of long term infrastructure projects "PPP-BOT Projects" under uncertainty and risk. In A. Strauss (Ed.), Life-Cycle and Sustainability of Civil Infrastructure Systems: Proceedings of the 3rd International Symposium on Life-Cycle Civil Engineering, IALCCE 2012 (pp. 991-996). http://b-dig.iie.org.mx/BibDig2/P12-0373/pdf/CH131.pdf
Attarzadeh M, Chua DKH, Zhu L, Beer M. Life-cycle financial modelling of long term infrastructure projects "PPP-BOT Projects" under uncertainty and risk. In Strauss A, editor, Life-Cycle and Sustainability of Civil Infrastructure Systems: Proceedings of the 3rd International Symposium on Life-Cycle Civil Engineering, IALCCE 2012. Boca Raton. 2012. p. 991-996
Attarzadeh, M. ; Chua, D.K.H. ; Zhu, L. et al. / Life-cycle financial modelling of long term infrastructure projects "PPP-BOT Projects" under uncertainty and risk. Life-Cycle and Sustainability of Civil Infrastructure Systems: Proceedings of the 3rd International Symposium on Life-Cycle Civil Engineering, IALCCE 2012. editor / Alfred Strauss. Boca Raton, 2012. pp. 991-996
Download
@inproceedings{6790520d3d9b48b28b28b39dce86598d,
title = "Life-cycle financial modelling of long term infrastructure projects {"}PPP-BOT Projects{"} under uncertainty and risk",
abstract = "Economic modelling and risk analysis are important tools in the appraisal of long term infrastructure and revenue-generating PPP-BOT projects. Analysis of a project is usually performed by considering a number of different scenarios and risk assumptions. The paper will attempt to develop a generalized model for analyzing life cycle financial modelling of PPP-BOT projects, which will provide the much required level of detail. In addition to sensitivity analysis of various risks at any specific time of the project, the proposed model is expected to provide their suitable management and control mechanisms. Various performance measures thus formulated, will together build the general economic model for PPP-BOT projects. Dealing with uncertainty and risk will be addressed by using decision making under uncertainty and risk methods via a case study.",
author = "M. Attarzadeh and D.K.H. Chua and L. Zhu and M. Beer",
year = "2012",
language = "English",
isbn = "9780415621267",
pages = "991--996",
editor = "Alfred Strauss",
booktitle = "Life-Cycle and Sustainability of Civil Infrastructure Systems",
note = "3rd International Symposium on Life-Cycle Civil Engineering (IALCCE 2012), IALCCE 2012 ; Conference date: 03-10-2012 Through 06-10-2012",

}

Download

TY - GEN

T1 - Life-cycle financial modelling of long term infrastructure projects "PPP-BOT Projects" under uncertainty and risk

AU - Attarzadeh, M.

AU - Chua, D.K.H.

AU - Zhu, L.

AU - Beer, M.

N1 - Conference code: 3

PY - 2012

Y1 - 2012

N2 - Economic modelling and risk analysis are important tools in the appraisal of long term infrastructure and revenue-generating PPP-BOT projects. Analysis of a project is usually performed by considering a number of different scenarios and risk assumptions. The paper will attempt to develop a generalized model for analyzing life cycle financial modelling of PPP-BOT projects, which will provide the much required level of detail. In addition to sensitivity analysis of various risks at any specific time of the project, the proposed model is expected to provide their suitable management and control mechanisms. Various performance measures thus formulated, will together build the general economic model for PPP-BOT projects. Dealing with uncertainty and risk will be addressed by using decision making under uncertainty and risk methods via a case study.

AB - Economic modelling and risk analysis are important tools in the appraisal of long term infrastructure and revenue-generating PPP-BOT projects. Analysis of a project is usually performed by considering a number of different scenarios and risk assumptions. The paper will attempt to develop a generalized model for analyzing life cycle financial modelling of PPP-BOT projects, which will provide the much required level of detail. In addition to sensitivity analysis of various risks at any specific time of the project, the proposed model is expected to provide their suitable management and control mechanisms. Various performance measures thus formulated, will together build the general economic model for PPP-BOT projects. Dealing with uncertainty and risk will be addressed by using decision making under uncertainty and risk methods via a case study.

UR - http://www.scopus.com/inward/record.url?scp=84874514538&partnerID=8YFLogxK

M3 - Conference contribution

AN - SCOPUS:84874514538

SN - 9780415621267

SP - 991

EP - 996

BT - Life-Cycle and Sustainability of Civil Infrastructure Systems

A2 - Strauss, Alfred

CY - Boca Raton

T2 - 3rd International Symposium on Life-Cycle Civil Engineering (IALCCE 2012)

Y2 - 3 October 2012 through 6 October 2012

ER -

By the same author(s)