Details
Original language | English |
---|---|
Pages (from-to) | 73-78 |
Number of pages | 6 |
Journal | Production Engineering |
Volume | 2 |
Issue number | 1 |
Early online date | 4 Dec 2007 |
Publication status | Published - Apr 2008 |
Cite this
- Standard
- Harvard
- Apa
- Vancouver
- BibTeX
- RIS
In: Production Engineering, Vol. 2, No. 1, 04.2008, p. 73-78.
Research output: Contribution to journal › Article › Research › peer review
}
TY - JOUR
T1 - Key performance indicators for sheet metal forming processes
AU - Behrens, Bernd-Arno
AU - Lau, Philipp
N1 - Funding information: Acknowledgments The research project ‘‘Auswahl und Optimie-rung von Prozessketten fuer den Bereich Blechumformung’’ (AiF 14442 N) is funded with budget resources of the German Federal Ministry of Economics and Labour (BMWA) by the German Federation of Industrial Research Associations ‘‘Otto von Guericke’’ (AiF e. V.) and attended by the European Research Association for Sheet Metal Working (EFB e. V.). The design of the work piece, the selection of an appropriate material for a given geometry and the choice of the production technology are supported by FEM-Simulations and generally completed by specialized in-house departments. Besides the material selection, the geometry of the part and the production technology are chosen from a technical point of view: realizing the product and meeting the requirements for the product. The main challenge is to find the best way of producing the work piece most effectively and economically with the existing machines in the respective company. Therefore, the production processes have to be evaluated regarding different criteria. Those criteria in general are: ‘‘cost-saving’’, ‘‘delivery performance’’ or ‘‘in-time delivery’’. The criterion ‘‘quality of part’’ as a pre-condition is expected to be met as a matter of principle. Consequently, the aim of this project is to develop performance indicators to survey the effectiveness of sheet metal forming processes.
PY - 2008/4
Y1 - 2008/4
UR - http://www.scopus.com/inward/record.url?eid=2-s2.0-78651552504&partnerID=MN8TOARS
U2 - 10.1007/s11740-007-0076-y
DO - 10.1007/s11740-007-0076-y
M3 - Article
VL - 2
SP - 73
EP - 78
JO - Production Engineering
JF - Production Engineering
SN - 0944-6524
IS - 1
ER -