Details
Translated title of the contribution | Integrated evaluation of capability and cost effectiveness |
---|---|
Original language | German |
Pages (from-to) | 505-510 |
Number of pages | 6 |
Journal | Zeitschrift für wirtschaftlichen Fabrikbetrieb (ZWF) (online) |
Volume | 103 |
Issue number | 7-8 |
Publication status | Published - Aug 2008 |
Abstract
An integrated evaluation concerning capability and costs in the offer phase of production systems. The planning of cyclically interlinked flexible production lines with respect to output and price is a complex planning task. Manufacturers of such systems ensure capability and price already in the bidding phase despite high-level uncertainty due to dynamic system behaviour. A new approach to integrate capability and piece costs in one characteristic curve allows comparing and evaluating system configuration alternatives.
ASJC Scopus subject areas
- Engineering(all)
- General Engineering
- Business, Management and Accounting(all)
- Strategy and Management
- Decision Sciences(all)
- Management Science and Operations Research
Cite this
- Standard
- Harvard
- Apa
- Vancouver
- BibTeX
- RIS
In: Zeitschrift für wirtschaftlichen Fabrikbetrieb (ZWF) (online), Vol. 103, No. 7-8, 08.2008, p. 505-510.
Research output: Contribution to journal › Article › Research › peer review
}
TY - JOUR
T1 - Integrierte Leistungs- und Wirtschaftlichkeitsbewertung
AU - Overmeyer, Ludger
AU - Dreyer, Jens
AU - Altmann, Dirk
AU - Nickel, Rouven
PY - 2008/8
Y1 - 2008/8
N2 - An integrated evaluation concerning capability and costs in the offer phase of production systems. The planning of cyclically interlinked flexible production lines with respect to output and price is a complex planning task. Manufacturers of such systems ensure capability and price already in the bidding phase despite high-level uncertainty due to dynamic system behaviour. A new approach to integrate capability and piece costs in one characteristic curve allows comparing and evaluating system configuration alternatives.
AB - An integrated evaluation concerning capability and costs in the offer phase of production systems. The planning of cyclically interlinked flexible production lines with respect to output and price is a complex planning task. Manufacturers of such systems ensure capability and price already in the bidding phase despite high-level uncertainty due to dynamic system behaviour. A new approach to integrate capability and piece costs in one characteristic curve allows comparing and evaluating system configuration alternatives.
UR - http://www.scopus.com/inward/record.url?scp=52449094220&partnerID=8YFLogxK
U2 - 10.3139/104.101315
DO - 10.3139/104.101315
M3 - Artikel
AN - SCOPUS:52449094220
VL - 103
SP - 505
EP - 510
JO - Zeitschrift für wirtschaftlichen Fabrikbetrieb (ZWF) (online)
JF - Zeitschrift für wirtschaftlichen Fabrikbetrieb (ZWF) (online)
SN - 0947-0085
IS - 7-8
ER -