Details
Translated title of the contribution | Integrated design and operation methodology for offshore megastructures |
---|---|
Original language | German |
Pages | 563-570 |
Number of pages | 8 |
Volume | 98 |
Issue number | 8 |
Journal | BAUTECHNIK |
Publication status | Published - 13 Aug 2021 |
Abstract
Integrated design and operation methodology for offshore megastructures. The collaborative research centre 1463 “Integrated Design and Operation Methodology for Offshore Megastructures” was established by the German Research Foundation in January 2021 for an initial period of four years. In 15 sub-projects, researches from five institutions under the leadership of Leibniz University Hannover are investigating and developing new methods to realize future offshore wind turbines with a rated power of > 20 MW as a significant contribution to a renewable energy supply.
ASJC Scopus subject areas
- Engineering(all)
- Civil and Structural Engineering
- Engineering(all)
- Building and Construction
Sustainable Development Goals
Cite this
- Standard
- Harvard
- Apa
- Vancouver
- BibTeX
- RIS
In: BAUTECHNIK, Vol. 98, No. 8, 13.08.2021, p. 563-570.
Research output: Contribution to specialist publication › Contribution in non-scientific journal › Transfer
}
TY - GEN
T1 - Integrierte Entwurfs- und Betriebsmethodik für Offshore-Megastrukturen
AU - Schuster, Daniel
AU - Hente, Christian
AU - Hübler, Clemens
AU - Rolfes, Raimund
PY - 2021/8/13
Y1 - 2021/8/13
N2 - Integrated design and operation methodology for offshore megastructures. The collaborative research centre 1463 “Integrated Design and Operation Methodology for Offshore Megastructures” was established by the German Research Foundation in January 2021 for an initial period of four years. In 15 sub-projects, researches from five institutions under the leadership of Leibniz University Hannover are investigating and developing new methods to realize future offshore wind turbines with a rated power of > 20 MW as a significant contribution to a renewable energy supply.
AB - Integrated design and operation methodology for offshore megastructures. The collaborative research centre 1463 “Integrated Design and Operation Methodology for Offshore Megastructures” was established by the German Research Foundation in January 2021 for an initial period of four years. In 15 sub-projects, researches from five institutions under the leadership of Leibniz University Hannover are investigating and developing new methods to realize future offshore wind turbines with a rated power of > 20 MW as a significant contribution to a renewable energy supply.
KW - digital twin
KW - integrated design methodology
KW - integrated operation methodology
KW - offshore megastructures
KW - offshore wind energy
KW - Structural mechanics
KW - wind energy
UR - http://www.scopus.com/inward/record.url?scp=85111124948&partnerID=8YFLogxK
U2 - 10.1002/bate.202100044
DO - 10.1002/bate.202100044
M3 - Beitrag in Publikumszeitung/-zeitschrift
AN - SCOPUS:85111124948
VL - 98
SP - 563
EP - 570
JO - BAUTECHNIK
JF - BAUTECHNIK
SN - 0932-8351
ER -