Loading [MathJax]/extensions/tex2jax.js

Gestaltung von Regenerationslieferketten: Bewertung der Synchronität mithilfe des Bereitstellungsdiagrammes

Research output: Contribution to journalArticleResearchpeer review

Authors

  • Thorben Kuprat
  • Matthias Schmidt
  • Peter Nyhuis
Plum Print visual indicator of research metrics
  • Citations
    • Citation Indexes: 2
  • Captures
    • Readers: 1
see details

Details

Translated title of the contributionDesign of regeneration supply chains - Evaluating synchronicity by the use of supply diagrams
Original languageGerman
Pages (from-to)809-812
Number of pages4
JournalZeitschrift für wirtschaftlichen Fabrikbetrieb (ZWF) (online)
Volume111
Issue number12
Publication statusPublished - Dec 2016

Abstract

Design of Regeneration Supply Chains – Evaluating Synchronicity by the Use of Supply Diagrams. Apart from economic requirements regeneration service providers are confronted with high logistic demands. From a customer’s perspective downtimes of regenerating goods need to be kept at a low level. For the regeneration service provider it is therefore inevitable to deliver the prepared regeneration goods prompt and on schedule. Short throughput times and high schedule reliabilities reflect these logistic demands. To reach those requirements, a temporal and quantitative coordination of the supply chain’s material flows is necessary. It is possible to describe the coordination of material flows by using a supply diagram. The determination of the supply diagram based on an alternative approach as well as its use to assess the synchrony of material flows will be discussed.

ASJC Scopus subject areas

Cite this

Gestaltung von Regenerationslieferketten: Bewertung der Synchronität mithilfe des Bereitstellungsdiagrammes. / Kuprat, Thorben; Schmidt, Matthias; Nyhuis, Peter.
In: Zeitschrift für wirtschaftlichen Fabrikbetrieb (ZWF) (online), Vol. 111, No. 12, 12.2016, p. 809-812.

Research output: Contribution to journalArticleResearchpeer review

Download
@article{dbd05440d9ec4d079d6ca7cf68be51aa,
title = "Gestaltung von Regenerationslieferketten: Bewertung der Synchronit{\"a}t mithilfe des Bereitstellungsdiagrammes",
abstract = "Design of Regeneration Supply Chains – Evaluating Synchronicity by the Use of Supply Diagrams. Apart from economic requirements regeneration service providers are confronted with high logistic demands. From a customer{\textquoteright}s perspective downtimes of regenerating goods need to be kept at a low level. For the regeneration service provider it is therefore inevitable to deliver the prepared regeneration goods prompt and on schedule. Short throughput times and high schedule reliabilities reflect these logistic demands. To reach those requirements, a temporal and quantitative coordination of the supply chain{\textquoteright}s material flows is necessary. It is possible to describe the coordination of material flows by using a supply diagram. The determination of the supply diagram based on an alternative approach as well as its use to assess the synchrony of material flows will be discussed.",
author = "Thorben Kuprat and Matthias Schmidt and Peter Nyhuis",
year = "2016",
month = dec,
doi = "10.3139/104.111640",
language = "Deutsch",
volume = "111",
pages = "809--812",
journal = "Zeitschrift f{\"u}r wirtschaftlichen Fabrikbetrieb (ZWF) (online)",
issn = "0947-0085",
publisher = "de Gruyter",
number = "12",

}

Download

TY - JOUR

T1 - Gestaltung von Regenerationslieferketten

T2 - Bewertung der Synchronität mithilfe des Bereitstellungsdiagrammes

AU - Kuprat, Thorben

AU - Schmidt, Matthias

AU - Nyhuis, Peter

PY - 2016/12

Y1 - 2016/12

N2 - Design of Regeneration Supply Chains – Evaluating Synchronicity by the Use of Supply Diagrams. Apart from economic requirements regeneration service providers are confronted with high logistic demands. From a customer’s perspective downtimes of regenerating goods need to be kept at a low level. For the regeneration service provider it is therefore inevitable to deliver the prepared regeneration goods prompt and on schedule. Short throughput times and high schedule reliabilities reflect these logistic demands. To reach those requirements, a temporal and quantitative coordination of the supply chain’s material flows is necessary. It is possible to describe the coordination of material flows by using a supply diagram. The determination of the supply diagram based on an alternative approach as well as its use to assess the synchrony of material flows will be discussed.

AB - Design of Regeneration Supply Chains – Evaluating Synchronicity by the Use of Supply Diagrams. Apart from economic requirements regeneration service providers are confronted with high logistic demands. From a customer’s perspective downtimes of regenerating goods need to be kept at a low level. For the regeneration service provider it is therefore inevitable to deliver the prepared regeneration goods prompt and on schedule. Short throughput times and high schedule reliabilities reflect these logistic demands. To reach those requirements, a temporal and quantitative coordination of the supply chain’s material flows is necessary. It is possible to describe the coordination of material flows by using a supply diagram. The determination of the supply diagram based on an alternative approach as well as its use to assess the synchrony of material flows will be discussed.

UR - http://www.scopus.com/inward/record.url?scp=85019218137&partnerID=8YFLogxK

U2 - 10.3139/104.111640

DO - 10.3139/104.111640

M3 - Artikel

AN - SCOPUS:85019218137

VL - 111

SP - 809

EP - 812

JO - Zeitschrift für wirtschaftlichen Fabrikbetrieb (ZWF) (online)

JF - Zeitschrift für wirtschaftlichen Fabrikbetrieb (ZWF) (online)

SN - 0947-0085

IS - 12

ER -