Details
Original language | Undefined/Unknown |
---|---|
Publication status | Published - Nov 2013 |
Cite this
- Standard
- Harvard
- Apa
- Vancouver
- BibTeX
- RIS
First Results on Resource-Constrained Project Scheduling with Model-Endogenous Decision on the Project Structure. / Kellenbrink, Carolin.
2013.
2013.
Research output: Other contribution › Other publication › Research › peer review
Kellenbrink C. First Results on Resource-Constrained Project Scheduling with Model-Endogenous Decision on the Project Structure. 2013. doi: 10.1007/978-3-319-00795-3_64
Download
@misc{dfd748eaac3648b3a8dcaf638a9a8b67,
title = "First Results on Resource-Constrained Project Scheduling with Model-Endogenous Decision on the Project Structure",
author = "Carolin Kellenbrink",
year = "2013",
month = nov,
doi = "10.1007/978-3-319-00795-3_64",
language = "Undefined/Unknown",
type = "Other",
}
Download
TY - GEN
T1 - First Results on Resource-Constrained Project Scheduling with Model-Endogenous Decision on the Project Structure
AU - Kellenbrink, Carolin
PY - 2013/11
Y1 - 2013/11
U2 - 10.1007/978-3-319-00795-3_64
DO - 10.1007/978-3-319-00795-3_64
M3 - Sonstige Publikation
ER -