Details
Translated title of the contribution | Stockout costs in production |
---|---|
Original language | German |
Pages (from-to) | 444-449 |
Number of pages | 6 |
Journal | ZWF Zeitschrift fuer Wirtschaftlichen Fabrikbetrieb |
Volume | 105 |
Issue number | 5 |
Publication status | Published - May 2010 |
Abstract
Up to the present day literature has already dealt with sto- ckout-costs, but methods to quantify these costs have not been developed until now. The absence of these kinds of methods prevents an efficient logistical positioning between stockout- costs and the costs for holding safety-stocks. The costs for safety-stocks in a warehouse to provide a desired service-level can already be determined, but the stockout-costs connected with a desired service-level cannot be quantified yet. This article introduces a mathematical function to quantify the costs in a company's production caused by missing material, depending on the amount of missing material and its missing time.
ASJC Scopus subject areas
- Engineering(all)
- General Engineering
- Business, Management and Accounting(all)
- Strategy and Management
- Decision Sciences(all)
- Management Science and Operations Research
Cite this
- Standard
- Harvard
- Apa
- Vancouver
- BibTeX
- RIS
In: ZWF Zeitschrift fuer Wirtschaftlichen Fabrikbetrieb, Vol. 105, No. 5, 05.2010, p. 444-449.
Research output: Contribution to journal › Article › Research › peer review
}
TY - JOUR
T1 - Fehlmengenkosten in der Produktion
AU - Gärtner, Henner
AU - Nyhuis, Peter
AU - Prüssing, Patrick
PY - 2010/5
Y1 - 2010/5
N2 - Up to the present day literature has already dealt with sto- ckout-costs, but methods to quantify these costs have not been developed until now. The absence of these kinds of methods prevents an efficient logistical positioning between stockout- costs and the costs for holding safety-stocks. The costs for safety-stocks in a warehouse to provide a desired service-level can already be determined, but the stockout-costs connected with a desired service-level cannot be quantified yet. This article introduces a mathematical function to quantify the costs in a company's production caused by missing material, depending on the amount of missing material and its missing time.
AB - Up to the present day literature has already dealt with sto- ckout-costs, but methods to quantify these costs have not been developed until now. The absence of these kinds of methods prevents an efficient logistical positioning between stockout- costs and the costs for holding safety-stocks. The costs for safety-stocks in a warehouse to provide a desired service-level can already be determined, but the stockout-costs connected with a desired service-level cannot be quantified yet. This article introduces a mathematical function to quantify the costs in a company's production caused by missing material, depending on the amount of missing material and its missing time.
UR - http://www.scopus.com/inward/record.url?scp=77953821700&partnerID=8YFLogxK
M3 - Artikel
AN - SCOPUS:77953821700
VL - 105
SP - 444
EP - 449
JO - ZWF Zeitschrift fuer Wirtschaftlichen Fabrikbetrieb
JF - ZWF Zeitschrift fuer Wirtschaftlichen Fabrikbetrieb
SN - 0947-0085
IS - 5
ER -