Fehlmengenkosten in der Produktion

Research output: Contribution to journalArticleResearchpeer review

Authors

  • Henner Gärtner
  • Peter Nyhuis
  • Patrick Prüssing

External Research Organisations

  • Institut für integrierte Produktion Hannover (IPH)
View graph of relations

Details

Translated title of the contributionStockout costs in production
Original languageGerman
Pages (from-to)444-449
Number of pages6
JournalZWF Zeitschrift fuer Wirtschaftlichen Fabrikbetrieb
Volume105
Issue number5
Publication statusPublished - May 2010

Abstract

Up to the present day literature has already dealt with sto- ckout-costs, but methods to quantify these costs have not been developed until now. The absence of these kinds of methods prevents an efficient logistical positioning between stockout- costs and the costs for holding safety-stocks. The costs for safety-stocks in a warehouse to provide a desired service-level can already be determined, but the stockout-costs connected with a desired service-level cannot be quantified yet. This article introduces a mathematical function to quantify the costs in a company's production caused by missing material, depending on the amount of missing material and its missing time.

ASJC Scopus subject areas

Cite this

Fehlmengenkosten in der Produktion. / Gärtner, Henner; Nyhuis, Peter; Prüssing, Patrick.
In: ZWF Zeitschrift fuer Wirtschaftlichen Fabrikbetrieb, Vol. 105, No. 5, 05.2010, p. 444-449.

Research output: Contribution to journalArticleResearchpeer review

Gärtner, H, Nyhuis, P & Prüssing, P 2010, 'Fehlmengenkosten in der Produktion', ZWF Zeitschrift fuer Wirtschaftlichen Fabrikbetrieb, vol. 105, no. 5, pp. 444-449.
Gärtner, H., Nyhuis, P., & Prüssing, P. (2010). Fehlmengenkosten in der Produktion. ZWF Zeitschrift fuer Wirtschaftlichen Fabrikbetrieb, 105(5), 444-449.
Gärtner H, Nyhuis P, Prüssing P. Fehlmengenkosten in der Produktion. ZWF Zeitschrift fuer Wirtschaftlichen Fabrikbetrieb. 2010 May;105(5):444-449.
Gärtner, Henner ; Nyhuis, Peter ; Prüssing, Patrick. / Fehlmengenkosten in der Produktion. In: ZWF Zeitschrift fuer Wirtschaftlichen Fabrikbetrieb. 2010 ; Vol. 105, No. 5. pp. 444-449.
Download
@article{e064ff8200df44e8833e0dfba5b176d1,
title = "Fehlmengenkosten in der Produktion",
abstract = "Up to the present day literature has already dealt with sto- ckout-costs, but methods to quantify these costs have not been developed until now. The absence of these kinds of methods prevents an efficient logistical positioning between stockout- costs and the costs for holding safety-stocks. The costs for safety-stocks in a warehouse to provide a desired service-level can already be determined, but the stockout-costs connected with a desired service-level cannot be quantified yet. This article introduces a mathematical function to quantify the costs in a company's production caused by missing material, depending on the amount of missing material and its missing time.",
author = "Henner G{\"a}rtner and Peter Nyhuis and Patrick Pr{\"u}ssing",
year = "2010",
month = may,
language = "Deutsch",
volume = "105",
pages = "444--449",
number = "5",

}

Download

TY - JOUR

T1 - Fehlmengenkosten in der Produktion

AU - Gärtner, Henner

AU - Nyhuis, Peter

AU - Prüssing, Patrick

PY - 2010/5

Y1 - 2010/5

N2 - Up to the present day literature has already dealt with sto- ckout-costs, but methods to quantify these costs have not been developed until now. The absence of these kinds of methods prevents an efficient logistical positioning between stockout- costs and the costs for holding safety-stocks. The costs for safety-stocks in a warehouse to provide a desired service-level can already be determined, but the stockout-costs connected with a desired service-level cannot be quantified yet. This article introduces a mathematical function to quantify the costs in a company's production caused by missing material, depending on the amount of missing material and its missing time.

AB - Up to the present day literature has already dealt with sto- ckout-costs, but methods to quantify these costs have not been developed until now. The absence of these kinds of methods prevents an efficient logistical positioning between stockout- costs and the costs for holding safety-stocks. The costs for safety-stocks in a warehouse to provide a desired service-level can already be determined, but the stockout-costs connected with a desired service-level cannot be quantified yet. This article introduces a mathematical function to quantify the costs in a company's production caused by missing material, depending on the amount of missing material and its missing time.

UR - http://www.scopus.com/inward/record.url?scp=77953821700&partnerID=8YFLogxK

M3 - Artikel

AN - SCOPUS:77953821700

VL - 105

SP - 444

EP - 449

JO - ZWF Zeitschrift fuer Wirtschaftlichen Fabrikbetrieb

JF - ZWF Zeitschrift fuer Wirtschaftlichen Fabrikbetrieb

SN - 0947-0085

IS - 5

ER -