Exploring Effects of Sequencing Modes towards Logistics Target Achievement on the Example of Steel Production

Research output: Contribution to journalConference articleResearchpeer review

Authors

  • Katja Windt
  • Peter Nyhuis
  • Oliver Herr

External Research Organisations

  • Jacobs University Bremen
View graph of relations

Details

Original languageEnglish
Pages (from-to)620-625
Number of pages6
JournalProcedia CIRP
Volume3
Issue number1
Publication statusPublished - 15 Aug 2012
Event45th CIRP Conference on Manufacturing Systems, CMS 2012 - Athens, Greece
Duration: 16 May 201218 May 2012

Abstract

The objective of this paper is to discuss the logistics target conflict of achieving both low set-up costs and high due-date reliability. We are introducing first approaches towards a methodology dealing with this target conflict which enables a strategic positioning on behalf of new Sequencing Operating Curves. Based on an industry case study in the steel industry, we are describing the problem of batching and sequencing under highly demanding technologically constraints. Analysis based on industry data display the extent of the described problem in practice.

Keywords

    Due date reliabiltiy, Industry case study, Logistics targets, Production control, Steel production sequencing

ASJC Scopus subject areas

Cite this

Exploring Effects of Sequencing Modes towards Logistics Target Achievement on the Example of Steel Production. / Windt, Katja; Nyhuis, Peter; Herr, Oliver.
In: Procedia CIRP, Vol. 3, No. 1, 15.08.2012, p. 620-625.

Research output: Contribution to journalConference articleResearchpeer review

Windt K, Nyhuis P, Herr O. Exploring Effects of Sequencing Modes towards Logistics Target Achievement on the Example of Steel Production. Procedia CIRP. 2012 Aug 15;3(1):620-625. doi: 10.1016/j.procir.2012.07.106
Windt, Katja ; Nyhuis, Peter ; Herr, Oliver. / Exploring Effects of Sequencing Modes towards Logistics Target Achievement on the Example of Steel Production. In: Procedia CIRP. 2012 ; Vol. 3, No. 1. pp. 620-625.
Download
@article{abf6515fab93419c902254807090b2bf,
title = "Exploring Effects of Sequencing Modes towards Logistics Target Achievement on the Example of Steel Production",
abstract = "The objective of this paper is to discuss the logistics target conflict of achieving both low set-up costs and high due-date reliability. We are introducing first approaches towards a methodology dealing with this target conflict which enables a strategic positioning on behalf of new Sequencing Operating Curves. Based on an industry case study in the steel industry, we are describing the problem of batching and sequencing under highly demanding technologically constraints. Analysis based on industry data display the extent of the described problem in practice.",
keywords = "Due date reliabiltiy, Industry case study, Logistics targets, Production control, Steel production sequencing",
author = "Katja Windt and Peter Nyhuis and Oliver Herr",
year = "2012",
month = aug,
day = "15",
doi = "10.1016/j.procir.2012.07.106",
language = "English",
volume = "3",
pages = "620--625",
number = "1",
note = "45th CIRP Conference on Manufacturing Systems, CMS 2012 ; Conference date: 16-05-2012 Through 18-05-2012",

}

Download

TY - JOUR

T1 - Exploring Effects of Sequencing Modes towards Logistics Target Achievement on the Example of Steel Production

AU - Windt, Katja

AU - Nyhuis, Peter

AU - Herr, Oliver

PY - 2012/8/15

Y1 - 2012/8/15

N2 - The objective of this paper is to discuss the logistics target conflict of achieving both low set-up costs and high due-date reliability. We are introducing first approaches towards a methodology dealing with this target conflict which enables a strategic positioning on behalf of new Sequencing Operating Curves. Based on an industry case study in the steel industry, we are describing the problem of batching and sequencing under highly demanding technologically constraints. Analysis based on industry data display the extent of the described problem in practice.

AB - The objective of this paper is to discuss the logistics target conflict of achieving both low set-up costs and high due-date reliability. We are introducing first approaches towards a methodology dealing with this target conflict which enables a strategic positioning on behalf of new Sequencing Operating Curves. Based on an industry case study in the steel industry, we are describing the problem of batching and sequencing under highly demanding technologically constraints. Analysis based on industry data display the extent of the described problem in practice.

KW - Due date reliabiltiy

KW - Industry case study

KW - Logistics targets

KW - Production control

KW - Steel production sequencing

UR - http://www.scopus.com/inward/record.url?scp=84879193263&partnerID=8YFLogxK

U2 - 10.1016/j.procir.2012.07.106

DO - 10.1016/j.procir.2012.07.106

M3 - Conference article

AN - SCOPUS:84879193263

VL - 3

SP - 620

EP - 625

JO - Procedia CIRP

JF - Procedia CIRP

SN - 2212-8271

IS - 1

T2 - 45th CIRP Conference on Manufacturing Systems, CMS 2012

Y2 - 16 May 2012 through 18 May 2012

ER -