Abstract
The objective of this paper is to discuss the logistics target conflict of achieving both low set-up costs and high due-date reliability. We are introducing first approaches towards a methodology dealing with this target conflict which enables a strategic positioning on behalf of new Sequencing Operating Curves. Based on an industry case study in the steel industry, we are describing the problem of batching and sequencing under highly demanding technologically constraints. Analysis based on industry data display the extent of the described problem in practice.
Keywords
- Due date reliabiltiy, Industry case study, Logistics targets, Production control, Steel production sequencing
ASJC Scopus subject areas
- Engineering(all)
- Control and Systems Engineering
- Engineering(all)
- Industrial and Manufacturing Engineering
Cite this
- Standard
- Harvard
- Apa
- Vancouver
- BibTeX
- RIS
In: Procedia CIRP, Vol. 3, No. 1, 15.08.2012, p. 620-625.
Research output: Contribution to journal › Conference article › Research › peer review
}
TY - JOUR
T1 - Exploring Effects of Sequencing Modes towards Logistics Target Achievement on the Example of Steel Production
AU - Windt, Katja
AU - Nyhuis, Peter
AU - Herr, Oliver
PY - 2012/8/15
Y1 - 2012/8/15
N2 - The objective of this paper is to discuss the logistics target conflict of achieving both low set-up costs and high due-date reliability. We are introducing first approaches towards a methodology dealing with this target conflict which enables a strategic positioning on behalf of new Sequencing Operating Curves. Based on an industry case study in the steel industry, we are describing the problem of batching and sequencing under highly demanding technologically constraints. Analysis based on industry data display the extent of the described problem in practice.
AB - The objective of this paper is to discuss the logistics target conflict of achieving both low set-up costs and high due-date reliability. We are introducing first approaches towards a methodology dealing with this target conflict which enables a strategic positioning on behalf of new Sequencing Operating Curves. Based on an industry case study in the steel industry, we are describing the problem of batching and sequencing under highly demanding technologically constraints. Analysis based on industry data display the extent of the described problem in practice.
KW - Due date reliabiltiy
KW - Industry case study
KW - Logistics targets
KW - Production control
KW - Steel production sequencing
UR - http://www.scopus.com/inward/record.url?scp=84879193263&partnerID=8YFLogxK
U2 - 10.1016/j.procir.2012.07.106
DO - 10.1016/j.procir.2012.07.106
M3 - Conference article
AN - SCOPUS:84879193263
VL - 3
SP - 620
EP - 625
JO - Procedia CIRP
JF - Procedia CIRP
SN - 2212-8271
IS - 1
T2 - 45th CIRP Conference on Manufacturing Systems, CMS 2012
Y2 - 16 May 2012 through 18 May 2012
ER -