Details
Translated title of the contribution | Working up a temporal dynamic method of calculation with consideration of capacitive factors |
---|---|
Original language | German |
Pages (from-to) | 157-160 |
Number of pages | 4 |
Journal | ZWF Zeitschrift fuer Wirtschaftlichen Fabrikbetrieb |
Volume | 106 |
Issue number | 3 |
Publication status | Published - Mar 2011 |
Abstract
A time-dynamic calculation approach considering capacitive factors. The tool and mould making Industry needs an individual calculation because of their typical unique manufacturing and their attention to customer requirements. At the same time prices and dates of delivery are already fixed in the phase of supply planning. This leads to high demands on cost calculation and job order planning. Today a variety of supporting software systems is offered. However, they hardly consider time-dynamic components and prevent a transparent time-based argumentation. This paper presents an approach to a "time-dynamic calculation", which allows a time and capacity related price argumentation. First of all the situation of the tool and mould making industry is described and current approaches to price argumentations are described and evaluated. On this basis the Institute of Production Engineering and Machine Tools (IFW) of the Leibniz Unlversität Hannover is developing a concept to integrate time-dynamic components in the supply planning.
ASJC Scopus subject areas
- Engineering(all)
- General Engineering
- Business, Management and Accounting(all)
- Strategy and Management
- Decision Sciences(all)
- Management Science and Operations Research
Cite this
- Standard
- Harvard
- Apa
- Vancouver
- BibTeX
- RIS
In: ZWF Zeitschrift fuer Wirtschaftlichen Fabrikbetrieb, Vol. 106, No. 3, 03.2011, p. 157-160.
Research output: Contribution to journal › Article › Research › peer review
}
TY - JOUR
T1 - Erarbeitung einer zeitdynamischen Kalkulationsmethode unter Einbeziehung kapazitiver Einflüsse
AU - Denkena, Berend
AU - Nemeti, Andrea
AU - Schürmeyer, Jan
AU - Köller, Marian
PY - 2011/3
Y1 - 2011/3
N2 - A time-dynamic calculation approach considering capacitive factors. The tool and mould making Industry needs an individual calculation because of their typical unique manufacturing and their attention to customer requirements. At the same time prices and dates of delivery are already fixed in the phase of supply planning. This leads to high demands on cost calculation and job order planning. Today a variety of supporting software systems is offered. However, they hardly consider time-dynamic components and prevent a transparent time-based argumentation. This paper presents an approach to a "time-dynamic calculation", which allows a time and capacity related price argumentation. First of all the situation of the tool and mould making industry is described and current approaches to price argumentations are described and evaluated. On this basis the Institute of Production Engineering and Machine Tools (IFW) of the Leibniz Unlversität Hannover is developing a concept to integrate time-dynamic components in the supply planning.
AB - A time-dynamic calculation approach considering capacitive factors. The tool and mould making Industry needs an individual calculation because of their typical unique manufacturing and their attention to customer requirements. At the same time prices and dates of delivery are already fixed in the phase of supply planning. This leads to high demands on cost calculation and job order planning. Today a variety of supporting software systems is offered. However, they hardly consider time-dynamic components and prevent a transparent time-based argumentation. This paper presents an approach to a "time-dynamic calculation", which allows a time and capacity related price argumentation. First of all the situation of the tool and mould making industry is described and current approaches to price argumentations are described and evaluated. On this basis the Institute of Production Engineering and Machine Tools (IFW) of the Leibniz Unlversität Hannover is developing a concept to integrate time-dynamic components in the supply planning.
UR - http://www.scopus.com/inward/record.url?scp=79955700291&partnerID=8YFLogxK
U2 - 10.3139/104.110525
DO - 10.3139/104.110525
M3 - Artikel
AN - SCOPUS:79955700291
VL - 106
SP - 157
EP - 160
JO - ZWF Zeitschrift fuer Wirtschaftlichen Fabrikbetrieb
JF - ZWF Zeitschrift fuer Wirtschaftlichen Fabrikbetrieb
SN - 0947-0085
IS - 3
ER -