Electromagnetic compatibility analysis of unstructured mains networks for high-speed data transmission: Part 1

Research output: Contribution to journalArticleResearchpeer review

Authors

  • S. Battermann
  • H. Garbe
  • F. Silva
  • M. Pous
  • V. Beauvois
  • K. Vantomme
  • J. Catrysse
  • J. Newbury
  • V. Degardin
  • M. Liénard
  • P. Degauque
  • I. D. Flintoft
  • A. D. Papatsoris
  • D. W. Welsh
  • A. C. Marvin

External Research Organisations

  • Universitat Politècnica de Catalunya
  • University of Liege
  • Katholieke Hogeschool Brugge-Oostende
  • Open University
  • Lille 1 University of Science and Technology
  • Univ. York, Dep. Comput. Sci., Non-Stand. Comput. Group
View graph of relations

Details

Original languageEnglish
Pages (from-to)146-153
Number of pages8
JournalIET Science, Measurement and Technology
Volume2
Issue number3
Publication statusPublished - May 2008

Abstract

Different approaches for the characterisation of relevant parameters of the low-voltage mains network, used for high-speed data transmission (BPL, broadband over power line) are described. Part 1 of the paper depicts the disturbance scenario of these BPL devices and the motivation will be given for the development of a new measurement procedure in CISPR for the estimation of the high-frequency characteristics of AC mains network. The improvements of the measurement method is not restricted to BPL applications, but can also be applied to other wire-based telecommunication systems. Part 2 of the paper shows the definitions and comparisons of different symmetry factors. The transfer of the results on the compliance test for BPL devices will be shown.

ASJC Scopus subject areas

Cite this

Electromagnetic compatibility analysis of unstructured mains networks for high-speed data transmission: Part 1. / Battermann, S.; Garbe, H.; Silva, F. et al.
In: IET Science, Measurement and Technology, Vol. 2, No. 3, 05.2008, p. 146-153.

Research output: Contribution to journalArticleResearchpeer review

Battermann, S, Garbe, H, Silva, F, Pous, M, Beauvois, V, Vantomme, K, Catrysse, J, Newbury, J, Degardin, V, Liénard, M, Degauque, P, Flintoft, ID, Papatsoris, AD, Welsh, DW & Marvin, AC 2008, 'Electromagnetic compatibility analysis of unstructured mains networks for high-speed data transmission: Part 1', IET Science, Measurement and Technology, vol. 2, no. 3, pp. 146-153. https://doi.org/10.1049/iet-smt:20070055
Battermann, S., Garbe, H., Silva, F., Pous, M., Beauvois, V., Vantomme, K., Catrysse, J., Newbury, J., Degardin, V., Liénard, M., Degauque, P., Flintoft, I. D., Papatsoris, A. D., Welsh, D. W., & Marvin, A. C. (2008). Electromagnetic compatibility analysis of unstructured mains networks for high-speed data transmission: Part 1. IET Science, Measurement and Technology, 2(3), 146-153. https://doi.org/10.1049/iet-smt:20070055
Battermann S, Garbe H, Silva F, Pous M, Beauvois V, Vantomme K et al. Electromagnetic compatibility analysis of unstructured mains networks for high-speed data transmission: Part 1. IET Science, Measurement and Technology. 2008 May;2(3):146-153. doi: 10.1049/iet-smt:20070055
Download
@article{8526ec401653465782582874e28fee8c,
title = "Electromagnetic compatibility analysis of unstructured mains networks for high-speed data transmission: Part 1",
abstract = "Different approaches for the characterisation of relevant parameters of the low-voltage mains network, used for high-speed data transmission (BPL, broadband over power line) are described. Part 1 of the paper depicts the disturbance scenario of these BPL devices and the motivation will be given for the development of a new measurement procedure in CISPR for the estimation of the high-frequency characteristics of AC mains network. The improvements of the measurement method is not restricted to BPL applications, but can also be applied to other wire-based telecommunication systems. Part 2 of the paper shows the definitions and comparisons of different symmetry factors. The transfer of the results on the compliance test for BPL devices will be shown.",
author = "S. Battermann and H. Garbe and F. Silva and M. Pous and V. Beauvois and K. Vantomme and J. Catrysse and J. Newbury and V. Degardin and M. Li{\'e}nard and P. Degauque and Flintoft, {I. D.} and Papatsoris, {A. D.} and Welsh, {D. W.} and Marvin, {A. C.}",
year = "2008",
month = may,
doi = "10.1049/iet-smt:20070055",
language = "English",
volume = "2",
pages = "146--153",
journal = "IET Science, Measurement and Technology",
issn = "1751-8822",
publisher = "Institution of Engineering and Technology",
number = "3",

}

Download

TY - JOUR

T1 - Electromagnetic compatibility analysis of unstructured mains networks for high-speed data transmission

T2 - Part 1

AU - Battermann, S.

AU - Garbe, H.

AU - Silva, F.

AU - Pous, M.

AU - Beauvois, V.

AU - Vantomme, K.

AU - Catrysse, J.

AU - Newbury, J.

AU - Degardin, V.

AU - Liénard, M.

AU - Degauque, P.

AU - Flintoft, I. D.

AU - Papatsoris, A. D.

AU - Welsh, D. W.

AU - Marvin, A. C.

PY - 2008/5

Y1 - 2008/5

N2 - Different approaches for the characterisation of relevant parameters of the low-voltage mains network, used for high-speed data transmission (BPL, broadband over power line) are described. Part 1 of the paper depicts the disturbance scenario of these BPL devices and the motivation will be given for the development of a new measurement procedure in CISPR for the estimation of the high-frequency characteristics of AC mains network. The improvements of the measurement method is not restricted to BPL applications, but can also be applied to other wire-based telecommunication systems. Part 2 of the paper shows the definitions and comparisons of different symmetry factors. The transfer of the results on the compliance test for BPL devices will be shown.

AB - Different approaches for the characterisation of relevant parameters of the low-voltage mains network, used for high-speed data transmission (BPL, broadband over power line) are described. Part 1 of the paper depicts the disturbance scenario of these BPL devices and the motivation will be given for the development of a new measurement procedure in CISPR for the estimation of the high-frequency characteristics of AC mains network. The improvements of the measurement method is not restricted to BPL applications, but can also be applied to other wire-based telecommunication systems. Part 2 of the paper shows the definitions and comparisons of different symmetry factors. The transfer of the results on the compliance test for BPL devices will be shown.

UR - http://www.scopus.com/inward/record.url?scp=40749135739&partnerID=8YFLogxK

U2 - 10.1049/iet-smt:20070055

DO - 10.1049/iet-smt:20070055

M3 - Article

AN - SCOPUS:40749135739

VL - 2

SP - 146

EP - 153

JO - IET Science, Measurement and Technology

JF - IET Science, Measurement and Technology

SN - 1751-8822

IS - 3

ER -