Details
Translated title of the contribution | Adjusting the deviation of planned output curve increases the logistical performance |
---|---|
Original language | German |
Pages (from-to) | 708-717 |
Number of pages | 10 |
Journal | ZWF Zeitschrift fuer Wirtschaftlichen Fabrikbetrieb |
Volume | 109 |
Issue number | 10 |
Publication status | Published - Oct 2014 |
Abstract
Development of an impact model describing the planned output curve of workstations. The planned output curve is basically influenced by the function of lot sizing and scheduling within the production planning. Based on re-scheduling a temporary adjustment of workstation load can be conducted and therefore the variation of the planned output curve can be reduced. In this article a logistical model describing the adjustment of planned output curve by conducting load adjustment will be presented. Also the next steps of IFA in describing the planned output curve will be presented.
ASJC Scopus subject areas
- Engineering(all)
- General Engineering
- Business, Management and Accounting(all)
- Strategy and Management
- Decision Sciences(all)
- Management Science and Operations Research
Cite this
- Standard
- Harvard
- Apa
- Vancouver
- BibTeX
- RIS
In: ZWF Zeitschrift fuer Wirtschaftlichen Fabrikbetrieb, Vol. 109, No. 10, 10.2014, p. 708-717.
Research output: Contribution to journal › Article › Research › peer review
}
TY - JOUR
T1 - Einfluss von Planungsparametern auf die logistische Leistungsfähigkeit eines Arbeitssystems
T2 - Entwicklung eines Modells zur analytischen Beschreibung des Plan-Abgangs eines Arbeitssystems
AU - Grigutsch, Michael
AU - Nywlt, Johannes
AU - Bertsch, Sebastian
AU - Friese, Fabian
AU - Nyhuis, Peter
PY - 2014/10
Y1 - 2014/10
N2 - Development of an impact model describing the planned output curve of workstations. The planned output curve is basically influenced by the function of lot sizing and scheduling within the production planning. Based on re-scheduling a temporary adjustment of workstation load can be conducted and therefore the variation of the planned output curve can be reduced. In this article a logistical model describing the adjustment of planned output curve by conducting load adjustment will be presented. Also the next steps of IFA in describing the planned output curve will be presented.
AB - Development of an impact model describing the planned output curve of workstations. The planned output curve is basically influenced by the function of lot sizing and scheduling within the production planning. Based on re-scheduling a temporary adjustment of workstation load can be conducted and therefore the variation of the planned output curve can be reduced. In this article a logistical model describing the adjustment of planned output curve by conducting load adjustment will be presented. Also the next steps of IFA in describing the planned output curve will be presented.
UR - http://www.scopus.com/inward/record.url?scp=85019171824&partnerID=8YFLogxK
U2 - 10.3139/104.111217
DO - 10.3139/104.111217
M3 - Artikel
AN - SCOPUS:85019171824
VL - 109
SP - 708
EP - 717
JO - ZWF Zeitschrift fuer Wirtschaftlichen Fabrikbetrieb
JF - ZWF Zeitschrift fuer Wirtschaftlichen Fabrikbetrieb
SN - 0947-0085
IS - 10
ER -