Einfluss von Planungsparametern auf die logistische Leistungsfähigkeit eines Arbeitssystems: Entwicklung eines Modells zur analytischen Beschreibung des Plan-Abgangs eines Arbeitssystems

Research output: Contribution to journalArticleResearchpeer review

Authors

  • Michael Grigutsch
  • Johannes Nywlt
  • Sebastian Bertsch
  • Fabian Friese
  • Peter Nyhuis
View graph of relations

Details

Translated title of the contributionAdjusting the deviation of planned output curve increases the logistical performance
Original languageGerman
Pages (from-to)708-717
Number of pages10
JournalZWF Zeitschrift fuer Wirtschaftlichen Fabrikbetrieb
Volume109
Issue number10
Publication statusPublished - Oct 2014

Abstract

Development of an impact model describing the planned output curve of workstations. The planned output curve is basically influenced by the function of lot sizing and scheduling within the production planning. Based on re-scheduling a temporary adjustment of workstation load can be conducted and therefore the variation of the planned output curve can be reduced. In this article a logistical model describing the adjustment of planned output curve by conducting load adjustment will be presented. Also the next steps of IFA in describing the planned output curve will be presented.

ASJC Scopus subject areas

Cite this

Einfluss von Planungsparametern auf die logistische Leistungsfähigkeit eines Arbeitssystems: Entwicklung eines Modells zur analytischen Beschreibung des Plan-Abgangs eines Arbeitssystems. / Grigutsch, Michael; Nywlt, Johannes; Bertsch, Sebastian et al.
In: ZWF Zeitschrift fuer Wirtschaftlichen Fabrikbetrieb, Vol. 109, No. 10, 10.2014, p. 708-717.

Research output: Contribution to journalArticleResearchpeer review

Grigutsch, M, Nywlt, J, Bertsch, S, Friese, F & Nyhuis, P 2014, 'Einfluss von Planungsparametern auf die logistische Leistungsfähigkeit eines Arbeitssystems: Entwicklung eines Modells zur analytischen Beschreibung des Plan-Abgangs eines Arbeitssystems', ZWF Zeitschrift fuer Wirtschaftlichen Fabrikbetrieb, vol. 109, no. 10, pp. 708-717. https://doi.org/10.3139/104.111217
Grigutsch M, Nywlt J, Bertsch S, Friese F, Nyhuis P. Einfluss von Planungsparametern auf die logistische Leistungsfähigkeit eines Arbeitssystems: Entwicklung eines Modells zur analytischen Beschreibung des Plan-Abgangs eines Arbeitssystems. ZWF Zeitschrift fuer Wirtschaftlichen Fabrikbetrieb. 2014 Oct;109(10):708-717. doi: 10.3139/104.111217
Grigutsch, Michael ; Nywlt, Johannes ; Bertsch, Sebastian et al. / Einfluss von Planungsparametern auf die logistische Leistungsfähigkeit eines Arbeitssystems : Entwicklung eines Modells zur analytischen Beschreibung des Plan-Abgangs eines Arbeitssystems. In: ZWF Zeitschrift fuer Wirtschaftlichen Fabrikbetrieb. 2014 ; Vol. 109, No. 10. pp. 708-717.
Download
@article{e04bce74cdd2452482d606251c6c230e,
title = "Einfluss von Planungsparametern auf die logistische Leistungsf{\"a}higkeit eines Arbeitssystems: Entwicklung eines Modells zur analytischen Beschreibung des Plan-Abgangs eines Arbeitssystems",
abstract = "Development of an impact model describing the planned output curve of workstations. The planned output curve is basically influenced by the function of lot sizing and scheduling within the production planning. Based on re-scheduling a temporary adjustment of workstation load can be conducted and therefore the variation of the planned output curve can be reduced. In this article a logistical model describing the adjustment of planned output curve by conducting load adjustment will be presented. Also the next steps of IFA in describing the planned output curve will be presented.",
author = "Michael Grigutsch and Johannes Nywlt and Sebastian Bertsch and Fabian Friese and Peter Nyhuis",
year = "2014",
month = oct,
doi = "10.3139/104.111217",
language = "Deutsch",
volume = "109",
pages = "708--717",
number = "10",

}

Download

TY - JOUR

T1 - Einfluss von Planungsparametern auf die logistische Leistungsfähigkeit eines Arbeitssystems

T2 - Entwicklung eines Modells zur analytischen Beschreibung des Plan-Abgangs eines Arbeitssystems

AU - Grigutsch, Michael

AU - Nywlt, Johannes

AU - Bertsch, Sebastian

AU - Friese, Fabian

AU - Nyhuis, Peter

PY - 2014/10

Y1 - 2014/10

N2 - Development of an impact model describing the planned output curve of workstations. The planned output curve is basically influenced by the function of lot sizing and scheduling within the production planning. Based on re-scheduling a temporary adjustment of workstation load can be conducted and therefore the variation of the planned output curve can be reduced. In this article a logistical model describing the adjustment of planned output curve by conducting load adjustment will be presented. Also the next steps of IFA in describing the planned output curve will be presented.

AB - Development of an impact model describing the planned output curve of workstations. The planned output curve is basically influenced by the function of lot sizing and scheduling within the production planning. Based on re-scheduling a temporary adjustment of workstation load can be conducted and therefore the variation of the planned output curve can be reduced. In this article a logistical model describing the adjustment of planned output curve by conducting load adjustment will be presented. Also the next steps of IFA in describing the planned output curve will be presented.

UR - http://www.scopus.com/inward/record.url?scp=85019171824&partnerID=8YFLogxK

U2 - 10.3139/104.111217

DO - 10.3139/104.111217

M3 - Artikel

AN - SCOPUS:85019171824

VL - 109

SP - 708

EP - 717

JO - ZWF Zeitschrift fuer Wirtschaftlichen Fabrikbetrieb

JF - ZWF Zeitschrift fuer Wirtschaftlichen Fabrikbetrieb

SN - 0947-0085

IS - 10

ER -