Details
Original language | English |
---|---|
Article number | 123512 |
Number of pages | 14 |
Journal | Technological Forecasting and Social Change |
Volume | 205 |
Early online date | 14 Jun 2024 |
Publication status | Published - Aug 2024 |
Abstract
The construction industry is believed to be more susceptible to human errors than other industries because of its unique characteristics, particularly when it comes to urban construction projects (UCP). Despite the considerable attention given to human errors in construction sector, there has been a lack of emphasis on analysing these errors in specific projects like construction in urban environments with distinct complexities. Hence, this paper seeks to determine and assess the critical factors influencing human errors associated with the UCP. In this vein, Three rounds of Delphi surveys were done with 17 specialists in safety and construction management. According to the Delphi survey results, 35 substantial factors that contribute to the incidence of human errors in the UCP were discovered. Then, an empirical questionnaire based on the 5-point Likert scale of measurement was developed and distributed among 37 construction experts to assess the level of impact that each factor on occurring human error in the UCP. The questionnaire had 35 influential factors related to human errors, categorised into five primary divisions (environmental, technological/information systems, individual (permanently related), individual (temporarily related), and organisational). Before the distribution, the reliability and validity of the questionnaire were evaluated and confirmed. The factors were ranked using the Step-wise Weight Assessment Ratio Analysis (SWARA) technique at this point. The research findings indicated that the criterion of “technological factors/information systems” is the most crucial, with the criterion of “individual factors (permanently related)” coming in second and the criterion of “environmental factors” coming in third. The sub-criterion “weak maintenance management systems” scores first in the general ranking of sub-criteria, indicating traditional network systems, the absence of appropriate tools and equipment, and a lack of understanding of required resources. The sub-criterion “defects in details and information and lack of design dynamism” is placed second, while the sub-criterion “violation of safety regulations (use of drugs, etc.)” is ranked third. The study results can help industry practitioners make more educated judgements to minimise and manage human errors in the UCP.
Keywords
- Construction industry, Delphi survey, Human error, Iran, SWARA technique, Urban construction
ASJC Scopus subject areas
- Business, Management and Accounting(all)
- Business and International Management
- Psychology(all)
- Applied Psychology
- Business, Management and Accounting(all)
- Management of Technology and Innovation
Cite this
- Standard
- Harvard
- Apa
- Vancouver
- BibTeX
- RIS
In: Technological Forecasting and Social Change, Vol. 205, 123512, 08.2024.
Research output: Contribution to journal › Article › Research › peer review
}
TY - JOUR
T1 - Determining the significant contributing factors to the occurrence of human errors in the urban construction projects
T2 - A Delphi-SWARA study approach
AU - Sarvari, Hadi
AU - Baghbaderani, Alireza Babaie
AU - Chan, Daniel W.M.
AU - Beer, Michael
N1 - Publisher Copyright: © 2024
PY - 2024/8
Y1 - 2024/8
N2 - The construction industry is believed to be more susceptible to human errors than other industries because of its unique characteristics, particularly when it comes to urban construction projects (UCP). Despite the considerable attention given to human errors in construction sector, there has been a lack of emphasis on analysing these errors in specific projects like construction in urban environments with distinct complexities. Hence, this paper seeks to determine and assess the critical factors influencing human errors associated with the UCP. In this vein, Three rounds of Delphi surveys were done with 17 specialists in safety and construction management. According to the Delphi survey results, 35 substantial factors that contribute to the incidence of human errors in the UCP were discovered. Then, an empirical questionnaire based on the 5-point Likert scale of measurement was developed and distributed among 37 construction experts to assess the level of impact that each factor on occurring human error in the UCP. The questionnaire had 35 influential factors related to human errors, categorised into five primary divisions (environmental, technological/information systems, individual (permanently related), individual (temporarily related), and organisational). Before the distribution, the reliability and validity of the questionnaire were evaluated and confirmed. The factors were ranked using the Step-wise Weight Assessment Ratio Analysis (SWARA) technique at this point. The research findings indicated that the criterion of “technological factors/information systems” is the most crucial, with the criterion of “individual factors (permanently related)” coming in second and the criterion of “environmental factors” coming in third. The sub-criterion “weak maintenance management systems” scores first in the general ranking of sub-criteria, indicating traditional network systems, the absence of appropriate tools and equipment, and a lack of understanding of required resources. The sub-criterion “defects in details and information and lack of design dynamism” is placed second, while the sub-criterion “violation of safety regulations (use of drugs, etc.)” is ranked third. The study results can help industry practitioners make more educated judgements to minimise and manage human errors in the UCP.
AB - The construction industry is believed to be more susceptible to human errors than other industries because of its unique characteristics, particularly when it comes to urban construction projects (UCP). Despite the considerable attention given to human errors in construction sector, there has been a lack of emphasis on analysing these errors in specific projects like construction in urban environments with distinct complexities. Hence, this paper seeks to determine and assess the critical factors influencing human errors associated with the UCP. In this vein, Three rounds of Delphi surveys were done with 17 specialists in safety and construction management. According to the Delphi survey results, 35 substantial factors that contribute to the incidence of human errors in the UCP were discovered. Then, an empirical questionnaire based on the 5-point Likert scale of measurement was developed and distributed among 37 construction experts to assess the level of impact that each factor on occurring human error in the UCP. The questionnaire had 35 influential factors related to human errors, categorised into five primary divisions (environmental, technological/information systems, individual (permanently related), individual (temporarily related), and organisational). Before the distribution, the reliability and validity of the questionnaire were evaluated and confirmed. The factors were ranked using the Step-wise Weight Assessment Ratio Analysis (SWARA) technique at this point. The research findings indicated that the criterion of “technological factors/information systems” is the most crucial, with the criterion of “individual factors (permanently related)” coming in second and the criterion of “environmental factors” coming in third. The sub-criterion “weak maintenance management systems” scores first in the general ranking of sub-criteria, indicating traditional network systems, the absence of appropriate tools and equipment, and a lack of understanding of required resources. The sub-criterion “defects in details and information and lack of design dynamism” is placed second, while the sub-criterion “violation of safety regulations (use of drugs, etc.)” is ranked third. The study results can help industry practitioners make more educated judgements to minimise and manage human errors in the UCP.
KW - Construction industry
KW - Delphi survey
KW - Human error
KW - Iran
KW - SWARA technique
KW - Urban construction
UR - http://www.scopus.com/inward/record.url?scp=85195842316&partnerID=8YFLogxK
U2 - 10.1016/j.techfore.2024.123512
DO - 10.1016/j.techfore.2024.123512
M3 - Article
AN - SCOPUS:85195842316
VL - 205
JO - Technological Forecasting and Social Change
JF - Technological Forecasting and Social Change
SN - 0040-1625
M1 - 123512
ER -