Data mining based configuration of cyclically interlinked production systems

Research output: Contribution to journalArticleResearchpeer review

Authors

  • Ludger Overmeyer
  • Jens Dreyer
  • Dirk Altmann

External Research Organisations

  • Institut für integrierte Produktion Hannover (IPH)
View graph of relations

Details

Original languageEnglish
Pages (from-to)493-496
Number of pages4
JournalCIRP Annals - Manufacturing Technology
Volume59
Issue number1
Publication statusPublished - 15 Apr 2010
Externally publishedYes

Abstract

Cyclically interlinked production systems are commonly used production facilities. During the bidding phase manufacturers of these systems assure customers about the performance and operating efficiency despite numerous uncertainties. Up to now, there has been no planning approach that could hedge these results. Recently however, a method for configuring cyclically interlinked production systems during the bidding phase has been developed in order to resolve this deficit. Data mining models are built to predict performance figures of production systems, whereas, characteristic curves are used to predict the operating efficiency of a system configuration. This paper introduces the challenge of bid proposal management and explains the developed method.

Keywords

    Planning, Production, System

ASJC Scopus subject areas

Cite this

Data mining based configuration of cyclically interlinked production systems. / Overmeyer, Ludger; Dreyer, Jens; Altmann, Dirk.
In: CIRP Annals - Manufacturing Technology, Vol. 59, No. 1, 15.04.2010, p. 493-496.

Research output: Contribution to journalArticleResearchpeer review

Overmeyer L, Dreyer J, Altmann D. Data mining based configuration of cyclically interlinked production systems. CIRP Annals - Manufacturing Technology. 2010 Apr 15;59(1):493-496. doi: 10.1016/j.cirp.2010.03.081
Overmeyer, Ludger ; Dreyer, Jens ; Altmann, Dirk. / Data mining based configuration of cyclically interlinked production systems. In: CIRP Annals - Manufacturing Technology. 2010 ; Vol. 59, No. 1. pp. 493-496.
Download
@article{cdf61f62e9264c40b6ef986ea0d6361f,
title = "Data mining based configuration of cyclically interlinked production systems",
abstract = "Cyclically interlinked production systems are commonly used production facilities. During the bidding phase manufacturers of these systems assure customers about the performance and operating efficiency despite numerous uncertainties. Up to now, there has been no planning approach that could hedge these results. Recently however, a method for configuring cyclically interlinked production systems during the bidding phase has been developed in order to resolve this deficit. Data mining models are built to predict performance figures of production systems, whereas, characteristic curves are used to predict the operating efficiency of a system configuration. This paper introduces the challenge of bid proposal management and explains the developed method.",
keywords = "Planning, Production, System",
author = "Ludger Overmeyer and Jens Dreyer and Dirk Altmann",
note = "Funding information: Parts of the research described in this paper were devised within the project “Methode zur Planung komplexer, produktions technischer Anlagen mit zyklischer Verkettung”, funded by the German Research Council (DFG) . Those involved in the realisation of the project include the IPH – Institute of Integrated Production Hannover GmbH as well as the Institute for Manufacturing Automation and Production Systems at Friedrich-Alexander-University in Erlangen-Nuremberg.",
year = "2010",
month = apr,
day = "15",
doi = "10.1016/j.cirp.2010.03.081",
language = "English",
volume = "59",
pages = "493--496",
journal = "CIRP Annals - Manufacturing Technology",
issn = "0007-8506",
publisher = "Elsevier USA",
number = "1",

}

Download

TY - JOUR

T1 - Data mining based configuration of cyclically interlinked production systems

AU - Overmeyer, Ludger

AU - Dreyer, Jens

AU - Altmann, Dirk

N1 - Funding information: Parts of the research described in this paper were devised within the project “Methode zur Planung komplexer, produktions technischer Anlagen mit zyklischer Verkettung”, funded by the German Research Council (DFG) . Those involved in the realisation of the project include the IPH – Institute of Integrated Production Hannover GmbH as well as the Institute for Manufacturing Automation and Production Systems at Friedrich-Alexander-University in Erlangen-Nuremberg.

PY - 2010/4/15

Y1 - 2010/4/15

N2 - Cyclically interlinked production systems are commonly used production facilities. During the bidding phase manufacturers of these systems assure customers about the performance and operating efficiency despite numerous uncertainties. Up to now, there has been no planning approach that could hedge these results. Recently however, a method for configuring cyclically interlinked production systems during the bidding phase has been developed in order to resolve this deficit. Data mining models are built to predict performance figures of production systems, whereas, characteristic curves are used to predict the operating efficiency of a system configuration. This paper introduces the challenge of bid proposal management and explains the developed method.

AB - Cyclically interlinked production systems are commonly used production facilities. During the bidding phase manufacturers of these systems assure customers about the performance and operating efficiency despite numerous uncertainties. Up to now, there has been no planning approach that could hedge these results. Recently however, a method for configuring cyclically interlinked production systems during the bidding phase has been developed in order to resolve this deficit. Data mining models are built to predict performance figures of production systems, whereas, characteristic curves are used to predict the operating efficiency of a system configuration. This paper introduces the challenge of bid proposal management and explains the developed method.

KW - Planning

KW - Production

KW - System

UR - http://www.scopus.com/inward/record.url?scp=77955337827&partnerID=8YFLogxK

U2 - 10.1016/j.cirp.2010.03.081

DO - 10.1016/j.cirp.2010.03.081

M3 - Article

AN - SCOPUS:77955337827

VL - 59

SP - 493

EP - 496

JO - CIRP Annals - Manufacturing Technology

JF - CIRP Annals - Manufacturing Technology

SN - 0007-8506

IS - 1

ER -