Loading [MathJax]/extensions/tex2jax.js

Continuous modelling of machine tool failure durations for improved production scheduling

Research output: Contribution to journalArticleResearchpeer review

Authors

  • B. Denkena
  • M.-a. Dittrich
  • L. Keunecke
  • S. Wilmsmeier

External Research Organisations

  • Volkswagen AG

Details

Original languageEnglish
Pages (from-to)207-215
Number of pages9
JournalProduction Engineering
Volume14
Issue number2
Publication statusPublished - 12 Feb 2020

Cite this

Continuous modelling of machine tool failure durations for improved production scheduling. / Denkena, B.; Dittrich, M.-a.; Keunecke, L. et al.
In: Production Engineering, Vol. 14, No. 2, 12.02.2020, p. 207-215.

Research output: Contribution to journalArticleResearchpeer review

Denkena, B, Dittrich, M, Keunecke, L & Wilmsmeier, S 2020, 'Continuous modelling of machine tool failure durations for improved production scheduling', Production Engineering, vol. 14, no. 2, pp. 207-215. https://doi.org/10.1007/s11740-020-00955-y
Denkena, B., Dittrich, M., Keunecke, L., & Wilmsmeier, S. (2020). Continuous modelling of machine tool failure durations for improved production scheduling. Production Engineering, 14(2), 207-215. https://doi.org/10.1007/s11740-020-00955-y
Denkena B, Dittrich M, Keunecke L, Wilmsmeier S. Continuous modelling of machine tool failure durations for improved production scheduling. Production Engineering. 2020 Feb 12;14(2):207-215. doi: 10.1007/s11740-020-00955-y
Denkena, B. ; Dittrich, M.-a. ; Keunecke, L. et al. / Continuous modelling of machine tool failure durations for improved production scheduling. In: Production Engineering. 2020 ; Vol. 14, No. 2. pp. 207-215.
Download
@article{13e2491ffaf54c7b982c8678c27afb9a,
title = "Continuous modelling of machine tool failure durations for improved production scheduling",
author = "B. Denkena and M.-a. Dittrich and L. Keunecke and S. Wilmsmeier",
note = "Funding information: Open Access funding provided by Projekt DEAL. The results presented in this paper were obtained within in the Collaborative Research Center 653 “Gentelligent Components in Their Lifecycle”. The authors would like to thank the German Research Foundation (DFG) for its financial support (Grant SFB653 T09).",
year = "2020",
month = feb,
day = "12",
doi = "10.1007/s11740-020-00955-y",
language = "English",
volume = "14",
pages = "207--215",
number = "2",

}

Download

TY - JOUR

T1 - Continuous modelling of machine tool failure durations for improved production scheduling

AU - Denkena, B.

AU - Dittrich, M.-a.

AU - Keunecke, L.

AU - Wilmsmeier, S.

N1 - Funding information: Open Access funding provided by Projekt DEAL. The results presented in this paper were obtained within in the Collaborative Research Center 653 “Gentelligent Components in Their Lifecycle”. The authors would like to thank the German Research Foundation (DFG) for its financial support (Grant SFB653 T09).

PY - 2020/2/12

Y1 - 2020/2/12

UR - http://www.scopus.com/inward/record.url?scp=85079420414&partnerID=8YFLogxK

U2 - 10.1007/s11740-020-00955-y

DO - 10.1007/s11740-020-00955-y

M3 - Article

VL - 14

SP - 207

EP - 215

JO - Production Engineering

JF - Production Engineering

SN - 0944-6524

IS - 2

ER -