Title of host publication | 2023 IEEE PES Innovative Smart Grid Technologies Europe (ISGT EUROPE) |
ISBN (electronic) | 979-8-3503-9678-2 |
Publication status | Published - 2023 |
Event | IEEE PES ISGT Europe 2023: Powering solutions for decarbonized and resilient future smartgrids - Grenoble, France, Grenoble, France Duration: 23 Oct 2023 → 26 Oct 2023 Conference number: 2023 https://ieee-isgt-europe.org/ |
Publication series
Name | IEEE PES Innovative Smart Grid Technologies Conference Europe |
---|
Abstract
With the ongoing electrification of heat and mobility a large amount of high-power devices is added to the distribution system level. Their so far assumed power behavior is expected to change in case of an active participation in emerging flexibility markets. Thus, conventional grid planning approaches, using simultaneity factors, incompletely map the utilization potentials of grids, which is challenging for distribution grid planners. In this paper, a new approach on active distribution grid planning under application of the feasible operation region (FOR) is presented to improve the integration of new devices by comprehensively identifying grid operation constraints. The FOR is aggregated at the vertical system interconnection by using a modified particle swarm optimization (PSO) method with an initial-points sampling strategy. As exemplary case-study a generic low-voltage network with simple string topology is used. By analyzing the accruing data from the PSO, the constraining limits of thermal line currents and transformer rating are focused. Results show, that specific limiting elements can be identified within the whole vertical PQ-area. The main contribution of this paper is the combination of grid operational application of the feasible active and reactive power area with grid planning purposes, which represents a new approach in contrast to existing literature. Through this approach, the necessity of line or transformer reinforcement is derivable, when integrating new power flexibility providing units (FPU). Also, the usage of available power flexibilities to postpone grid expansion is enhanced with better knowledge of the existing limits.
Keywords
- Active Distribution Grid Planning, Feasible Operation Region, Particle Swarm Optimization
ASJC Scopus subject areas
- Computer Science(all)
- Information Systems
- Computer Science(all)
- Computer Networks and Communications
Cite this
- Standard
- Harvard
- Apa
- Vancouver
- BibTeX
- RIS
2023 IEEE PES Innovative Smart Grid Technologies Europe (ISGT EUROPE). 2023. (IEEE PES Innovative Smart Grid Technologies Conference Europe).
Research output: Chapter in book/report/conference proceeding › Conference contribution › Research › peer review
}
TY - GEN
T1 - Approach on Active Distribution Grid Planning By Using the Feasible Operation Region
AU - Wingenfelder, Manuel
AU - Sarstedt, Marcel
AU - Hofmann, Lutz
N1 - Conference code: 2023
PY - 2023
Y1 - 2023
N2 - With the ongoing electrification of heat and mobility a large amount of high-power devices is added to the distribution system level. Their so far assumed power behavior is expected to change in case of an active participation in emerging flexibility markets. Thus, conventional grid planning approaches, using simultaneity factors, incompletely map the utilization potentials of grids, which is challenging for distribution grid planners. In this paper, a new approach on active distribution grid planning under application of the feasible operation region (FOR) is presented to improve the integration of new devices by comprehensively identifying grid operation constraints. The FOR is aggregated at the vertical system interconnection by using a modified particle swarm optimization (PSO) method with an initial-points sampling strategy. As exemplary case-study a generic low-voltage network with simple string topology is used. By analyzing the accruing data from the PSO, the constraining limits of thermal line currents and transformer rating are focused. Results show, that specific limiting elements can be identified within the whole vertical PQ-area. The main contribution of this paper is the combination of grid operational application of the feasible active and reactive power area with grid planning purposes, which represents a new approach in contrast to existing literature. Through this approach, the necessity of line or transformer reinforcement is derivable, when integrating new power flexibility providing units (FPU). Also, the usage of available power flexibilities to postpone grid expansion is enhanced with better knowledge of the existing limits.
AB - With the ongoing electrification of heat and mobility a large amount of high-power devices is added to the distribution system level. Their so far assumed power behavior is expected to change in case of an active participation in emerging flexibility markets. Thus, conventional grid planning approaches, using simultaneity factors, incompletely map the utilization potentials of grids, which is challenging for distribution grid planners. In this paper, a new approach on active distribution grid planning under application of the feasible operation region (FOR) is presented to improve the integration of new devices by comprehensively identifying grid operation constraints. The FOR is aggregated at the vertical system interconnection by using a modified particle swarm optimization (PSO) method with an initial-points sampling strategy. As exemplary case-study a generic low-voltage network with simple string topology is used. By analyzing the accruing data from the PSO, the constraining limits of thermal line currents and transformer rating are focused. Results show, that specific limiting elements can be identified within the whole vertical PQ-area. The main contribution of this paper is the combination of grid operational application of the feasible active and reactive power area with grid planning purposes, which represents a new approach in contrast to existing literature. Through this approach, the necessity of line or transformer reinforcement is derivable, when integrating new power flexibility providing units (FPU). Also, the usage of available power flexibilities to postpone grid expansion is enhanced with better knowledge of the existing limits.
KW - Active Distribution Grid Planning
KW - Feasible Operation Region
KW - Particle Swarm Optimization
UR - http://www.scopus.com/inward/record.url?scp=85182939539&partnerID=8YFLogxK
U2 - 10.1109/ISGTEUROPE56780.2023.10408253
DO - 10.1109/ISGTEUROPE56780.2023.10408253
M3 - Conference contribution
SN - 979-8-3503-9679-9
T3 - IEEE PES Innovative Smart Grid Technologies Conference Europe
BT - 2023 IEEE PES Innovative Smart Grid Technologies Europe (ISGT EUROPE)
T2 - IEEE PES ISGT Europe 2023
Y2 - 23 October 2023 through 26 October 2023
ER -