Within the project D1 of CRC 871 a new approach for capacity planning in terms of the regeneration of aircraft engines was developed. This approach will be enhanced in cooperation with a rail vehicle transformer manufacturer to consider the specific conditions and restrictions. Therefor a process model will be conveyed and different algorithms will be developed to enable capacity planning and load control as well as quotation costing at previously uncertain workload for regenerating rail vehicle transformers.