EE100-konkret

Implementation of a nature-compatible design of the energy transition to 100% renewable energy

Project: Research

Participants

  • Christina von Haaren (Principal Investigator)
  • Richard Hanke-Rauschenbach (Principal Investigator)
  • Michael Breitner (Principal Investigator)
  • Lutz Hofmann (Principal Investigator)
  • Julia Wiehe (Principal Investigator)
  • Julia Thiele (Project staff)
  • Anna Maria Walter (Project staff)
  • Malte Weller (Project staff)
View graph of relations

Details

Description

The energy transition is one of the central challenges of the 21st century and should be compatible with other sustainability goals. A conversion of the energy supply system must be designed landscape- and nature-compatible in consideration of human needs. The previous research project "EE 100" has shown that today’s established methods of production and instruments do not fulfill the challenges of such a human- and nature-compatible energy supply.
Firstly, this follow-up research project quantifies nature-compatible ‘reserves’ of power. This concerns energy potentials of alternative technologies and uncertainties in existing energy scenarios related to, for instance, species protection. The question of externalities and costs of a future nature-compatible energy system in comparison with other scenarios should also be considered in “EE100 konkret”.
In addition, the project investigates whether a nature-compatible design of networks and storage facilities is possible in the energy system. Closely linked to this is the question of correct dimensioning and spatial distribution of storage facilities that are required because of volatile production of wind and solar power.
Communication creates the final focus of this project. Unbiased dialogues with different target groups should prevent conflicts and obstacles in nature-compatible expansion of renewable energies, in the adaptation of supply technologies and in a transformed, more energy-conscious behavior (sufficiency). For this propose various professional disciplines and economic and social players will be involved.

???details???

AcronymEE100-konkret
StatusFinished
Start/end date1 Dec 201731 Oct 2020

Funding

Associates to

Funding type

Funding scheme