Organisation placeholder image, no image found

Faculty of Mechanical Engineering

Organisational unit: Faculty

Type of address: Visitor address.
An der Universität 1
30823
Garbsen
View graph of relations

Projects

  1. SIIRI: Collaborative Research Centre-Transregio 298, sub-project B04: Active stimulus-responsive implants

    Maier, H. J. (Principal Investigator) & Klose, C. (Principal Investigator)

    1 Jul 202131 Dec 2025

    Project: Research

  2. Fundamental Investigation into the Mechanisms of Ultrasonic Assisted Single-Component and Multi-Component Low Temperature Sintering for the Assembly of Power Electronic Components

    Twiefel, J. (Principal Investigator), Wurz, M. C. (Principal Investigator) & Dencker, F. (Principal Investigator)

    1 Jul 202131 Dec 2023

    Project: Research

  3. Laser-based Additive Manufacturing of Metal Parts from Powder in Microgravity

    Overmeyer, L. (Principal Investigator)

    1 Jul 202131 Dec 2024

    Project: Research

  4. Microstructure formation in selective laser melting of titanium alloys and influence on the machinability

    Denkena, B. (Principal Investigator)

    1 Jul 202130 Jun 2024

    Project: Research

  5. Kryo-Rasterelektronenmikroskop

    Endres, H. (Principal Investigator)

    15 Jun 202131 Dec 2023

    Project: Research

  6. Continuous Generating Cutting Tool Grinding 2

    Denkena, B. (Principal Investigator)

    1 May 202130 Apr 2023

    Project: Research

  7. Hannover Center for Microgravity Research

    Overmeyer, L. (Principal Investigator) & Rasel, E. M. (Co-Investigator)

    1 May 202131 Dec 2026

    Project: Research

  8. Increasing the strength of magnesium wrought alloy components by precipitation hardening

    Behrens, B. (Principal Investigator)

    1 May 202130 Apr 2023

    Project: Research

  9. WaVe: Innovationslabor: Nachhaltige Wasserstoff-Verbrennungskonzepte

    Dinkelacker, F. (Principal Investigator), Seume, J. R. (Principal Investigator) & Scharf, R. (Principal Investigator)

    1 May 202131 Oct 2024

    Project: Research

  10. Particle modification of niobium MASC alloys by processing under semi-levitation in a cold wall induction crucible

    Maier, H. J. (Principal Investigator) & Baake, E. (Principal Investigator)

    1 May 202130 Apr 2024

    Project: Research

  11. Kombiniertes System zur Fertigung und Vermessung von Prüfstands- und Instrumentierungskomponenten

    Seume, J. R. (Principal Investigator)

    14 Apr 202131 Dec 2022

    Project: Research

  12. Thermodynamical Topology Optimization For Consideration of Dissipative Material Properties

    Junker, P. (Principal Investigator)

    1 Apr 202131 Mar 2023

    Project: Research

  13. Flow Dynamics and heat Transfer in a geothermal two-phase thermosyphon (TPCT) based on a helically corrugated pipe

    Kabelac, S. (Principal Investigator)

    1 Mar 202130 Nov 2025

    Project: Research

Previous 1...5 6 7 8 9 10 11 12 ...35 Next