Zustimmungen im Einzelfall für Grout-Verbindungen in Tragstrukturen für die Offshore-Windenergie

Publikation: Beitrag in nicht-wissenschaftlicher/populärwissenschaftlicher Zeitschrift/ZeitungBeitrag in Publikumszeitung/-zeitschriftTransfer

Autoren

  • Ludger Lohaus
  • Peter Schaumann
  • Stephan Lochte-Holtgreven
  • Anne Bechtel
  • Robert Griese
  • Nick Lindschulte

Externe Organisationen

  • LPI Ingenieurgesellschaft mbH
Forschungs-netzwerk anzeigen

Details

Titel in ÜbersetzungApprovals for grouted joints in offshore substructures
OriginalspracheDeutsch
Seiten402-409
Seitenumfang8
Band90
Ausgabenummer7
FachzeitschriftBAUTECHNIK
PublikationsstatusVeröffentlicht - Juli 2013

Abstract

By 2030 nearly 30 % of electricity shall be gained by renewable energy. The offshore wind energy plays a significant role, so that in the next 15 years nearly 30 gigawatt of electricity shall be installed offshore. Currently, several offshore wind projects are erected in the North and Baltic Sea, but most of the projects are consented and wait for the final 'go'. One 'hot' topic is the question of a reliable connection between the driven piles and the offshore substructures. The grouted joint as a tube-to-tube-connection is typically used for this connection. Missing national offshore guidelines for design and construction of grouted joints and grout materials require site specific approvals in the individual case for the type of construction and the type of material. By this, it shall be assured that design and material comply with German guidelines and that national requirements regarding production, installation and durability are fulfilled. Even if the approval process prolongs the duration until consent, finalized approval processes show an increase in quality of the structural design and reliability of grout materials for offshore structures. In this paper, the strategy of an approval in the individual case is described and recommendations are presented.

Schlagwörter

    approval in the individual case, fatigue, grouted joints, high performance concrete, technical guidelines

ASJC Scopus Sachgebiete

Ziele für nachhaltige Entwicklung

Zitieren

Zustimmungen im Einzelfall für Grout-Verbindungen in Tragstrukturen für die Offshore-Windenergie. / Lohaus, Ludger; Schaumann, Peter; Lochte-Holtgreven, Stephan et al.
in: BAUTECHNIK, Jahrgang 90, Nr. 7, 07.2013, S. 402-409.

Publikation: Beitrag in nicht-wissenschaftlicher/populärwissenschaftlicher Zeitschrift/ZeitungBeitrag in Publikumszeitung/-zeitschriftTransfer

Lohaus, L, Schaumann, P, Lochte-Holtgreven, S, Bechtel, A, Griese, R & Lindschulte, N 2013, 'Zustimmungen im Einzelfall für Grout-Verbindungen in Tragstrukturen für die Offshore-Windenergie' BAUTECHNIK, Jg. 90, Nr. 7, S. 402-409. https://doi.org/10.1002/bate.201300042
Lohaus, L., Schaumann, P., Lochte-Holtgreven, S., Bechtel, A., Griese, R., & Lindschulte, N. (2013). Zustimmungen im Einzelfall für Grout-Verbindungen in Tragstrukturen für die Offshore-Windenergie. BAUTECHNIK, 90(7), 402-409. https://doi.org/10.1002/bate.201300042
Lohaus L, Schaumann P, Lochte-Holtgreven S, Bechtel A, Griese R, Lindschulte N. Zustimmungen im Einzelfall für Grout-Verbindungen in Tragstrukturen für die Offshore-Windenergie. BAUTECHNIK. 2013 Jul;90(7):402-409. Epub 2013 Jul 1. doi: 10.1002/bate.201300042
Lohaus, Ludger ; Schaumann, Peter ; Lochte-Holtgreven, Stephan et al. / Zustimmungen im Einzelfall für Grout-Verbindungen in Tragstrukturen für die Offshore-Windenergie. in: BAUTECHNIK. 2013 ; Jahrgang 90, Nr. 7. S. 402-409.
Download
@misc{ede316020cf74373a7c1f9907e17b29f,
title = "Zustimmungen im Einzelfall f{\"u}r Grout-Verbindungen in Tragstrukturen f{\"u}r die Offshore-Windenergie",
abstract = "By 2030 nearly 30 % of electricity shall be gained by renewable energy. The offshore wind energy plays a significant role, so that in the next 15 years nearly 30 gigawatt of electricity shall be installed offshore. Currently, several offshore wind projects are erected in the North and Baltic Sea, but most of the projects are consented and wait for the final 'go'. One 'hot' topic is the question of a reliable connection between the driven piles and the offshore substructures. The grouted joint as a tube-to-tube-connection is typically used for this connection. Missing national offshore guidelines for design and construction of grouted joints and grout materials require site specific approvals in the individual case for the type of construction and the type of material. By this, it shall be assured that design and material comply with German guidelines and that national requirements regarding production, installation and durability are fulfilled. Even if the approval process prolongs the duration until consent, finalized approval processes show an increase in quality of the structural design and reliability of grout materials for offshore structures. In this paper, the strategy of an approval in the individual case is described and recommendations are presented.",
keywords = "approval in the individual case, fatigue, grouted joints, high performance concrete, technical guidelines",
author = "Ludger Lohaus and Peter Schaumann and Stephan Lochte-Holtgreven and Anne Bechtel and Robert Griese and Nick Lindschulte",
year = "2013",
month = jul,
doi = "10.1002/bate.201300042",
language = "Deutsch",
volume = "90",
pages = "402--409",
journal = "BAUTECHNIK",
issn = "0932-8351",
publisher = "Wiley-Blackwell",

}

Download

TY - GEN

T1 - Zustimmungen im Einzelfall für Grout-Verbindungen in Tragstrukturen für die Offshore-Windenergie

AU - Lohaus, Ludger

AU - Schaumann, Peter

AU - Lochte-Holtgreven, Stephan

AU - Bechtel, Anne

AU - Griese, Robert

AU - Lindschulte, Nick

PY - 2013/7

Y1 - 2013/7

N2 - By 2030 nearly 30 % of electricity shall be gained by renewable energy. The offshore wind energy plays a significant role, so that in the next 15 years nearly 30 gigawatt of electricity shall be installed offshore. Currently, several offshore wind projects are erected in the North and Baltic Sea, but most of the projects are consented and wait for the final 'go'. One 'hot' topic is the question of a reliable connection between the driven piles and the offshore substructures. The grouted joint as a tube-to-tube-connection is typically used for this connection. Missing national offshore guidelines for design and construction of grouted joints and grout materials require site specific approvals in the individual case for the type of construction and the type of material. By this, it shall be assured that design and material comply with German guidelines and that national requirements regarding production, installation and durability are fulfilled. Even if the approval process prolongs the duration until consent, finalized approval processes show an increase in quality of the structural design and reliability of grout materials for offshore structures. In this paper, the strategy of an approval in the individual case is described and recommendations are presented.

AB - By 2030 nearly 30 % of electricity shall be gained by renewable energy. The offshore wind energy plays a significant role, so that in the next 15 years nearly 30 gigawatt of electricity shall be installed offshore. Currently, several offshore wind projects are erected in the North and Baltic Sea, but most of the projects are consented and wait for the final 'go'. One 'hot' topic is the question of a reliable connection between the driven piles and the offshore substructures. The grouted joint as a tube-to-tube-connection is typically used for this connection. Missing national offshore guidelines for design and construction of grouted joints and grout materials require site specific approvals in the individual case for the type of construction and the type of material. By this, it shall be assured that design and material comply with German guidelines and that national requirements regarding production, installation and durability are fulfilled. Even if the approval process prolongs the duration until consent, finalized approval processes show an increase in quality of the structural design and reliability of grout materials for offshore structures. In this paper, the strategy of an approval in the individual case is described and recommendations are presented.

KW - approval in the individual case

KW - fatigue

KW - grouted joints

KW - high performance concrete

KW - technical guidelines

UR - http://www.scopus.com/inward/record.url?scp=84879739561&partnerID=8YFLogxK

U2 - 10.1002/bate.201300042

DO - 10.1002/bate.201300042

M3 - Beitrag in Publikumszeitung/-zeitschrift

AN - SCOPUS:84879739561

VL - 90

SP - 402

EP - 409

JO - BAUTECHNIK

JF - BAUTECHNIK

SN - 0932-8351

ER -