Zielorientierte und kontextbasierte Baukostenabschätzung in der frühen Fabrikplanung

Publikation: Beitrag in FachzeitschriftArtikelForschungPeer-Review

Autoren

  • Cihan Cevirgen
  • Danil Efremov
  • Jonas Kerstgens
  • Leonard Rieke
  • Sebastian Dersch
  • Peter Nyhuis

Externe Organisationen

  • Reichardt-Maas-Assoziierte Architekten GmbH & Co. KG (RMA)
Forschungs-netzwerk anzeigen

Details

Titel in ÜbersetzungGoal-oriented and Context-based Estimation of Construction Cost in Early Factory Planning
OriginalspracheDeutsch
Seiten (von - bis)100-105
Seitenumfang6
FachzeitschriftZWF Zeitschrift fuer Wirtschaftlichen Fabrikbetrieb
Jahrgang118
Ausgabenummer3
Frühes Online-Datum16 März 2023
PublikationsstatusVeröffentlicht - 31 März 2023

Abstract

Complex factory planning projects, such as new construction or expansion planning, usually require extensive capital, which places a heavy burden on the company's financial resources. To properly assess the profitability of a factory planning project, an estimate of construction costs is essential. It is often unclear how the strategic goals as well as context-based conditions (e.g. property or factory requirements) influence the construction costs. The latter is usually a decisive selection criterion. This paper presents a methodical approach that can be used to concretize factory targets by construction measures and to bring them into a common descriptive basis with the factory's needs. The aim is to estimate construction costs for carrying out a preliminary study on the basis of predefined construction standards.

Schlagwörter

    Configuration Model, Contextual Factors of Early Factory Planning, Cost Estimation by Single Value Method, Industrial Building Standard, Preliminary Study, Strategic Factory Goals

ASJC Scopus Sachgebiete

Zitieren

Zielorientierte und kontextbasierte Baukostenabschätzung in der frühen Fabrikplanung. / Cevirgen, Cihan; Efremov, Danil; Kerstgens, Jonas et al.
in: ZWF Zeitschrift fuer Wirtschaftlichen Fabrikbetrieb, Jahrgang 118, Nr. 3, 31.03.2023, S. 100-105.

Publikation: Beitrag in FachzeitschriftArtikelForschungPeer-Review

Cevirgen, C, Efremov, D, Kerstgens, J, Rieke, L, Dersch, S & Nyhuis, P 2023, 'Zielorientierte und kontextbasierte Baukostenabschätzung in der frühen Fabrikplanung', ZWF Zeitschrift fuer Wirtschaftlichen Fabrikbetrieb, Jg. 118, Nr. 3, S. 100-105. https://doi.org/10.1515/zwf-2023-1018
Cevirgen, C., Efremov, D., Kerstgens, J., Rieke, L., Dersch, S., & Nyhuis, P. (2023). Zielorientierte und kontextbasierte Baukostenabschätzung in der frühen Fabrikplanung. ZWF Zeitschrift fuer Wirtschaftlichen Fabrikbetrieb, 118(3), 100-105. https://doi.org/10.1515/zwf-2023-1018
Cevirgen C, Efremov D, Kerstgens J, Rieke L, Dersch S, Nyhuis P. Zielorientierte und kontextbasierte Baukostenabschätzung in der frühen Fabrikplanung. ZWF Zeitschrift fuer Wirtschaftlichen Fabrikbetrieb. 2023 Mär 31;118(3):100-105. Epub 2023 Mär 16. doi: 10.1515/zwf-2023-1018
Cevirgen, Cihan ; Efremov, Danil ; Kerstgens, Jonas et al. / Zielorientierte und kontextbasierte Baukostenabschätzung in der frühen Fabrikplanung. in: ZWF Zeitschrift fuer Wirtschaftlichen Fabrikbetrieb. 2023 ; Jahrgang 118, Nr. 3. S. 100-105.
Download
@article{7acc2daa4e7540499f8d820b6c74787e,
title = "Zielorientierte und kontextbasierte Baukostenabsch{\"a}tzung in der fr{\"u}hen Fabrikplanung",
abstract = "Complex factory planning projects, such as new construction or expansion planning, usually require extensive capital, which places a heavy burden on the company's financial resources. To properly assess the profitability of a factory planning project, an estimate of construction costs is essential. It is often unclear how the strategic goals as well as context-based conditions (e.g. property or factory requirements) influence the construction costs. The latter is usually a decisive selection criterion. This paper presents a methodical approach that can be used to concretize factory targets by construction measures and to bring them into a common descriptive basis with the factory's needs. The aim is to estimate construction costs for carrying out a preliminary study on the basis of predefined construction standards.",
keywords = "Configuration Model, Contextual Factors of Early Factory Planning, Cost Estimation by Single Value Method, Industrial Building Standard, Preliminary Study, Strategic Factory Goals",
author = "Cihan Cevirgen and Danil Efremov and Jonas Kerstgens and Leonard Rieke and Sebastian Dersch and Peter Nyhuis",
year = "2023",
month = mar,
day = "31",
doi = "10.1515/zwf-2023-1018",
language = "Deutsch",
volume = "118",
pages = "100--105",
number = "3",

}

Download

TY - JOUR

T1 - Zielorientierte und kontextbasierte Baukostenabschätzung in der frühen Fabrikplanung

AU - Cevirgen, Cihan

AU - Efremov, Danil

AU - Kerstgens, Jonas

AU - Rieke, Leonard

AU - Dersch, Sebastian

AU - Nyhuis, Peter

PY - 2023/3/31

Y1 - 2023/3/31

N2 - Complex factory planning projects, such as new construction or expansion planning, usually require extensive capital, which places a heavy burden on the company's financial resources. To properly assess the profitability of a factory planning project, an estimate of construction costs is essential. It is often unclear how the strategic goals as well as context-based conditions (e.g. property or factory requirements) influence the construction costs. The latter is usually a decisive selection criterion. This paper presents a methodical approach that can be used to concretize factory targets by construction measures and to bring them into a common descriptive basis with the factory's needs. The aim is to estimate construction costs for carrying out a preliminary study on the basis of predefined construction standards.

AB - Complex factory planning projects, such as new construction or expansion planning, usually require extensive capital, which places a heavy burden on the company's financial resources. To properly assess the profitability of a factory planning project, an estimate of construction costs is essential. It is often unclear how the strategic goals as well as context-based conditions (e.g. property or factory requirements) influence the construction costs. The latter is usually a decisive selection criterion. This paper presents a methodical approach that can be used to concretize factory targets by construction measures and to bring them into a common descriptive basis with the factory's needs. The aim is to estimate construction costs for carrying out a preliminary study on the basis of predefined construction standards.

KW - Configuration Model

KW - Contextual Factors of Early Factory Planning

KW - Cost Estimation by Single Value Method

KW - Industrial Building Standard

KW - Preliminary Study

KW - Strategic Factory Goals

UR - http://www.scopus.com/inward/record.url?scp=85150275519&partnerID=8YFLogxK

U2 - 10.1515/zwf-2023-1018

DO - 10.1515/zwf-2023-1018

M3 - Artikel

AN - SCOPUS:85150275519

VL - 118

SP - 100

EP - 105

JO - ZWF Zeitschrift fuer Wirtschaftlichen Fabrikbetrieb

JF - ZWF Zeitschrift fuer Wirtschaftlichen Fabrikbetrieb

SN - 0947-0085

IS - 3

ER -