Zeitpunkt zur Veränderung von Fertigungsmengen

Publikation: Beitrag in FachzeitschriftArtikelForschungPeer-Review

Autoren

  • Stephan Meers
  • Georg Ulimann
  • Peter Nyhuis

Externe Organisationen

  • Institut für integrierte Produktion Hannover (IPH) gGmbH
Forschungs-netzwerk anzeigen

Details

Titel in ÜbersetzungTime for the change of amounts of productions
OriginalspracheDeutsch
Seiten (von - bis)887-891
Seitenumfang5
FachzeitschriftZWF Zeitschrift fuer Wirtschaftlichen Fabrikbetrieb
Jahrgang107
Ausgabenummer12
PublikationsstatusVeröffentlicht - 1 Dez. 2012

Abstract

Stock levels held up make possible reaching a desired service degree at swaying demands. Short-term changes of the demand behavior can, however, cause missing part situation. In case the production is able to adapt the amount of production to a changed demand situation at short notice, the delivering ability can remain unchanged. At stochastic demands the right time of the change of amounts of production is a central question.

ASJC Scopus Sachgebiete

Zitieren

Zeitpunkt zur Veränderung von Fertigungsmengen. / Meers, Stephan; Ulimann, Georg; Nyhuis, Peter.
in: ZWF Zeitschrift fuer Wirtschaftlichen Fabrikbetrieb, Jahrgang 107, Nr. 12, 01.12.2012, S. 887-891.

Publikation: Beitrag in FachzeitschriftArtikelForschungPeer-Review

Meers, S, Ulimann, G & Nyhuis, P 2012, 'Zeitpunkt zur Veränderung von Fertigungsmengen', ZWF Zeitschrift fuer Wirtschaftlichen Fabrikbetrieb, Jg. 107, Nr. 12, S. 887-891.
Meers, S., Ulimann, G., & Nyhuis, P. (2012). Zeitpunkt zur Veränderung von Fertigungsmengen. ZWF Zeitschrift fuer Wirtschaftlichen Fabrikbetrieb, 107(12), 887-891.
Meers S, Ulimann G, Nyhuis P. Zeitpunkt zur Veränderung von Fertigungsmengen. ZWF Zeitschrift fuer Wirtschaftlichen Fabrikbetrieb. 2012 Dez 1;107(12):887-891.
Meers, Stephan ; Ulimann, Georg ; Nyhuis, Peter. / Zeitpunkt zur Veränderung von Fertigungsmengen. in: ZWF Zeitschrift fuer Wirtschaftlichen Fabrikbetrieb. 2012 ; Jahrgang 107, Nr. 12. S. 887-891.
Download
@article{b6021db615aa43ebb5424f8ddc8b8bb5,
title = "Zeitpunkt zur Ver{\"a}nderung von Fertigungsmengen",
abstract = "Stock levels held up make possible reaching a desired service degree at swaying demands. Short-term changes of the demand behavior can, however, cause missing part situation. In case the production is able to adapt the amount of production to a changed demand situation at short notice, the delivering ability can remain unchanged. At stochastic demands the right time of the change of amounts of production is a central question.",
author = "Stephan Meers and Georg Ulimann and Peter Nyhuis",
year = "2012",
month = dec,
day = "1",
language = "Deutsch",
volume = "107",
pages = "887--891",
number = "12",

}

Download

TY - JOUR

T1 - Zeitpunkt zur Veränderung von Fertigungsmengen

AU - Meers, Stephan

AU - Ulimann, Georg

AU - Nyhuis, Peter

PY - 2012/12/1

Y1 - 2012/12/1

N2 - Stock levels held up make possible reaching a desired service degree at swaying demands. Short-term changes of the demand behavior can, however, cause missing part situation. In case the production is able to adapt the amount of production to a changed demand situation at short notice, the delivering ability can remain unchanged. At stochastic demands the right time of the change of amounts of production is a central question.

AB - Stock levels held up make possible reaching a desired service degree at swaying demands. Short-term changes of the demand behavior can, however, cause missing part situation. In case the production is able to adapt the amount of production to a changed demand situation at short notice, the delivering ability can remain unchanged. At stochastic demands the right time of the change of amounts of production is a central question.

UR - http://www.scopus.com/inward/record.url?scp=84873353464&partnerID=8YFLogxK

M3 - Artikel

AN - SCOPUS:84873353464

VL - 107

SP - 887

EP - 891

JO - ZWF Zeitschrift fuer Wirtschaftlichen Fabrikbetrieb

JF - ZWF Zeitschrift fuer Wirtschaftlichen Fabrikbetrieb

SN - 0947-0085

IS - 12

ER -