Abstract
The target-oriented configuration of production planning and control (PPC) confronts companies with major challenges. While there are already many publications dealing with the effect of specific procedures of PPC tasks on the logistic objectives, there is still a lack of a framework allowing a comprehensive and relatively simple examination of the target conformity of PPC configuration on the level of procedures. Furthermore, such a framework would thereby also enable companies to position their PPC among conflicting production and logistic objectives.This contribution presents the current state of knowledge on target-oriented and holistic PPC configuration and points out why a systematic investigation of the generally valid interdependencies of PPC procedures with each other as well as the impact on the most important objectives is necessary.Further, it is outlined which future research activities are planned and with a demonstrative example illustrated how complex cause-effect relationships within PPC on the level of procedures arise.
ASJC Scopus Sachgebiete
- Betriebswirtschaft, Management und Rechnungswesen (insg.)
- Betriebswirtschaft, Management und Rechnungswesen (sonstige)
- Ingenieurwesen (insg.)
- Wirtschaftsingenieurwesen und Fertigungstechnik
- Ingenieurwesen (insg.)
- Sicherheit, Risiko, Zuverlässigkeit und Qualität
Zitieren
- Standard
- Harvard
- Apa
- Vancouver
- BibTex
- RIS
2020 IEEE International Conference on Industrial Engineering and Engineering Management, IEEM 2020. 2020. S. 103-107 9309885.
Publikation: Beitrag in Buch/Bericht/Sammelwerk/Konferenzband › Aufsatz in Konferenzband › Forschung › Peer-Review
}
TY - GEN
T1 - Why a Systematic Investigation of Production Planning and Control Procedures is Needed for the Target-oriented Configuration of PPC
AU - Mütze, Alexander Carolus Erich
AU - Hillnhagen, Simon
AU - Schäfers, Philipp
AU - Schmidt, Matthias
AU - Nyhuis, Peter
PY - 2020
Y1 - 2020
N2 - The target-oriented configuration of production planning and control (PPC) confronts companies with major challenges. While there are already many publications dealing with the effect of specific procedures of PPC tasks on the logistic objectives, there is still a lack of a framework allowing a comprehensive and relatively simple examination of the target conformity of PPC configuration on the level of procedures. Furthermore, such a framework would thereby also enable companies to position their PPC among conflicting production and logistic objectives.This contribution presents the current state of knowledge on target-oriented and holistic PPC configuration and points out why a systematic investigation of the generally valid interdependencies of PPC procedures with each other as well as the impact on the most important objectives is necessary.Further, it is outlined which future research activities are planned and with a demonstrative example illustrated how complex cause-effect relationships within PPC on the level of procedures arise.
AB - The target-oriented configuration of production planning and control (PPC) confronts companies with major challenges. While there are already many publications dealing with the effect of specific procedures of PPC tasks on the logistic objectives, there is still a lack of a framework allowing a comprehensive and relatively simple examination of the target conformity of PPC configuration on the level of procedures. Furthermore, such a framework would thereby also enable companies to position their PPC among conflicting production and logistic objectives.This contribution presents the current state of knowledge on target-oriented and holistic PPC configuration and points out why a systematic investigation of the generally valid interdependencies of PPC procedures with each other as well as the impact on the most important objectives is necessary.Further, it is outlined which future research activities are planned and with a demonstrative example illustrated how complex cause-effect relationships within PPC on the level of procedures arise.
KW - Framework
KW - Logistic Objectives
KW - PPC Configuration
KW - PPC Procedures
KW - Production Planning and Control
UR - http://www.scopus.com/inward/record.url?scp=85099758398&partnerID=8YFLogxK
U2 - 10.1109/ieem45057.2020.9309885
DO - 10.1109/ieem45057.2020.9309885
M3 - Conference contribution
SN - 9781538672204
SP - 103
EP - 107
BT - 2020 IEEE International Conference on Industrial Engineering and Engineering Management, IEEM 2020
ER -