Tragwerksplanung beim Rückbau von Spannbetonbrücken

Publikation: Beitrag in FachzeitschriftArtikelForschungPeer-Review

Autoren

  • Gregor Schacht
  • L. Müller
  • S. Kromminga
  • L. Krontal
  • Steffen Marx

Organisationseinheiten

Forschungs-netzwerk anzeigen

Details

Titel in ÜbersetzungStructural engineering in dismantling of concrete bridges
OriginalspracheDeutsch
Seiten (von - bis)6-15
Seitenumfang10
FachzeitschriftBautechnik
Jahrgang95
Ausgabenummer1
PublikationsstatusVeröffentlicht - 21 Nov. 2017

Abstract

Structural engineering in dismantling of concrete bridges. The deconstruction of viaducts in constricted valleys or in immediate vicinity of superstructures under traffic requires new engineer concept for the dismantling. Analog to new bridges the structural stability has to be proven for all states of deconstruction. This results in new challenges for civil engineers with innovative approaches and combined proofs with numerical and experimental investigations.

Schlagwörter

    Bridge engineering, Reinforced concrete construction, dismantling, execution of construction works, movable scaffolding system, partial safety factor, pre-stressed concrete bridges, subsequent re-anchorage

ASJC Scopus Sachgebiete

Zitieren

Tragwerksplanung beim Rückbau von Spannbetonbrücken. / Schacht, Gregor; Müller, L.; Kromminga, S. et al.
in: Bautechnik, Jahrgang 95, Nr. 1, 21.11.2017, S. 6-15.

Publikation: Beitrag in FachzeitschriftArtikelForschungPeer-Review

Schacht, G, Müller, L, Kromminga, S, Krontal, L & Marx, S 2017, 'Tragwerksplanung beim Rückbau von Spannbetonbrücken', Bautechnik, Jg. 95, Nr. 1, S. 6-15. https://doi.org/10.1002/bate.201700093
Schacht, G., Müller, L., Kromminga, S., Krontal, L., & Marx, S. (2017). Tragwerksplanung beim Rückbau von Spannbetonbrücken. Bautechnik, 95(1), 6-15. https://doi.org/10.1002/bate.201700093
Schacht G, Müller L, Kromminga S, Krontal L, Marx S. Tragwerksplanung beim Rückbau von Spannbetonbrücken. Bautechnik. 2017 Nov 21;95(1):6-15. doi: 10.1002/bate.201700093
Schacht, Gregor ; Müller, L. ; Kromminga, S. et al. / Tragwerksplanung beim Rückbau von Spannbetonbrücken. in: Bautechnik. 2017 ; Jahrgang 95, Nr. 1. S. 6-15.
Download
@article{1b71faf5c6f84824981d862fd0d12e36,
title = "Tragwerksplanung beim R{\"u}ckbau von Spannbetonbr{\"u}cken",
abstract = "Structural engineering in dismantling of concrete bridges. The deconstruction of viaducts in constricted valleys or in immediate vicinity of superstructures under traffic requires new engineer concept for the dismantling. Analog to new bridges the structural stability has to be proven for all states of deconstruction. This results in new challenges for civil engineers with innovative approaches and combined proofs with numerical and experimental investigations.",
keywords = "Bridge engineering,, Reinforced concrete construction, dismantling, execution of construction works, movable scaffolding system, partial safety factor, pre-stressed concrete bridges, subsequent re-anchorage",
author = "Gregor Schacht and L. M{\"u}ller and S. Kromminga and L. Krontal and Steffen Marx",
note = "Publisher Copyright: Copyright {\textcopyright} 2018 Ernst & Sohn Verlag f{\"u}r Architektur und technische Wissenschaften GmbH & Co. KG, Berlin.",
year = "2017",
month = nov,
day = "21",
doi = "10.1002/bate.201700093",
language = "Deutsch",
volume = "95",
pages = "6--15",
journal = "Bautechnik",
issn = "0932-8351",
publisher = "Wiley-Blackwell",
number = "1",

}

Download

TY - JOUR

T1 - Tragwerksplanung beim Rückbau von Spannbetonbrücken

AU - Schacht, Gregor

AU - Müller, L.

AU - Kromminga, S.

AU - Krontal, L.

AU - Marx, Steffen

N1 - Publisher Copyright: Copyright © 2018 Ernst & Sohn Verlag für Architektur und technische Wissenschaften GmbH & Co. KG, Berlin.

PY - 2017/11/21

Y1 - 2017/11/21

N2 - Structural engineering in dismantling of concrete bridges. The deconstruction of viaducts in constricted valleys or in immediate vicinity of superstructures under traffic requires new engineer concept for the dismantling. Analog to new bridges the structural stability has to be proven for all states of deconstruction. This results in new challenges for civil engineers with innovative approaches and combined proofs with numerical and experimental investigations.

AB - Structural engineering in dismantling of concrete bridges. The deconstruction of viaducts in constricted valleys or in immediate vicinity of superstructures under traffic requires new engineer concept for the dismantling. Analog to new bridges the structural stability has to be proven for all states of deconstruction. This results in new challenges for civil engineers with innovative approaches and combined proofs with numerical and experimental investigations.

KW - Bridge engineering,

KW - Reinforced concrete construction

KW - dismantling

KW - execution of construction works

KW - movable scaffolding system

KW - partial safety factor

KW - pre-stressed concrete bridges

KW - subsequent re-anchorage

UR - http://www.scopus.com/inward/record.url?scp=85038113646&partnerID=8YFLogxK

U2 - 10.1002/bate.201700093

DO - 10.1002/bate.201700093

M3 - Artikel

VL - 95

SP - 6

EP - 15

JO - Bautechnik

JF - Bautechnik

SN - 0932-8351

IS - 1

ER -