Details
Originalsprache | Englisch |
---|---|
Titel des Sammelwerks | IEE Conference Publication |
Seiten | 5.1.S10-5.5.S10 |
Auflage | 467 |
Publikationsstatus | Veröffentlicht - 1999 |
Veranstaltung | 1999 11th International Symposium on 'High Voltage Engineering' (ish99) - London, UK Dauer: 23 Aug. 1999 → 27 Aug. 1999 |
Publikationsreihe
Name | IEE Conference Publication |
---|---|
Nummer | 467 |
Band | 5 |
ISSN (Print) | 0537-9989 |
Abstract
The behaviour of the electrical insulating is the main parameter of the maintenance and life time estimation. The diagnostic is based on the knowledge of the insulating material, the measuring technique, the apparatus and the system and asset management. Tests have a defined purpose under given requirements with a clear decision and may be used as reference for the later diagnostic. Monitoring is the recording of the relevant parameter under service conditions with requirements given by the character of the recorded signal. Diagnostic is the evaluation of the signals, continuously recorded by a monitoring system, based on the knowledge of the reference value and the influence of the recorded parameters on the electrical insulating material. The weighting and judging of the parameters with mathematical algorithms allow to create a self-learning system which can be used for maintenance and life time estimation.
ASJC Scopus Sachgebiete
- Ingenieurwesen (insg.)
- Elektrotechnik und Elektronik
Zitieren
- Standard
- Harvard
- Apa
- Vancouver
- BibTex
- RIS
IEE Conference Publication. 467. Aufl. 1999. S. 5.1.S10-5.5.S10 (IEE Conference Publication; Band 5, Nr. 467).
Publikation: Beitrag in Buch/Bericht/Sammelwerk/Konferenzband › Aufsatz in Konferenzband › Forschung › Peer-Review
}
TY - GEN
T1 - Testing and monitoring as basis of the dielectric diagnostic
AU - Gockenbach, Ernst
N1 - Copyright: Copyright 2007 Elsevier B.V., All rights reserved.
PY - 1999
Y1 - 1999
N2 - The behaviour of the electrical insulating is the main parameter of the maintenance and life time estimation. The diagnostic is based on the knowledge of the insulating material, the measuring technique, the apparatus and the system and asset management. Tests have a defined purpose under given requirements with a clear decision and may be used as reference for the later diagnostic. Monitoring is the recording of the relevant parameter under service conditions with requirements given by the character of the recorded signal. Diagnostic is the evaluation of the signals, continuously recorded by a monitoring system, based on the knowledge of the reference value and the influence of the recorded parameters on the electrical insulating material. The weighting and judging of the parameters with mathematical algorithms allow to create a self-learning system which can be used for maintenance and life time estimation.
AB - The behaviour of the electrical insulating is the main parameter of the maintenance and life time estimation. The diagnostic is based on the knowledge of the insulating material, the measuring technique, the apparatus and the system and asset management. Tests have a defined purpose under given requirements with a clear decision and may be used as reference for the later diagnostic. Monitoring is the recording of the relevant parameter under service conditions with requirements given by the character of the recorded signal. Diagnostic is the evaluation of the signals, continuously recorded by a monitoring system, based on the knowledge of the reference value and the influence of the recorded parameters on the electrical insulating material. The weighting and judging of the parameters with mathematical algorithms allow to create a self-learning system which can be used for maintenance and life time estimation.
UR - http://www.scopus.com/inward/record.url?scp=0033349710&partnerID=8YFLogxK
M3 - Conference contribution
AN - SCOPUS:0033349710
SN - 0852967195
T3 - IEE Conference Publication
SP - 5.1.S10-5.5.S10
BT - IEE Conference Publication
T2 - 1999 11th International Symposium on 'High Voltage Engineering' (ish99)
Y2 - 23 August 1999 through 27 August 1999
ER -