Stand der Umsetzung der TrinkwV im Hinblick auf den Parameter Blei

Publikation: Beitrag in FachzeitschriftArtikelForschungPeer-Review

Autoren

  • Stephan Köster
  • Sonja Doktor

Externe Organisationen

  • Rheinisch-Westfälische Technische Hochschule Aachen (RWTH)
  • Bilfinger Berger Nigeria GmbH
Forschungs-netzwerk anzeigen

Details

Titel in ÜbersetzungStatus of the implementation of the drinking water ordinance with regard to the parameter lead
OriginalspracheDeutsch
Seiten (von - bis)176-181
Seitenumfang6
FachzeitschriftGWF, Wasser - Abwasser
Jahrgang150
Ausgabenummer2-3
PublikationsstatusVeröffentlicht - 1 Feb. 2009
Extern publiziertJa

Abstract

The European Drinking Water Directive foresees that a limit value for lead of 10 μg/L must not be exceeded at each household tap by 2013. It is generally accepted that the replacement of leaden household plumbing is the essential prerequisite to fall reliably below this threshold. However, currently it seems to be extremely improbable that the lead threshold will actually be met nation widely in Germany by 2013. Because to apparently lacking legal pressure, high replacement costs and discomfort as well as an evident absence of an official steering and monitoring further action have to be taken.

ASJC Scopus Sachgebiete

Zitieren

Stand der Umsetzung der TrinkwV im Hinblick auf den Parameter Blei. / Köster, Stephan; Doktor, Sonja.
in: GWF, Wasser - Abwasser, Jahrgang 150, Nr. 2-3, 01.02.2009, S. 176-181.

Publikation: Beitrag in FachzeitschriftArtikelForschungPeer-Review

Köster, S & Doktor, S 2009, 'Stand der Umsetzung der TrinkwV im Hinblick auf den Parameter Blei', GWF, Wasser - Abwasser, Jg. 150, Nr. 2-3, S. 176-181.
Köster, S., & Doktor, S. (2009). Stand der Umsetzung der TrinkwV im Hinblick auf den Parameter Blei. GWF, Wasser - Abwasser, 150(2-3), 176-181.
Köster S, Doktor S. Stand der Umsetzung der TrinkwV im Hinblick auf den Parameter Blei. GWF, Wasser - Abwasser. 2009 Feb 1;150(2-3):176-181.
Köster, Stephan ; Doktor, Sonja. / Stand der Umsetzung der TrinkwV im Hinblick auf den Parameter Blei. in: GWF, Wasser - Abwasser. 2009 ; Jahrgang 150, Nr. 2-3. S. 176-181.
Download
@article{6512f2d0baac48c6b98f96a08d927d48,
title = "Stand der Umsetzung der TrinkwV im Hinblick auf den Parameter Blei",
abstract = "The European Drinking Water Directive foresees that a limit value for lead of 10 μg/L must not be exceeded at each household tap by 2013. It is generally accepted that the replacement of leaden household plumbing is the essential prerequisite to fall reliably below this threshold. However, currently it seems to be extremely improbable that the lead threshold will actually be met nation widely in Germany by 2013. Because to apparently lacking legal pressure, high replacement costs and discomfort as well as an evident absence of an official steering and monitoring further action have to be taken.",
author = "Stephan K{\"o}ster and Sonja Doktor",
year = "2009",
month = feb,
day = "1",
language = "Deutsch",
volume = "150",
pages = "176--181",
number = "2-3",

}

Download

TY - JOUR

T1 - Stand der Umsetzung der TrinkwV im Hinblick auf den Parameter Blei

AU - Köster, Stephan

AU - Doktor, Sonja

PY - 2009/2/1

Y1 - 2009/2/1

N2 - The European Drinking Water Directive foresees that a limit value for lead of 10 μg/L must not be exceeded at each household tap by 2013. It is generally accepted that the replacement of leaden household plumbing is the essential prerequisite to fall reliably below this threshold. However, currently it seems to be extremely improbable that the lead threshold will actually be met nation widely in Germany by 2013. Because to apparently lacking legal pressure, high replacement costs and discomfort as well as an evident absence of an official steering and monitoring further action have to be taken.

AB - The European Drinking Water Directive foresees that a limit value for lead of 10 μg/L must not be exceeded at each household tap by 2013. It is generally accepted that the replacement of leaden household plumbing is the essential prerequisite to fall reliably below this threshold. However, currently it seems to be extremely improbable that the lead threshold will actually be met nation widely in Germany by 2013. Because to apparently lacking legal pressure, high replacement costs and discomfort as well as an evident absence of an official steering and monitoring further action have to be taken.

UR - http://www.scopus.com/inward/record.url?scp=68049127536&partnerID=8YFLogxK

M3 - Artikel

AN - SCOPUS:68049127536

VL - 150

SP - 176

EP - 181

JO - GWF, Wasser - Abwasser

JF - GWF, Wasser - Abwasser

SN - 0016-3651

IS - 2-3

ER -