Details
Originalsprache | Englisch |
---|---|
Titel des Sammelwerks | Proceedings of EUCOMES 2008 |
Untertitel | The 2nd European Conference on Mechanism Science |
Seiten | 531-539 |
Seitenumfang | 9 |
Publikationsstatus | Veröffentlicht - 1 Dez. 2009 |
Extern publiziert | Ja |
Veranstaltung | 2nd European Conference on Mechanism Science, EUCOMES 2008 - Cassino, Italien Dauer: 17 Sept. 2008 → 20 Sept. 2008 |
Publikationsreihe
Name | Proceedings of EUCOMES 2008 - The 2nd European Conference on Mechanism Science |
---|
Abstract
This paper presents the scheduling and verification of automated micro assembly processes for which assembly accuracies of a few micrometers are necessary. To reach these accuracies, a relative positioning strategy was used. Possible solutions for the scheduling and verification of two micro assembly processes carried out by a size-adapted assembly system are introduced. These processes reached a positioning uncertainty on the range of 0.5. . .1 μm and part dependent assembly uncertainties of 24 μm and 45 μm.
ASJC Scopus Sachgebiete
- Ingenieurwesen (insg.)
- Werkstoffmechanik
Zitieren
- Standard
- Harvard
- Apa
- Vancouver
- BibTex
- RIS
Proceedings of EUCOMES 2008: The 2nd European Conference on Mechanism Science. 2009. S. 531-539 (Proceedings of EUCOMES 2008 - The 2nd European Conference on Mechanism Science).
Publikation: Beitrag in Buch/Bericht/Sammelwerk/Konferenzband › Aufsatz in Konferenzband › Forschung › Peer-Review
}
TY - GEN
T1 - Scheduling and verification of micro assembly processes
AU - Schöttler, Kerstin
AU - Burisch, Arne
AU - Raatz, Annika
AU - Hesselbach, Jürgen
PY - 2009/12/1
Y1 - 2009/12/1
N2 - This paper presents the scheduling and verification of automated micro assembly processes for which assembly accuracies of a few micrometers are necessary. To reach these accuracies, a relative positioning strategy was used. Possible solutions for the scheduling and verification of two micro assembly processes carried out by a size-adapted assembly system are introduced. These processes reached a positioning uncertainty on the range of 0.5. . .1 μm and part dependent assembly uncertainties of 24 μm and 45 μm.
AB - This paper presents the scheduling and verification of automated micro assembly processes for which assembly accuracies of a few micrometers are necessary. To reach these accuracies, a relative positioning strategy was used. Possible solutions for the scheduling and verification of two micro assembly processes carried out by a size-adapted assembly system are introduced. These processes reached a positioning uncertainty on the range of 0.5. . .1 μm and part dependent assembly uncertainties of 24 μm and 45 μm.
KW - Micro assembly
KW - Relative positioning processes
KW - Size-adapted assembly systems
UR - http://www.scopus.com/inward/record.url?scp=84897713737&partnerID=8YFLogxK
U2 - 10.1007/978-1-4020-8915-2_64
DO - 10.1007/978-1-4020-8915-2_64
M3 - Conference contribution
AN - SCOPUS:84897713737
SN - 9781402089145
T3 - Proceedings of EUCOMES 2008 - The 2nd European Conference on Mechanism Science
SP - 531
EP - 539
BT - Proceedings of EUCOMES 2008
T2 - 2nd European Conference on Mechanism Science, EUCOMES 2008
Y2 - 17 September 2008 through 20 September 2008
ER -