Risk management of Long Term Infrastructure Projects "PPP-BOT projects" by using Uncertainty, Probabilistic and Stochastic Methods and Models

Publikation: Beitrag in Buch/Bericht/Sammelwerk/KonferenzbandAufsatz in KonferenzbandForschungPeer-Review

Autoren

Externe Organisationen

  • National University of Singapore
Forschungs-netzwerk anzeigen

Details

OriginalspracheEnglisch
Titel des SammelwerksVulnerability, Uncertainty, and Risk
UntertitelAnalysis, Modeling, and Management - Proceedings of the ICVRAM 2011 and ISUMA 2011 Conferences
Seiten360-367
Seitenumfang8
PublikationsstatusVeröffentlicht - Apr. 2011
Extern publiziertJa
VeranstaltungInternational Conference on Vulnerability and Risk Analysis and Management, ICVRAM 2011 and the International Symposium on Uncertainty Modeling and Analysis, ISUMA 2011 - Hyattsville, MD, USA / Vereinigte Staaten
Dauer: 11 Apr. 201113 Apr. 2011

Publikationsreihe

NameVulnerability, Uncertainty, and Risk: Analysis, Modeling, and Management - Proceedings of the ICVRAM 2011 and ISUMA 2011 Conferences

Abstract

Risk Management is one of the vital factors for success in long term projects. According to some researchers which consider the risks in long term and large structures projects, risk management is the order of the day and one of the critical success factors (CSFs) of PPP-BOT projects. The concept of risk in these projects, where the risks are generally high, involves contingency and uncertainty. So it is essential to employ uncertainty, probabilistic and stochastic methods and to use related models to manage risks in these projects. In this paper some Probabilistic and Stochastic methods, tools and software are used in real cases to show their role and benefits in the life cycle risk management of Long Term Infrastructure Projects; namely PPP-BOT projects and these have been compared with current methods. Finally a framework for these methods has been proposed to examine dependability modeling under uncertainty by using proposed global dynamic environment model.

ASJC Scopus Sachgebiete

Zitieren

Risk management of Long Term Infrastructure Projects "PPP-BOT projects" by using Uncertainty, Probabilistic and Stochastic Methods and Models. / Attarzadeh, Meghdad; Chua, David Kim Huat; Beer, Michael.
Vulnerability, Uncertainty, and Risk: Analysis, Modeling, and Management - Proceedings of the ICVRAM 2011 and ISUMA 2011 Conferences. 2011. S. 360-367 (Vulnerability, Uncertainty, and Risk: Analysis, Modeling, and Management - Proceedings of the ICVRAM 2011 and ISUMA 2011 Conferences).

Publikation: Beitrag in Buch/Bericht/Sammelwerk/KonferenzbandAufsatz in KonferenzbandForschungPeer-Review

Attarzadeh, M, Chua, DKH & Beer, M 2011, Risk management of Long Term Infrastructure Projects "PPP-BOT projects" by using Uncertainty, Probabilistic and Stochastic Methods and Models. in Vulnerability, Uncertainty, and Risk: Analysis, Modeling, and Management - Proceedings of the ICVRAM 2011 and ISUMA 2011 Conferences. Vulnerability, Uncertainty, and Risk: Analysis, Modeling, and Management - Proceedings of the ICVRAM 2011 and ISUMA 2011 Conferences, S. 360-367, International Conference on Vulnerability and Risk Analysis and Management, ICVRAM 2011 and the International Symposium on Uncertainty Modeling and Analysis, ISUMA 2011, Hyattsville, MD, USA / Vereinigte Staaten, 11 Apr. 2011. https://doi.org/10.1061/41170(400)44
Attarzadeh, M., Chua, D. K. H., & Beer, M. (2011). Risk management of Long Term Infrastructure Projects "PPP-BOT projects" by using Uncertainty, Probabilistic and Stochastic Methods and Models. In Vulnerability, Uncertainty, and Risk: Analysis, Modeling, and Management - Proceedings of the ICVRAM 2011 and ISUMA 2011 Conferences (S. 360-367). (Vulnerability, Uncertainty, and Risk: Analysis, Modeling, and Management - Proceedings of the ICVRAM 2011 and ISUMA 2011 Conferences). https://doi.org/10.1061/41170(400)44
Attarzadeh M, Chua DKH, Beer M. Risk management of Long Term Infrastructure Projects "PPP-BOT projects" by using Uncertainty, Probabilistic and Stochastic Methods and Models. in Vulnerability, Uncertainty, and Risk: Analysis, Modeling, and Management - Proceedings of the ICVRAM 2011 and ISUMA 2011 Conferences. 2011. S. 360-367. (Vulnerability, Uncertainty, and Risk: Analysis, Modeling, and Management - Proceedings of the ICVRAM 2011 and ISUMA 2011 Conferences). doi: 10.1061/41170(400)44
Attarzadeh, Meghdad ; Chua, David Kim Huat ; Beer, Michael. / Risk management of Long Term Infrastructure Projects "PPP-BOT projects" by using Uncertainty, Probabilistic and Stochastic Methods and Models. Vulnerability, Uncertainty, and Risk: Analysis, Modeling, and Management - Proceedings of the ICVRAM 2011 and ISUMA 2011 Conferences. 2011. S. 360-367 (Vulnerability, Uncertainty, and Risk: Analysis, Modeling, and Management - Proceedings of the ICVRAM 2011 and ISUMA 2011 Conferences).
Download
@inproceedings{b1d3668438694f44b16c03a0b5c8eb89,
title = "Risk management of Long Term Infrastructure Projects {"}PPP-BOT projects{"} by using Uncertainty, Probabilistic and Stochastic Methods and Models",
abstract = "Risk Management is one of the vital factors for success in long term projects. According to some researchers which consider the risks in long term and large structures projects, risk management is the order of the day and one of the critical success factors (CSFs) of PPP-BOT projects. The concept of risk in these projects, where the risks are generally high, involves contingency and uncertainty. So it is essential to employ uncertainty, probabilistic and stochastic methods and to use related models to manage risks in these projects. In this paper some Probabilistic and Stochastic methods, tools and software are used in real cases to show their role and benefits in the life cycle risk management of Long Term Infrastructure Projects; namely PPP-BOT projects and these have been compared with current methods. Finally a framework for these methods has been proposed to examine dependability modeling under uncertainty by using proposed global dynamic environment model.",
keywords = "Construction project simulation, Dependability modeling under uncertainty, Fuzzy set, Monte carlo simulation, Ppp, Probabilistic methods, Risk management",
author = "Meghdad Attarzadeh and Chua, {David Kim Huat} and Michael Beer",
year = "2011",
month = apr,
doi = "10.1061/41170(400)44",
language = "English",
isbn = "9780784411704",
series = "Vulnerability, Uncertainty, and Risk: Analysis, Modeling, and Management - Proceedings of the ICVRAM 2011 and ISUMA 2011 Conferences",
pages = "360--367",
booktitle = "Vulnerability, Uncertainty, and Risk",
note = "International Conference on Vulnerability and Risk Analysis and Management, ICVRAM 2011 and the International Symposium on Uncertainty Modeling and Analysis, ISUMA 2011 ; Conference date: 11-04-2011 Through 13-04-2011",

}

Download

TY - GEN

T1 - Risk management of Long Term Infrastructure Projects "PPP-BOT projects" by using Uncertainty, Probabilistic and Stochastic Methods and Models

AU - Attarzadeh, Meghdad

AU - Chua, David Kim Huat

AU - Beer, Michael

PY - 2011/4

Y1 - 2011/4

N2 - Risk Management is one of the vital factors for success in long term projects. According to some researchers which consider the risks in long term and large structures projects, risk management is the order of the day and one of the critical success factors (CSFs) of PPP-BOT projects. The concept of risk in these projects, where the risks are generally high, involves contingency and uncertainty. So it is essential to employ uncertainty, probabilistic and stochastic methods and to use related models to manage risks in these projects. In this paper some Probabilistic and Stochastic methods, tools and software are used in real cases to show their role and benefits in the life cycle risk management of Long Term Infrastructure Projects; namely PPP-BOT projects and these have been compared with current methods. Finally a framework for these methods has been proposed to examine dependability modeling under uncertainty by using proposed global dynamic environment model.

AB - Risk Management is one of the vital factors for success in long term projects. According to some researchers which consider the risks in long term and large structures projects, risk management is the order of the day and one of the critical success factors (CSFs) of PPP-BOT projects. The concept of risk in these projects, where the risks are generally high, involves contingency and uncertainty. So it is essential to employ uncertainty, probabilistic and stochastic methods and to use related models to manage risks in these projects. In this paper some Probabilistic and Stochastic methods, tools and software are used in real cases to show their role and benefits in the life cycle risk management of Long Term Infrastructure Projects; namely PPP-BOT projects and these have been compared with current methods. Finally a framework for these methods has been proposed to examine dependability modeling under uncertainty by using proposed global dynamic environment model.

KW - Construction project simulation

KW - Dependability modeling under uncertainty

KW - Fuzzy set

KW - Monte carlo simulation

KW - Ppp

KW - Probabilistic methods

KW - Risk management

UR - http://www.scopus.com/inward/record.url?scp=79958077831&partnerID=8YFLogxK

U2 - 10.1061/41170(400)44

DO - 10.1061/41170(400)44

M3 - Conference contribution

AN - SCOPUS:79958077831

SN - 9780784411704

T3 - Vulnerability, Uncertainty, and Risk: Analysis, Modeling, and Management - Proceedings of the ICVRAM 2011 and ISUMA 2011 Conferences

SP - 360

EP - 367

BT - Vulnerability, Uncertainty, and Risk

T2 - International Conference on Vulnerability and Risk Analysis and Management, ICVRAM 2011 and the International Symposium on Uncertainty Modeling and Analysis, ISUMA 2011

Y2 - 11 April 2011 through 13 April 2011

ER -

Von denselben Autoren