Details
Titel in Übersetzung | Productivity versus schedule compliance - Logistics-oriented order sequencing for multi-stage production processes |
---|---|
Originalsprache | Deutsch |
Seiten (von - bis) | 206 - 210 |
Seitenumfang | 5 |
Fachzeitschrift | wt Werkstattstechnik online |
Jahrgang | 109 |
Ausgabenummer | 4 |
Publikationsstatus | Veröffentlicht - 2019 |
Abstract
The logistical performance and economic efficiency of a production system are influenced by order sequencing. Mathematical models to describe the effects of different sequencing rules on logistic target variables of individual workstations may be used to derive sequencing strategies for multi-stage productions. The strategy is defined by conscious positioning in the conflicting fields of productivity and schedule compliance.
ASJC Scopus Sachgebiete
- Ingenieurwesen (insg.)
- Steuerungs- und Systemtechnik
- Ingenieurwesen (insg.)
- Fahrzeugbau
Zitieren
- Standard
- Harvard
- Apa
- Vancouver
- BibTex
- RIS
in: wt Werkstattstechnik online, Jahrgang 109, Nr. 4, 2019, S. 206 - 210 .
Publikation: Beitrag in Fachzeitschrift › Artikel › Forschung
}
TY - JOUR
T1 - Produktivität versus Termintreue
T2 - Logistikorientierte Auftragsreihenfolgebildung für mehrstufige Produktionsprozesse
AU - Seitz, Melissa
AU - Mayer, Jonas
AU - Mütze, Alexander
AU - Nyhuis, Peter
PY - 2019
Y1 - 2019
N2 - The logistical performance and economic efficiency of a production system are influenced by order sequencing. Mathematical models to describe the effects of different sequencing rules on logistic target variables of individual workstations may be used to derive sequencing strategies for multi-stage productions. The strategy is defined by conscious positioning in the conflicting fields of productivity and schedule compliance.
AB - The logistical performance and economic efficiency of a production system are influenced by order sequencing. Mathematical models to describe the effects of different sequencing rules on logistic target variables of individual workstations may be used to derive sequencing strategies for multi-stage productions. The strategy is defined by conscious positioning in the conflicting fields of productivity and schedule compliance.
UR - http://www.scopus.com/inward/record.url?scp=85078592837&partnerID=8YFLogxK
U2 - 0.37544/1436-4980-2019-04-4
DO - 0.37544/1436-4980-2019-04-4
M3 - Artikel
VL - 109
SP - 206
EP - 210
JO - wt Werkstattstechnik online
JF - wt Werkstattstechnik online
IS - 4
ER -