Procedure Model For Dimensioning And Investment Cost Calculation In An Early Factory Planning Phase

Publikation: Beitrag in Buch/Bericht/Sammelwerk/KonferenzbandAufsatz in KonferenzbandForschungPeer-Review

Autoren

  • Leonard Rieke
  • Cihan Cevirgen
Forschungs-netzwerk anzeigen

Details

OriginalspracheEnglisch
Titel des Sammelwerks3rd Conference on Production Systems and Logistics
Seiten308-318
Seitenumfang10
PublikationsstatusVeröffentlicht - 1 Juli 2022

Publikationsreihe

NameProceedings of the Conference on Production Systems and Logistics

Abstract

Companies and their factories face constant change in today's world. Cost-intensive factory planning projects are being carried out in shorter intervals due to the increasing dynamism of the production environment. The related investments have a substantial impact on the liquidity of companies. Shorter production life cycles and changing consumer behaviour also require an adapted and more sustainable factory planning and cost estimation. However, especially in an early planning phase, available data and information are often uncertain and inaccurate. This effects in particular the outcome of the central dimensioning variables (operating resources, employees and area) for the planned factories. Incorrect dimensioning of these variables and thus of the associated costs can lead to substantial misinvestments. A holistic approach to obtain a reliable cost estimation of the factory project at an early stage is not yet available. This article therefore presents the development of a comprehensive procedure model for dimensioning and investment cost calculation in an early factory planning phase. For this purpose, relevant information and planning tasks with regard to dimensioning and cost estimation have to be identified first. Determined output values of the subsequent resource dimensioning represent the input values for the cost calculation. With the identification of surcharge factors, cost rates and calculation methods, the dimensioning variables, in particular the production area as the basis for the planned factory, can be estimated in terms of costs at an early stage.

ASJC Scopus Sachgebiete

Ziele für nachhaltige Entwicklung

Zitieren

Procedure Model For Dimensioning And Investment Cost Calculation In An Early Factory Planning Phase. / Rieke, Leonard; Cevirgen, Cihan.
3rd Conference on Production Systems and Logistics. 2022. S. 308-318 (Proceedings of the Conference on Production Systems and Logistics).

Publikation: Beitrag in Buch/Bericht/Sammelwerk/KonferenzbandAufsatz in KonferenzbandForschungPeer-Review

Rieke, L & Cevirgen, C 2022, Procedure Model For Dimensioning And Investment Cost Calculation In An Early Factory Planning Phase. in 3rd Conference on Production Systems and Logistics. Proceedings of the Conference on Production Systems and Logistics, S. 308-318. https://doi.org/10.15488/12156
Rieke, L., & Cevirgen, C. (2022). Procedure Model For Dimensioning And Investment Cost Calculation In An Early Factory Planning Phase. In 3rd Conference on Production Systems and Logistics (S. 308-318). (Proceedings of the Conference on Production Systems and Logistics). https://doi.org/10.15488/12156
Rieke L, Cevirgen C. Procedure Model For Dimensioning And Investment Cost Calculation In An Early Factory Planning Phase. in 3rd Conference on Production Systems and Logistics. 2022. S. 308-318. (Proceedings of the Conference on Production Systems and Logistics). doi: 10.15488/12156
Rieke, Leonard ; Cevirgen, Cihan. / Procedure Model For Dimensioning And Investment Cost Calculation In An Early Factory Planning Phase. 3rd Conference on Production Systems and Logistics. 2022. S. 308-318 (Proceedings of the Conference on Production Systems and Logistics).
Download
@inproceedings{bfd260acad774e18a3aa61d031a8dc08,
title = "Procedure Model For Dimensioning And Investment Cost Calculation In An Early Factory Planning Phase",
abstract = "Companies and their factories face constant change in today's world. Cost-intensive factory planning projects are being carried out in shorter intervals due to the increasing dynamism of the production environment. The related investments have a substantial impact on the liquidity of companies. Shorter production life cycles and changing consumer behaviour also require an adapted and more sustainable factory planning and cost estimation. However, especially in an early planning phase, available data and information are often uncertain and inaccurate. This effects in particular the outcome of the central dimensioning variables (operating resources, employees and area) for the planned factories. Incorrect dimensioning of these variables and thus of the associated costs can lead to substantial misinvestments. A holistic approach to obtain a reliable cost estimation of the factory project at an early stage is not yet available. This article therefore presents the development of a comprehensive procedure model for dimensioning and investment cost calculation in an early factory planning phase. For this purpose, relevant information and planning tasks with regard to dimensioning and cost estimation have to be identified first. Determined output values of the subsequent resource dimensioning represent the input values for the cost calculation. With the identification of surcharge factors, cost rates and calculation methods, the dimensioning variables, in particular the production area as the basis for the planned factory, can be estimated in terms of costs at an early stage.",
keywords = "economic assessment, factory dimensioning, Investment cost calculation, planning tool, procedure model",
author = "Leonard Rieke and Cihan Cevirgen",
year = "2022",
month = jul,
day = "1",
doi = "10.15488/12156",
language = "English",
series = "Proceedings of the Conference on Production Systems and Logistics",
pages = "308--318",
booktitle = "3rd Conference on Production Systems and Logistics",

}

Download

TY - GEN

T1 - Procedure Model For Dimensioning And Investment Cost Calculation In An Early Factory Planning Phase

AU - Rieke, Leonard

AU - Cevirgen, Cihan

PY - 2022/7/1

Y1 - 2022/7/1

N2 - Companies and their factories face constant change in today's world. Cost-intensive factory planning projects are being carried out in shorter intervals due to the increasing dynamism of the production environment. The related investments have a substantial impact on the liquidity of companies. Shorter production life cycles and changing consumer behaviour also require an adapted and more sustainable factory planning and cost estimation. However, especially in an early planning phase, available data and information are often uncertain and inaccurate. This effects in particular the outcome of the central dimensioning variables (operating resources, employees and area) for the planned factories. Incorrect dimensioning of these variables and thus of the associated costs can lead to substantial misinvestments. A holistic approach to obtain a reliable cost estimation of the factory project at an early stage is not yet available. This article therefore presents the development of a comprehensive procedure model for dimensioning and investment cost calculation in an early factory planning phase. For this purpose, relevant information and planning tasks with regard to dimensioning and cost estimation have to be identified first. Determined output values of the subsequent resource dimensioning represent the input values for the cost calculation. With the identification of surcharge factors, cost rates and calculation methods, the dimensioning variables, in particular the production area as the basis for the planned factory, can be estimated in terms of costs at an early stage.

AB - Companies and their factories face constant change in today's world. Cost-intensive factory planning projects are being carried out in shorter intervals due to the increasing dynamism of the production environment. The related investments have a substantial impact on the liquidity of companies. Shorter production life cycles and changing consumer behaviour also require an adapted and more sustainable factory planning and cost estimation. However, especially in an early planning phase, available data and information are often uncertain and inaccurate. This effects in particular the outcome of the central dimensioning variables (operating resources, employees and area) for the planned factories. Incorrect dimensioning of these variables and thus of the associated costs can lead to substantial misinvestments. A holistic approach to obtain a reliable cost estimation of the factory project at an early stage is not yet available. This article therefore presents the development of a comprehensive procedure model for dimensioning and investment cost calculation in an early factory planning phase. For this purpose, relevant information and planning tasks with regard to dimensioning and cost estimation have to be identified first. Determined output values of the subsequent resource dimensioning represent the input values for the cost calculation. With the identification of surcharge factors, cost rates and calculation methods, the dimensioning variables, in particular the production area as the basis for the planned factory, can be estimated in terms of costs at an early stage.

KW - economic assessment

KW - factory dimensioning

KW - Investment cost calculation

KW - planning tool

KW - procedure model

UR - http://www.scopus.com/inward/record.url?scp=85164416514&partnerID=8YFLogxK

U2 - 10.15488/12156

DO - 10.15488/12156

M3 - Conference contribution

T3 - Proceedings of the Conference on Production Systems and Logistics

SP - 308

EP - 318

BT - 3rd Conference on Production Systems and Logistics

ER -