Optimised Congestion Management Using Curative Measures in Combined AC/DC Systems with Flexible AC Transmission Systems

Publikation: Beitrag in FachzeitschriftArtikelForschungPeer-Review

Autoren

Externe Organisationen

  • Fraunhofer-Institut für Energiewirtschaft und Energiesystemtechnik (IEE)
Forschungs-netzwerk anzeigen

Details

OriginalspracheEnglisch
Aufsatznummer2157
FachzeitschriftENERGIES
Jahrgang17
Ausgabenummer9
Frühes Online-Datum30 Apr. 2024
PublikationsstatusVeröffentlicht - Mai 2024

Abstract

Due to the increasing demand for transport of electrical energy, measures for power flow control, congestion management, and higher utilisation of the existing grid play a decisive role in the transformation of the power system. Hence, enormous efforts must be undertaken using measures of congestion management. Modelling and integration of corresponding measures in optimisation tools to support grid and system operation and therewith reduce the resulting efforts become more important. This is especially true because of the high intermittency and decentralisation of renewable generation leading to increased complexity of the power system, higher loading of assets, and a growing need for control over flexible alternating current transmission systems (FACTS) and high-voltage direct current (HVDC) converters. This work therefore describes the implementation of optimised congestion management in an A Mathematical Programming Language (AMPL)-based nonlinear optimisation problem. AMPL is an effective tool to deal with highly complex problems of optimisation and scheduling. Therefore, the modelling of assets and flexibilities for power flow control in AC/DC systems in combination with an innovative grid operation strategy using predefined curative measures for the optimised use of the existing grid is introduced. The nonlinear mathematical optimisation aims at the optimal cost selection of flexibility measures. The application of the optimisation technique in a combined AC/DC system shows the optimal preventive and curative use of measures in operational congestion management. Simulation results prove that, by using predefined curative measures, the volume of cost-intensive preventive measures can significantly be reduced, especially in association with power flow control.

ASJC Scopus Sachgebiete

Ziele für nachhaltige Entwicklung

Zitieren

Optimised Congestion Management Using Curative Measures in Combined AC/DC Systems with Flexible AC Transmission Systems. / Mende, Denis; Hofmann, Lutz.
in: ENERGIES, Jahrgang 17, Nr. 9, 2157, 05.2024.

Publikation: Beitrag in FachzeitschriftArtikelForschungPeer-Review

Download
@article{d7e36706be3c4ff9bd5faffa94dff1b3,
title = "Optimised Congestion Management Using Curative Measures in Combined AC/DC Systems with Flexible AC Transmission Systems",
abstract = "Due to the increasing demand for transport of electrical energy, measures for power flow control, congestion management, and higher utilisation of the existing grid play a decisive role in the transformation of the power system. Hence, enormous efforts must be undertaken using measures of congestion management. Modelling and integration of corresponding measures in optimisation tools to support grid and system operation and therewith reduce the resulting efforts become more important. This is especially true because of the high intermittency and decentralisation of renewable generation leading to increased complexity of the power system, higher loading of assets, and a growing need for control over flexible alternating current transmission systems (FACTS) and high-voltage direct current (HVDC) converters. This work therefore describes the implementation of optimised congestion management in an A Mathematical Programming Language (AMPL)-based nonlinear optimisation problem. AMPL is an effective tool to deal with highly complex problems of optimisation and scheduling. Therefore, the modelling of assets and flexibilities for power flow control in AC/DC systems in combination with an innovative grid operation strategy using predefined curative measures for the optimised use of the existing grid is introduced. The nonlinear mathematical optimisation aims at the optimal cost selection of flexibility measures. The application of the optimisation technique in a combined AC/DC system shows the optimal preventive and curative use of measures in operational congestion management. Simulation results prove that, by using predefined curative measures, the volume of cost-intensive preventive measures can significantly be reduced, especially in association with power flow control.",
keywords = "congestion management, curative measures, flexible AC transmission systems, high-voltage direct current, nonlinear mathematical optimisation, power flow control",
author = "Denis Mende and Lutz Hofmann",
note = "Publisher Copyright: {\textcopyright} 2024 by the authors.",
year = "2024",
month = may,
doi = "10.3390/en17092157",
language = "English",
volume = "17",
journal = "ENERGIES",
issn = "1996-1073",
publisher = "Multidisciplinary Digital Publishing Institute",
number = "9",

}

Download

TY - JOUR

T1 - Optimised Congestion Management Using Curative Measures in Combined AC/DC Systems with Flexible AC Transmission Systems

AU - Mende, Denis

AU - Hofmann, Lutz

N1 - Publisher Copyright: © 2024 by the authors.

PY - 2024/5

Y1 - 2024/5

N2 - Due to the increasing demand for transport of electrical energy, measures for power flow control, congestion management, and higher utilisation of the existing grid play a decisive role in the transformation of the power system. Hence, enormous efforts must be undertaken using measures of congestion management. Modelling and integration of corresponding measures in optimisation tools to support grid and system operation and therewith reduce the resulting efforts become more important. This is especially true because of the high intermittency and decentralisation of renewable generation leading to increased complexity of the power system, higher loading of assets, and a growing need for control over flexible alternating current transmission systems (FACTS) and high-voltage direct current (HVDC) converters. This work therefore describes the implementation of optimised congestion management in an A Mathematical Programming Language (AMPL)-based nonlinear optimisation problem. AMPL is an effective tool to deal with highly complex problems of optimisation and scheduling. Therefore, the modelling of assets and flexibilities for power flow control in AC/DC systems in combination with an innovative grid operation strategy using predefined curative measures for the optimised use of the existing grid is introduced. The nonlinear mathematical optimisation aims at the optimal cost selection of flexibility measures. The application of the optimisation technique in a combined AC/DC system shows the optimal preventive and curative use of measures in operational congestion management. Simulation results prove that, by using predefined curative measures, the volume of cost-intensive preventive measures can significantly be reduced, especially in association with power flow control.

AB - Due to the increasing demand for transport of electrical energy, measures for power flow control, congestion management, and higher utilisation of the existing grid play a decisive role in the transformation of the power system. Hence, enormous efforts must be undertaken using measures of congestion management. Modelling and integration of corresponding measures in optimisation tools to support grid and system operation and therewith reduce the resulting efforts become more important. This is especially true because of the high intermittency and decentralisation of renewable generation leading to increased complexity of the power system, higher loading of assets, and a growing need for control over flexible alternating current transmission systems (FACTS) and high-voltage direct current (HVDC) converters. This work therefore describes the implementation of optimised congestion management in an A Mathematical Programming Language (AMPL)-based nonlinear optimisation problem. AMPL is an effective tool to deal with highly complex problems of optimisation and scheduling. Therefore, the modelling of assets and flexibilities for power flow control in AC/DC systems in combination with an innovative grid operation strategy using predefined curative measures for the optimised use of the existing grid is introduced. The nonlinear mathematical optimisation aims at the optimal cost selection of flexibility measures. The application of the optimisation technique in a combined AC/DC system shows the optimal preventive and curative use of measures in operational congestion management. Simulation results prove that, by using predefined curative measures, the volume of cost-intensive preventive measures can significantly be reduced, especially in association with power flow control.

KW - congestion management

KW - curative measures

KW - flexible AC transmission systems

KW - high-voltage direct current

KW - nonlinear mathematical optimisation

KW - power flow control

UR - http://www.scopus.com/inward/record.url?scp=85192789591&partnerID=8YFLogxK

U2 - 10.3390/en17092157

DO - 10.3390/en17092157

M3 - Article

AN - SCOPUS:85192789591

VL - 17

JO - ENERGIES

JF - ENERGIES

SN - 1996-1073

IS - 9

M1 - 2157

ER -

Von denselben Autoren