Abstract
The expansion of a sugar production plant requires an adaptation of the existing permissions according to immission law. For this reason, the legal support and control of the expansion project are significant factors for its success. This contribution highlights the key legal aspects which have to be considered before and during an application process for issuing an extension permit. The article is divided in five sections: introduction (1), subject and scope of the application (2), background and challenges of the expansion (3), its legal framework (4) as well as conclusions and recommendations (5).
ASJC Scopus Sachgebiete
- Agrar- und Biowissenschaften (insg.)
- Lebensmittelwissenschaften
Zitieren
- Standard
- Harvard
- Apa
- Vancouver
- BibTex
- RIS
in: Zuckerindustrie, Jahrgang 142, Nr. 10, 10.2017, S. 584-588.
Publikation: Beitrag in Fachzeitschrift › Artikel › Forschung › Peer-Review
}
TY - JOUR
T1 - Modification and expansion of a sugar production plant from a legal point of view
T2 - Demonstrated with the example of the Anklam sugar factory in Mecklenburg-Vorpommern
AU - Versteyl, Andrea
AU - Potzl, Johannes
PY - 2017/10
Y1 - 2017/10
N2 - The expansion of a sugar production plant requires an adaptation of the existing permissions according to immission law. For this reason, the legal support and control of the expansion project are significant factors for its success. This contribution highlights the key legal aspects which have to be considered before and during an application process for issuing an extension permit. The article is divided in five sections: introduction (1), subject and scope of the application (2), background and challenges of the expansion (3), its legal framework (4) as well as conclusions and recommendations (5).
AB - The expansion of a sugar production plant requires an adaptation of the existing permissions according to immission law. For this reason, the legal support and control of the expansion project are significant factors for its success. This contribution highlights the key legal aspects which have to be considered before and during an application process for issuing an extension permit. The article is divided in five sections: introduction (1), subject and scope of the application (2), background and challenges of the expansion (3), its legal framework (4) as well as conclusions and recommendations (5).
KW - sugar factory
KW - modification and expansion
KW - legal point of view
KW - Modification and expansion
KW - Legal point of view
KW - Sugar factory
UR - http://www.scopus.com/inward/record.url?scp=85033364224&partnerID=8YFLogxK
U2 - 10.36961/si18813
DO - 10.36961/si18813
M3 - Article
VL - 142
SP - 584
EP - 588
JO - Zuckerindustrie
JF - Zuckerindustrie
SN - 0344-8657
IS - 10
ER -