Details
Titel in Übersetzung | Evaluation of measures in production - Development of a general decision support system to evaluate measures in production |
---|---|
Originalsprache | Deutsch |
Seiten (von - bis) | 558-562 |
Seitenumfang | 5 |
Fachzeitschrift | ZWF Zeitschrift fuer Wirtschaftlichen Fabrikbetrieb |
Jahrgang | 107 |
Ausgabenummer | 7-8 |
Publikationsstatus | Veröffentlicht - 1 Aug. 2012 |
Abstract
Due to the volatile global economy, enterprises are focusing on logistics. Investing in logistic measures realizes a large potential for achieving a good starting point within a competitive field. Enterprises are nowadays challenged with investing available capital to maximize profits. In order to be able to create an informed and quantifiably comprehensible basis for a decision, enterprises need an adequate model for logistically and monetarily evaluating measures in production. The Collaborate Research Centre 489 (SFB 489) at the Institute for Production Systems (IFA) developed a Logistic Information System which provides support in making decisions and is designed specifically for the forging industry. The aim of a beginning research project, called transfer project (T7), has been started in order to develop a universal approach to logistically and monetarily evaluate measures in production.
ASJC Scopus Sachgebiete
- Ingenieurwesen (insg.)
- Allgemeiner Maschinenbau
- Betriebswirtschaft, Management und Rechnungswesen (insg.)
- Strategie und Management
- Entscheidungswissenschaften (insg.)
- Managementlehre und Operations Resarch
Zitieren
- Standard
- Harvard
- Apa
- Vancouver
- BibTex
- RIS
in: ZWF Zeitschrift fuer Wirtschaftlichen Fabrikbetrieb, Jahrgang 107, Nr. 7-8, 01.08.2012, S. 558-562.
Publikation: Beitrag in Fachzeitschrift › Artikel › Forschung › Peer-Review
}
TY - JOUR
T1 - Maßnahmen in der Produktion optimal bewerten
T2 - Entwicklung eines allgemeingültigen Entscheidungsunterstützungssystems
AU - Grigutsch, Michael
AU - Kennemann, Marco
AU - Nyhuis, Peter
PY - 2012/8/1
Y1 - 2012/8/1
N2 - Due to the volatile global economy, enterprises are focusing on logistics. Investing in logistic measures realizes a large potential for achieving a good starting point within a competitive field. Enterprises are nowadays challenged with investing available capital to maximize profits. In order to be able to create an informed and quantifiably comprehensible basis for a decision, enterprises need an adequate model for logistically and monetarily evaluating measures in production. The Collaborate Research Centre 489 (SFB 489) at the Institute for Production Systems (IFA) developed a Logistic Information System which provides support in making decisions and is designed specifically for the forging industry. The aim of a beginning research project, called transfer project (T7), has been started in order to develop a universal approach to logistically and monetarily evaluate measures in production.
AB - Due to the volatile global economy, enterprises are focusing on logistics. Investing in logistic measures realizes a large potential for achieving a good starting point within a competitive field. Enterprises are nowadays challenged with investing available capital to maximize profits. In order to be able to create an informed and quantifiably comprehensible basis for a decision, enterprises need an adequate model for logistically and monetarily evaluating measures in production. The Collaborate Research Centre 489 (SFB 489) at the Institute for Production Systems (IFA) developed a Logistic Information System which provides support in making decisions and is designed specifically for the forging industry. The aim of a beginning research project, called transfer project (T7), has been started in order to develop a universal approach to logistically and monetarily evaluate measures in production.
UR - http://www.scopus.com/inward/record.url?scp=84866253170&partnerID=8YFLogxK
M3 - Artikel
AN - SCOPUS:84866253170
VL - 107
SP - 558
EP - 562
JO - ZWF Zeitschrift fuer Wirtschaftlichen Fabrikbetrieb
JF - ZWF Zeitschrift fuer Wirtschaftlichen Fabrikbetrieb
SN - 0947-0085
IS - 7-8
ER -