Details
Originalsprache | Englisch |
---|---|
Seiten (von - bis) | 343-355 |
Seitenumfang | 13 |
Fachzeitschrift | Production Engineering |
Jahrgang | 11 |
Ausgabenummer | 3 |
Publikationsstatus | Veröffentlicht - 8 Mai 2017 |
Abstract
When designing, planning and controlling supply chains schedule reliability is the central objective and is a key performance indicator for assessing the logistic behaviour of a supply chain. The central influencing factor on schedule reliability is the lateness of supply chain processes. In order to comprehend possible interdependencies between logistical objectives and the influencing factor lateness various approaches have been developed for mathematically describing lateness in a supply chain’s primary processes. This paper focuses on the mathematical description of output lateness distributions in inventory systems. The developed logistic model describes the relationships between stock and service levels as well as the resulting inventory system’s output lateness distribution. Within a comprehensive simulation study the quality of the model’s depiction is demonstrated. The paper concludes with an overview of possibilities for applying the developed model for describing the lateness behaviour in supply chains.
ASJC Scopus Sachgebiete
- Ingenieurwesen (insg.)
- Maschinenbau
- Ingenieurwesen (insg.)
- Wirtschaftsingenieurwesen und Fertigungstechnik
Zitieren
- Standard
- Harvard
- Apa
- Vancouver
- BibTex
- RIS
in: Production Engineering, Jahrgang 11, Nr. 3, 08.05.2017, S. 343-355.
Publikation: Beitrag in Fachzeitschrift › Artikel › Forschung › Peer-Review
}
TY - JOUR
T1 - Logistic modelling of lateness distributions in inventory systems
AU - Nyhuis, Peter
AU - Mayer, Jonas
N1 - Funding information: This work is funded by the German Research Foundation (DFG) under Reference Number NY 4/58-1.
PY - 2017/5/8
Y1 - 2017/5/8
N2 - When designing, planning and controlling supply chains schedule reliability is the central objective and is a key performance indicator for assessing the logistic behaviour of a supply chain. The central influencing factor on schedule reliability is the lateness of supply chain processes. In order to comprehend possible interdependencies between logistical objectives and the influencing factor lateness various approaches have been developed for mathematically describing lateness in a supply chain’s primary processes. This paper focuses on the mathematical description of output lateness distributions in inventory systems. The developed logistic model describes the relationships between stock and service levels as well as the resulting inventory system’s output lateness distribution. Within a comprehensive simulation study the quality of the model’s depiction is demonstrated. The paper concludes with an overview of possibilities for applying the developed model for describing the lateness behaviour in supply chains.
AB - When designing, planning and controlling supply chains schedule reliability is the central objective and is a key performance indicator for assessing the logistic behaviour of a supply chain. The central influencing factor on schedule reliability is the lateness of supply chain processes. In order to comprehend possible interdependencies between logistical objectives and the influencing factor lateness various approaches have been developed for mathematically describing lateness in a supply chain’s primary processes. This paper focuses on the mathematical description of output lateness distributions in inventory systems. The developed logistic model describes the relationships between stock and service levels as well as the resulting inventory system’s output lateness distribution. Within a comprehensive simulation study the quality of the model’s depiction is demonstrated. The paper concludes with an overview of possibilities for applying the developed model for describing the lateness behaviour in supply chains.
KW - Inventory system
KW - Lateness distribution
KW - Lateness modelling
KW - Logistics
UR - http://www.scopus.com/inward/record.url?scp=85019015967&partnerID=8YFLogxK
U2 - 10.1007/s11740-017-0741-8
DO - 10.1007/s11740-017-0741-8
M3 - Article
AN - SCOPUS:85019015967
VL - 11
SP - 343
EP - 355
JO - Production Engineering
JF - Production Engineering
SN - 0944-6524
IS - 3
ER -