Life-cycle financial modelling of long term infrastructure projects "PPP-BOT Projects" under uncertainty and risk

Publikation: Beitrag in Buch/Bericht/Sammelwerk/KonferenzbandAufsatz in KonferenzbandForschungPeer-Review

Autoren

  • M. Attarzadeh
  • D.K.H. Chua
  • L. Zhu
  • M. Beer

Externe Organisationen

  • National University of Singapore
  • The University of Liverpool
Forschungs-netzwerk anzeigen

Details

OriginalspracheEnglisch
Titel des SammelwerksLife-Cycle and Sustainability of Civil Infrastructure Systems
UntertitelProceedings of the 3rd International Symposium on Life-Cycle Civil Engineering, IALCCE 2012
Herausgeber/-innenAlfred Strauss
ErscheinungsortBoca Raton
Seiten991-996
Seitenumfang6
PublikationsstatusVeröffentlicht - 2012
Extern publiziertJa
Veranstaltung3rd International Symposium on Life-Cycle Civil Engineering (IALCCE 2012) - Vienna, Österreich
Dauer: 3 Okt. 20126 Okt. 2012
Konferenznummer: 3

Abstract

Economic modelling and risk analysis are important tools in the appraisal of long term infrastructure and revenue-generating PPP-BOT projects. Analysis of a project is usually performed by considering a number of different scenarios and risk assumptions. The paper will attempt to develop a generalized model for analyzing life cycle financial modelling of PPP-BOT projects, which will provide the much required level of detail. In addition to sensitivity analysis of various risks at any specific time of the project, the proposed model is expected to provide their suitable management and control mechanisms. Various performance measures thus formulated, will together build the general economic model for PPP-BOT projects. Dealing with uncertainty and risk will be addressed by using decision making under uncertainty and risk methods via a case study.

ASJC Scopus Sachgebiete

Zitieren

Life-cycle financial modelling of long term infrastructure projects "PPP-BOT Projects" under uncertainty and risk. / Attarzadeh, M.; Chua, D.K.H.; Zhu, L. et al.
Life-Cycle and Sustainability of Civil Infrastructure Systems: Proceedings of the 3rd International Symposium on Life-Cycle Civil Engineering, IALCCE 2012. Hrsg. / Alfred Strauss. Boca Raton, 2012. S. 991-996.

Publikation: Beitrag in Buch/Bericht/Sammelwerk/KonferenzbandAufsatz in KonferenzbandForschungPeer-Review

Attarzadeh, M, Chua, DKH, Zhu, L & Beer, M 2012, Life-cycle financial modelling of long term infrastructure projects "PPP-BOT Projects" under uncertainty and risk. in A Strauss (Hrsg.), Life-Cycle and Sustainability of Civil Infrastructure Systems: Proceedings of the 3rd International Symposium on Life-Cycle Civil Engineering, IALCCE 2012. Boca Raton, S. 991-996, 3rd International Symposium on Life-Cycle Civil Engineering (IALCCE 2012), Vienna, Österreich, 3 Okt. 2012. <http://b-dig.iie.org.mx/BibDig2/P12-0373/pdf/CH131.pdf>
Attarzadeh, M., Chua, D. K. H., Zhu, L., & Beer, M. (2012). Life-cycle financial modelling of long term infrastructure projects "PPP-BOT Projects" under uncertainty and risk. In A. Strauss (Hrsg.), Life-Cycle and Sustainability of Civil Infrastructure Systems: Proceedings of the 3rd International Symposium on Life-Cycle Civil Engineering, IALCCE 2012 (S. 991-996). http://b-dig.iie.org.mx/BibDig2/P12-0373/pdf/CH131.pdf
Attarzadeh M, Chua DKH, Zhu L, Beer M. Life-cycle financial modelling of long term infrastructure projects "PPP-BOT Projects" under uncertainty and risk. in Strauss A, Hrsg., Life-Cycle and Sustainability of Civil Infrastructure Systems: Proceedings of the 3rd International Symposium on Life-Cycle Civil Engineering, IALCCE 2012. Boca Raton. 2012. S. 991-996
Attarzadeh, M. ; Chua, D.K.H. ; Zhu, L. et al. / Life-cycle financial modelling of long term infrastructure projects "PPP-BOT Projects" under uncertainty and risk. Life-Cycle and Sustainability of Civil Infrastructure Systems: Proceedings of the 3rd International Symposium on Life-Cycle Civil Engineering, IALCCE 2012. Hrsg. / Alfred Strauss. Boca Raton, 2012. S. 991-996
Download
@inproceedings{6790520d3d9b48b28b28b39dce86598d,
title = "Life-cycle financial modelling of long term infrastructure projects {"}PPP-BOT Projects{"} under uncertainty and risk",
abstract = "Economic modelling and risk analysis are important tools in the appraisal of long term infrastructure and revenue-generating PPP-BOT projects. Analysis of a project is usually performed by considering a number of different scenarios and risk assumptions. The paper will attempt to develop a generalized model for analyzing life cycle financial modelling of PPP-BOT projects, which will provide the much required level of detail. In addition to sensitivity analysis of various risks at any specific time of the project, the proposed model is expected to provide their suitable management and control mechanisms. Various performance measures thus formulated, will together build the general economic model for PPP-BOT projects. Dealing with uncertainty and risk will be addressed by using decision making under uncertainty and risk methods via a case study.",
author = "M. Attarzadeh and D.K.H. Chua and L. Zhu and M. Beer",
year = "2012",
language = "English",
isbn = "9780415621267",
pages = "991--996",
editor = "Alfred Strauss",
booktitle = "Life-Cycle and Sustainability of Civil Infrastructure Systems",
note = "3rd International Symposium on Life-Cycle Civil Engineering (IALCCE 2012), IALCCE 2012 ; Conference date: 03-10-2012 Through 06-10-2012",

}

Download

TY - GEN

T1 - Life-cycle financial modelling of long term infrastructure projects "PPP-BOT Projects" under uncertainty and risk

AU - Attarzadeh, M.

AU - Chua, D.K.H.

AU - Zhu, L.

AU - Beer, M.

N1 - Conference code: 3

PY - 2012

Y1 - 2012

N2 - Economic modelling and risk analysis are important tools in the appraisal of long term infrastructure and revenue-generating PPP-BOT projects. Analysis of a project is usually performed by considering a number of different scenarios and risk assumptions. The paper will attempt to develop a generalized model for analyzing life cycle financial modelling of PPP-BOT projects, which will provide the much required level of detail. In addition to sensitivity analysis of various risks at any specific time of the project, the proposed model is expected to provide their suitable management and control mechanisms. Various performance measures thus formulated, will together build the general economic model for PPP-BOT projects. Dealing with uncertainty and risk will be addressed by using decision making under uncertainty and risk methods via a case study.

AB - Economic modelling and risk analysis are important tools in the appraisal of long term infrastructure and revenue-generating PPP-BOT projects. Analysis of a project is usually performed by considering a number of different scenarios and risk assumptions. The paper will attempt to develop a generalized model for analyzing life cycle financial modelling of PPP-BOT projects, which will provide the much required level of detail. In addition to sensitivity analysis of various risks at any specific time of the project, the proposed model is expected to provide their suitable management and control mechanisms. Various performance measures thus formulated, will together build the general economic model for PPP-BOT projects. Dealing with uncertainty and risk will be addressed by using decision making under uncertainty and risk methods via a case study.

UR - http://www.scopus.com/inward/record.url?scp=84874514538&partnerID=8YFLogxK

M3 - Conference contribution

AN - SCOPUS:84874514538

SN - 9780415621267

SP - 991

EP - 996

BT - Life-Cycle and Sustainability of Civil Infrastructure Systems

A2 - Strauss, Alfred

CY - Boca Raton

T2 - 3rd International Symposium on Life-Cycle Civil Engineering (IALCCE 2012)

Y2 - 3 October 2012 through 6 October 2012

ER -

Von denselben Autoren