Job scheduling using event-discrete simulation, pre-optimisation and just-in-time consideration of disturbance factors

Publikation: Beitrag in Buch/Bericht/Sammelwerk/KonferenzbandAufsatz in KonferenzbandForschungPeer-Review

Autorschaft

  • M. Bode
  • C. Schiermeyer
  • V. Berkhahn
Forschungs-netzwerk anzeigen

Details

OriginalspracheEnglisch
Titel des SammelwerkseWork and eBusiness in Architecture, Engineering and Construction - Proceedings of the European Conference on Product and Process Modelling 2012, ECPPM 2012
Seiten227-233
Seitenumfang7
PublikationsstatusVeröffentlicht - 2012
VeranstaltungEuropean Conference on Product and Process Modelling, ECPPM 2012 - Reykjavik, Island
Dauer: 25 Juli 201227 Juli 2012

Publikationsreihe

NameeWork and eBusiness in Architecture, Engineering and Construction - Proceedings of the European Conference on Product and Process Modelling 2012, ECPPM 2012

Abstract

A new approach to simulate and optimise the process at an Intermodal Cargo Transshipment Terminal is presented. Inspired by the concept of a dispatcher, a processing logic combining the advantages of holistic optimisation and event based simulation was created.We describe why holistic optimisation is possible only from a macroscopic point of view and show that our processing logic gives the possibility to react on disturbance factors like train delays and to locally optimise the microscopic process.

ASJC Scopus Sachgebiete

Zitieren

Job scheduling using event-discrete simulation, pre-optimisation and just-in-time consideration of disturbance factors. / Bode, M.; Schiermeyer, C.; Berkhahn, V.
eWork and eBusiness in Architecture, Engineering and Construction - Proceedings of the European Conference on Product and Process Modelling 2012, ECPPM 2012. 2012. S. 227-233 (eWork and eBusiness in Architecture, Engineering and Construction - Proceedings of the European Conference on Product and Process Modelling 2012, ECPPM 2012).

Publikation: Beitrag in Buch/Bericht/Sammelwerk/KonferenzbandAufsatz in KonferenzbandForschungPeer-Review

Bode, M, Schiermeyer, C & Berkhahn, V 2012, Job scheduling using event-discrete simulation, pre-optimisation and just-in-time consideration of disturbance factors. in eWork and eBusiness in Architecture, Engineering and Construction - Proceedings of the European Conference on Product and Process Modelling 2012, ECPPM 2012. eWork and eBusiness in Architecture, Engineering and Construction - Proceedings of the European Conference on Product and Process Modelling 2012, ECPPM 2012, S. 227-233, European Conference on Product and Process Modelling, ECPPM 2012, Reykjavik, Island, 25 Juli 2012. https://doi.org/10.1201/b12516-37
Bode, M., Schiermeyer, C., & Berkhahn, V. (2012). Job scheduling using event-discrete simulation, pre-optimisation and just-in-time consideration of disturbance factors. In eWork and eBusiness in Architecture, Engineering and Construction - Proceedings of the European Conference on Product and Process Modelling 2012, ECPPM 2012 (S. 227-233). (eWork and eBusiness in Architecture, Engineering and Construction - Proceedings of the European Conference on Product and Process Modelling 2012, ECPPM 2012). https://doi.org/10.1201/b12516-37
Bode M, Schiermeyer C, Berkhahn V. Job scheduling using event-discrete simulation, pre-optimisation and just-in-time consideration of disturbance factors. in eWork and eBusiness in Architecture, Engineering and Construction - Proceedings of the European Conference on Product and Process Modelling 2012, ECPPM 2012. 2012. S. 227-233. (eWork and eBusiness in Architecture, Engineering and Construction - Proceedings of the European Conference on Product and Process Modelling 2012, ECPPM 2012). doi: 10.1201/b12516-37
Bode, M. ; Schiermeyer, C. ; Berkhahn, V. / Job scheduling using event-discrete simulation, pre-optimisation and just-in-time consideration of disturbance factors. eWork and eBusiness in Architecture, Engineering and Construction - Proceedings of the European Conference on Product and Process Modelling 2012, ECPPM 2012. 2012. S. 227-233 (eWork and eBusiness in Architecture, Engineering and Construction - Proceedings of the European Conference on Product and Process Modelling 2012, ECPPM 2012).
Download
@inproceedings{ba40c41ddea14352aa8bed2d592287a5,
title = "Job scheduling using event-discrete simulation, pre-optimisation and just-in-time consideration of disturbance factors",
abstract = "A new approach to simulate and optimise the process at an Intermodal Cargo Transshipment Terminal is presented. Inspired by the concept of a dispatcher, a processing logic combining the advantages of holistic optimisation and event based simulation was created.We describe why holistic optimisation is possible only from a macroscopic point of view and show that our processing logic gives the possibility to react on disturbance factors like train delays and to locally optimise the microscopic process.",
author = "M. Bode and C. Schiermeyer and V. Berkhahn",
year = "2012",
doi = "10.1201/b12516-37",
language = "English",
isbn = "9780415621281",
series = "eWork and eBusiness in Architecture, Engineering and Construction - Proceedings of the European Conference on Product and Process Modelling 2012, ECPPM 2012",
pages = "227--233",
booktitle = "eWork and eBusiness in Architecture, Engineering and Construction - Proceedings of the European Conference on Product and Process Modelling 2012, ECPPM 2012",
note = "European Conference on Product and Process Modelling, ECPPM 2012 ; Conference date: 25-07-2012 Through 27-07-2012",

}

Download

TY - GEN

T1 - Job scheduling using event-discrete simulation, pre-optimisation and just-in-time consideration of disturbance factors

AU - Bode, M.

AU - Schiermeyer, C.

AU - Berkhahn, V.

PY - 2012

Y1 - 2012

N2 - A new approach to simulate and optimise the process at an Intermodal Cargo Transshipment Terminal is presented. Inspired by the concept of a dispatcher, a processing logic combining the advantages of holistic optimisation and event based simulation was created.We describe why holistic optimisation is possible only from a macroscopic point of view and show that our processing logic gives the possibility to react on disturbance factors like train delays and to locally optimise the microscopic process.

AB - A new approach to simulate and optimise the process at an Intermodal Cargo Transshipment Terminal is presented. Inspired by the concept of a dispatcher, a processing logic combining the advantages of holistic optimisation and event based simulation was created.We describe why holistic optimisation is possible only from a macroscopic point of view and show that our processing logic gives the possibility to react on disturbance factors like train delays and to locally optimise the microscopic process.

UR - http://www.scopus.com/inward/record.url?scp=84863520385&partnerID=8YFLogxK

U2 - 10.1201/b12516-37

DO - 10.1201/b12516-37

M3 - Conference contribution

AN - SCOPUS:84863520385

SN - 9780415621281

T3 - eWork and eBusiness in Architecture, Engineering and Construction - Proceedings of the European Conference on Product and Process Modelling 2012, ECPPM 2012

SP - 227

EP - 233

BT - eWork and eBusiness in Architecture, Engineering and Construction - Proceedings of the European Conference on Product and Process Modelling 2012, ECPPM 2012

T2 - European Conference on Product and Process Modelling, ECPPM 2012

Y2 - 25 July 2012 through 27 July 2012

ER -