Fuzzy Randomness Simulation of Long-Term Infrastructure Projects

Publikation: Beitrag in FachzeitschriftArtikelForschungPeer-Review

Autorschaft

Externe Organisationen

  • The University of Liverpool
  • Tongji University
  • Nanyang Technological University (NTU)
  • National University of Singapore
Forschungs-netzwerk anzeigen

Details

OriginalspracheEnglisch
Aufsatznummer04017002
Seitenumfang15
FachzeitschriftASCE-ASME Journal of Risk and Uncertainty in Engineering Systems, Part A: Civil Engineering
Jahrgang3
Ausgabenummer3
Frühes Online-Datum23 Jan. 2017
PublikationsstatusVeröffentlicht - Sept. 2017

Abstract

The conventional simulation model used in the prediction of long-term infrastructure development systems such as public-private partnership (PPP)-build-operate-transfer (BOT) projects assumes single probabilistic values for all of the input variables. Traditionally, all the input risks and uncertainties in Monte Carlo simulation (MCS) are modeled based on probability theory. Its result is shown by a probability distribution function (PDF) and a cumulative distribution function (CDF), which are utilized for analyzing and decision making. In reality, however, some of the variables are estimated based on expert judgment and others are derived from historical data. Further, the parameters' data of the probability distribution for the simulation model input are subject to change and difficult to predict. Therefore, a simulation model that is capable of handling both types of fuzzy and probabilistic input variables is needed and vital. Recently fuzzy randomness, which is an extension of classical probability theory, provides additional features and improvements for combining fuzzy and probabilistic data to overcome aforementioned shortcomings. Fuzzy randomness-Monte Carlo simulation (FR-MCS) technique is a hybrid simulation method used for risk and uncertainty evaluation. The proposed approach permits any type of risk and uncertainty in the input values to be explicitly defined prior to the analysis and decision making. It extends the practical use of the conventional MCS by providing the capability of choosing between fuzzy sets and probability distributions. This is done to quantify the input risks and uncertainties in a simulation. A new algorithm for generating fuzzy random variables is developed as part of the proposed FR-MCS technique based on the α-cut. FR-MCS output results are represented by fuzzy probability and the decision variables are modeled by fuzzy CDF. The FR-MCS technique is demonstrated in a PPP-BOT case study. The FR-MCS results are compared with those obtained from conventional MCS. It is shown that the FR-MCS technique facilitates decision making for both the public and private sectors' decision makers involved in PPP-BOT projects. This is done by determining a negotiation bound for negotiable concession items (NCIs) instead of precise values as are used in conventional MCS results. This approach prevents prolonged and costly negotiations in the development phase of PPP-BOT projects by providing more flexibility for decision makers. Both parties could take advantage of this technique at the negotiation table.

ASJC Scopus Sachgebiete

Zitieren

Fuzzy Randomness Simulation of Long-Term Infrastructure Projects. / Attarzadeh, Meghdad; Chua, K. H.; Beer, Michael et al.
in: ASCE-ASME Journal of Risk and Uncertainty in Engineering Systems, Part A: Civil Engineering, Jahrgang 3, Nr. 3, 04017002, 09.2017.

Publikation: Beitrag in FachzeitschriftArtikelForschungPeer-Review

Attarzadeh, M, Chua, KH, Beer, M & Abbott, LS 2017, 'Fuzzy Randomness Simulation of Long-Term Infrastructure Projects', ASCE-ASME Journal of Risk and Uncertainty in Engineering Systems, Part A: Civil Engineering, Jg. 3, Nr. 3, 04017002. https://doi.org/10.1061/AJRUA6.0000902
Attarzadeh, M., Chua, K. H., Beer, M., & Abbott, L. S. (2017). Fuzzy Randomness Simulation of Long-Term Infrastructure Projects. ASCE-ASME Journal of Risk and Uncertainty in Engineering Systems, Part A: Civil Engineering, 3(3), Artikel 04017002. https://doi.org/10.1061/AJRUA6.0000902
Attarzadeh M, Chua KH, Beer M, Abbott LS. Fuzzy Randomness Simulation of Long-Term Infrastructure Projects. ASCE-ASME Journal of Risk and Uncertainty in Engineering Systems, Part A: Civil Engineering. 2017 Sep;3(3):04017002. Epub 2017 Jan 23. doi: 10.1061/AJRUA6.0000902
Attarzadeh, Meghdad ; Chua, K. H. ; Beer, Michael et al. / Fuzzy Randomness Simulation of Long-Term Infrastructure Projects. in: ASCE-ASME Journal of Risk and Uncertainty in Engineering Systems, Part A: Civil Engineering. 2017 ; Jahrgang 3, Nr. 3.
Download
@article{d74273a9509b474daacff287c03098b2,
title = "Fuzzy Randomness Simulation of Long-Term Infrastructure Projects",
abstract = "The conventional simulation model used in the prediction of long-term infrastructure development systems such as public-private partnership (PPP)-build-operate-transfer (BOT) projects assumes single probabilistic values for all of the input variables. Traditionally, all the input risks and uncertainties in Monte Carlo simulation (MCS) are modeled based on probability theory. Its result is shown by a probability distribution function (PDF) and a cumulative distribution function (CDF), which are utilized for analyzing and decision making. In reality, however, some of the variables are estimated based on expert judgment and others are derived from historical data. Further, the parameters' data of the probability distribution for the simulation model input are subject to change and difficult to predict. Therefore, a simulation model that is capable of handling both types of fuzzy and probabilistic input variables is needed and vital. Recently fuzzy randomness, which is an extension of classical probability theory, provides additional features and improvements for combining fuzzy and probabilistic data to overcome aforementioned shortcomings. Fuzzy randomness-Monte Carlo simulation (FR-MCS) technique is a hybrid simulation method used for risk and uncertainty evaluation. The proposed approach permits any type of risk and uncertainty in the input values to be explicitly defined prior to the analysis and decision making. It extends the practical use of the conventional MCS by providing the capability of choosing between fuzzy sets and probability distributions. This is done to quantify the input risks and uncertainties in a simulation. A new algorithm for generating fuzzy random variables is developed as part of the proposed FR-MCS technique based on the α-cut. FR-MCS output results are represented by fuzzy probability and the decision variables are modeled by fuzzy CDF. The FR-MCS technique is demonstrated in a PPP-BOT case study. The FR-MCS results are compared with those obtained from conventional MCS. It is shown that the FR-MCS technique facilitates decision making for both the public and private sectors' decision makers involved in PPP-BOT projects. This is done by determining a negotiation bound for negotiable concession items (NCIs) instead of precise values as are used in conventional MCS results. This approach prevents prolonged and costly negotiations in the development phase of PPP-BOT projects by providing more flexibility for decision makers. Both parties could take advantage of this technique at the negotiation table.",
author = "Meghdad Attarzadeh and Chua, {K. H.} and Michael Beer and Abbott, {L. S.}",
note = "Publisher Copyright: {\textcopyright} 2017 American Society of Civil Engineers. Copyright: Copyright 2018 Elsevier B.V., All rights reserved.",
year = "2017",
month = sep,
doi = "10.1061/AJRUA6.0000902",
language = "English",
volume = "3",
number = "3",

}

Download

TY - JOUR

T1 - Fuzzy Randomness Simulation of Long-Term Infrastructure Projects

AU - Attarzadeh, Meghdad

AU - Chua, K. H.

AU - Beer, Michael

AU - Abbott, L. S.

N1 - Publisher Copyright: © 2017 American Society of Civil Engineers. Copyright: Copyright 2018 Elsevier B.V., All rights reserved.

PY - 2017/9

Y1 - 2017/9

N2 - The conventional simulation model used in the prediction of long-term infrastructure development systems such as public-private partnership (PPP)-build-operate-transfer (BOT) projects assumes single probabilistic values for all of the input variables. Traditionally, all the input risks and uncertainties in Monte Carlo simulation (MCS) are modeled based on probability theory. Its result is shown by a probability distribution function (PDF) and a cumulative distribution function (CDF), which are utilized for analyzing and decision making. In reality, however, some of the variables are estimated based on expert judgment and others are derived from historical data. Further, the parameters' data of the probability distribution for the simulation model input are subject to change and difficult to predict. Therefore, a simulation model that is capable of handling both types of fuzzy and probabilistic input variables is needed and vital. Recently fuzzy randomness, which is an extension of classical probability theory, provides additional features and improvements for combining fuzzy and probabilistic data to overcome aforementioned shortcomings. Fuzzy randomness-Monte Carlo simulation (FR-MCS) technique is a hybrid simulation method used for risk and uncertainty evaluation. The proposed approach permits any type of risk and uncertainty in the input values to be explicitly defined prior to the analysis and decision making. It extends the practical use of the conventional MCS by providing the capability of choosing between fuzzy sets and probability distributions. This is done to quantify the input risks and uncertainties in a simulation. A new algorithm for generating fuzzy random variables is developed as part of the proposed FR-MCS technique based on the α-cut. FR-MCS output results are represented by fuzzy probability and the decision variables are modeled by fuzzy CDF. The FR-MCS technique is demonstrated in a PPP-BOT case study. The FR-MCS results are compared with those obtained from conventional MCS. It is shown that the FR-MCS technique facilitates decision making for both the public and private sectors' decision makers involved in PPP-BOT projects. This is done by determining a negotiation bound for negotiable concession items (NCIs) instead of precise values as are used in conventional MCS results. This approach prevents prolonged and costly negotiations in the development phase of PPP-BOT projects by providing more flexibility for decision makers. Both parties could take advantage of this technique at the negotiation table.

AB - The conventional simulation model used in the prediction of long-term infrastructure development systems such as public-private partnership (PPP)-build-operate-transfer (BOT) projects assumes single probabilistic values for all of the input variables. Traditionally, all the input risks and uncertainties in Monte Carlo simulation (MCS) are modeled based on probability theory. Its result is shown by a probability distribution function (PDF) and a cumulative distribution function (CDF), which are utilized for analyzing and decision making. In reality, however, some of the variables are estimated based on expert judgment and others are derived from historical data. Further, the parameters' data of the probability distribution for the simulation model input are subject to change and difficult to predict. Therefore, a simulation model that is capable of handling both types of fuzzy and probabilistic input variables is needed and vital. Recently fuzzy randomness, which is an extension of classical probability theory, provides additional features and improvements for combining fuzzy and probabilistic data to overcome aforementioned shortcomings. Fuzzy randomness-Monte Carlo simulation (FR-MCS) technique is a hybrid simulation method used for risk and uncertainty evaluation. The proposed approach permits any type of risk and uncertainty in the input values to be explicitly defined prior to the analysis and decision making. It extends the practical use of the conventional MCS by providing the capability of choosing between fuzzy sets and probability distributions. This is done to quantify the input risks and uncertainties in a simulation. A new algorithm for generating fuzzy random variables is developed as part of the proposed FR-MCS technique based on the α-cut. FR-MCS output results are represented by fuzzy probability and the decision variables are modeled by fuzzy CDF. The FR-MCS technique is demonstrated in a PPP-BOT case study. The FR-MCS results are compared with those obtained from conventional MCS. It is shown that the FR-MCS technique facilitates decision making for both the public and private sectors' decision makers involved in PPP-BOT projects. This is done by determining a negotiation bound for negotiable concession items (NCIs) instead of precise values as are used in conventional MCS results. This approach prevents prolonged and costly negotiations in the development phase of PPP-BOT projects by providing more flexibility for decision makers. Both parties could take advantage of this technique at the negotiation table.

UR - http://www.scopus.com/inward/record.url?scp=85035100033&partnerID=8YFLogxK

U2 - 10.1061/AJRUA6.0000902

DO - 10.1061/AJRUA6.0000902

M3 - Article

AN - SCOPUS:85035100033

VL - 3

JO - ASCE-ASME Journal of Risk and Uncertainty in Engineering Systems, Part A: Civil Engineering

JF - ASCE-ASME Journal of Risk and Uncertainty in Engineering Systems, Part A: Civil Engineering

SN - 2376-7642

IS - 3

M1 - 04017002

ER -

Von denselben Autoren