Details
Originalsprache | Englisch |
---|---|
Titel des Sammelwerks | Heat Transfer; Electric Power; Industrial and Cogeneration |
Herausgeber (Verlag) | American Society of Mechanical Engineers(ASME) |
ISBN (elektronisch) | 9780791878705 |
Publikationsstatus | Veröffentlicht - 1997 |
Extern publiziert | Ja |
Veranstaltung | ASME 1997 International Gas Turbine and Aeroengine Congress and Exhibition, GT 1997 - Orlando, USA / Vereinigte Staaten Dauer: 2 Juni 1997 → 5 Juni 1997 |
Publikationsreihe
Name | Proceedings of the ASME Turbo Expo |
---|---|
Band | 3 |
Abstract
The first V84.3A gas turbine as tested at the full-load test facility of the Siemens gas turbine factory in Berlin, Germany has now been installed at the Kansas City Power & Light ( KCP&L ) Company's Hawthorn Power Station. The unit will be started in spring of this year and is scheduled to be available in June for the 1997 summer peak. In times when active power is not in demand, the generator can be operated as a synchronous condenser. For this mode of operation, a synchronous clutch has been installed between the gas turbine and the generator. The advanced V84.3A gas turbine has been chosen because of its high simple cycle efficiency based on the measured 38% in the test facility, providing peaking capacity with a minimum on fuel costs. In addition, later conversion to highly efficient combined cycle operation can easily be performed without the need for external air or even steam cooling systems.
ASJC Scopus Sachgebiete
- Ingenieurwesen (insg.)
- Allgemeiner Maschinenbau
Zitieren
- Standard
- Harvard
- Apa
- Vancouver
- BibTex
- RIS
Heat Transfer; Electric Power; Industrial and Cogeneration. American Society of Mechanical Engineers(ASME), 1997. (Proceedings of the ASME Turbo Expo; Band 3).
Publikation: Beitrag in Buch/Bericht/Sammelwerk/Konferenzband › Aufsatz in Konferenzband › Forschung › Peer-Review
}
TY - GEN
T1 - First V84.3A gas turbine installation at hawthorn station
AU - Johnson, T.
AU - Becker, B.
AU - Seume, J.
AU - Termuehlen, H.
PY - 1997
Y1 - 1997
N2 - The first V84.3A gas turbine as tested at the full-load test facility of the Siemens gas turbine factory in Berlin, Germany has now been installed at the Kansas City Power & Light ( KCP&L ) Company's Hawthorn Power Station. The unit will be started in spring of this year and is scheduled to be available in June for the 1997 summer peak. In times when active power is not in demand, the generator can be operated as a synchronous condenser. For this mode of operation, a synchronous clutch has been installed between the gas turbine and the generator. The advanced V84.3A gas turbine has been chosen because of its high simple cycle efficiency based on the measured 38% in the test facility, providing peaking capacity with a minimum on fuel costs. In addition, later conversion to highly efficient combined cycle operation can easily be performed without the need for external air or even steam cooling systems.
AB - The first V84.3A gas turbine as tested at the full-load test facility of the Siemens gas turbine factory in Berlin, Germany has now been installed at the Kansas City Power & Light ( KCP&L ) Company's Hawthorn Power Station. The unit will be started in spring of this year and is scheduled to be available in June for the 1997 summer peak. In times when active power is not in demand, the generator can be operated as a synchronous condenser. For this mode of operation, a synchronous clutch has been installed between the gas turbine and the generator. The advanced V84.3A gas turbine has been chosen because of its high simple cycle efficiency based on the measured 38% in the test facility, providing peaking capacity with a minimum on fuel costs. In addition, later conversion to highly efficient combined cycle operation can easily be performed without the need for external air or even steam cooling systems.
UR - http://www.scopus.com/inward/record.url?scp=84973664660&partnerID=8YFLogxK
U2 - 10.1115/97-GT-357
DO - 10.1115/97-GT-357
M3 - Conference contribution
AN - SCOPUS:84973664660
T3 - Proceedings of the ASME Turbo Expo
BT - Heat Transfer; Electric Power; Industrial and Cogeneration
PB - American Society of Mechanical Engineers(ASME)