First V84.3A gas turbine installation at hawthorn station

Publikation: Beitrag in Buch/Bericht/Sammelwerk/KonferenzbandAufsatz in KonferenzbandForschungPeer-Review

Autoren

  • T. Johnson
  • B. Becker
  • J. Seume
  • H. Termuehlen

Externe Organisationen

  • Kansas City Power and Light
  • Siemens AG
  • Siemens USA
Forschungs-netzwerk anzeigen

Details

OriginalspracheEnglisch
Titel des SammelwerksHeat Transfer; Electric Power; Industrial and Cogeneration
Herausgeber (Verlag)American Society of Mechanical Engineers(ASME)
ISBN (elektronisch)9780791878705
PublikationsstatusVeröffentlicht - 1997
Extern publiziertJa
VeranstaltungASME 1997 International Gas Turbine and Aeroengine Congress and Exhibition, GT 1997 - Orlando, USA / Vereinigte Staaten
Dauer: 2 Juni 19975 Juni 1997

Publikationsreihe

NameProceedings of the ASME Turbo Expo
Band3

Abstract

The first V84.3A gas turbine as tested at the full-load test facility of the Siemens gas turbine factory in Berlin, Germany has now been installed at the Kansas City Power & Light ( KCP&L ) Company's Hawthorn Power Station. The unit will be started in spring of this year and is scheduled to be available in June for the 1997 summer peak. In times when active power is not in demand, the generator can be operated as a synchronous condenser. For this mode of operation, a synchronous clutch has been installed between the gas turbine and the generator. The advanced V84.3A gas turbine has been chosen because of its high simple cycle efficiency based on the measured 38% in the test facility, providing peaking capacity with a minimum on fuel costs. In addition, later conversion to highly efficient combined cycle operation can easily be performed without the need for external air or even steam cooling systems.

ASJC Scopus Sachgebiete

Zitieren

First V84.3A gas turbine installation at hawthorn station. / Johnson, T.; Becker, B.; Seume, J. et al.
Heat Transfer; Electric Power; Industrial and Cogeneration. American Society of Mechanical Engineers(ASME), 1997. (Proceedings of the ASME Turbo Expo; Band 3).

Publikation: Beitrag in Buch/Bericht/Sammelwerk/KonferenzbandAufsatz in KonferenzbandForschungPeer-Review

Johnson, T, Becker, B, Seume, J & Termuehlen, H 1997, First V84.3A gas turbine installation at hawthorn station. in Heat Transfer; Electric Power; Industrial and Cogeneration. Proceedings of the ASME Turbo Expo, Bd. 3, American Society of Mechanical Engineers(ASME), ASME 1997 International Gas Turbine and Aeroengine Congress and Exhibition, GT 1997, Orlando, USA / Vereinigte Staaten, 2 Juni 1997. https://doi.org/10.1115/97-GT-357
Johnson, T., Becker, B., Seume, J., & Termuehlen, H. (1997). First V84.3A gas turbine installation at hawthorn station. In Heat Transfer; Electric Power; Industrial and Cogeneration (Proceedings of the ASME Turbo Expo; Band 3). American Society of Mechanical Engineers(ASME). https://doi.org/10.1115/97-GT-357
Johnson T, Becker B, Seume J, Termuehlen H. First V84.3A gas turbine installation at hawthorn station. in Heat Transfer; Electric Power; Industrial and Cogeneration. American Society of Mechanical Engineers(ASME). 1997. (Proceedings of the ASME Turbo Expo). doi: 10.1115/97-GT-357
Johnson, T. ; Becker, B. ; Seume, J. et al. / First V84.3A gas turbine installation at hawthorn station. Heat Transfer; Electric Power; Industrial and Cogeneration. American Society of Mechanical Engineers(ASME), 1997. (Proceedings of the ASME Turbo Expo).
Download
@inproceedings{e6fd4fc2b4194083983c243c1f06e211,
title = "First V84.3A gas turbine installation at hawthorn station",
abstract = "The first V84.3A gas turbine as tested at the full-load test facility of the Siemens gas turbine factory in Berlin, Germany has now been installed at the Kansas City Power & Light ( KCP&L ) Company's Hawthorn Power Station. The unit will be started in spring of this year and is scheduled to be available in June for the 1997 summer peak. In times when active power is not in demand, the generator can be operated as a synchronous condenser. For this mode of operation, a synchronous clutch has been installed between the gas turbine and the generator. The advanced V84.3A gas turbine has been chosen because of its high simple cycle efficiency based on the measured 38% in the test facility, providing peaking capacity with a minimum on fuel costs. In addition, later conversion to highly efficient combined cycle operation can easily be performed without the need for external air or even steam cooling systems.",
author = "T. Johnson and B. Becker and J. Seume and H. Termuehlen",
year = "1997",
doi = "10.1115/97-GT-357",
language = "English",
series = "Proceedings of the ASME Turbo Expo",
publisher = "American Society of Mechanical Engineers(ASME)",
booktitle = "Heat Transfer; Electric Power; Industrial and Cogeneration",
address = "United States",
note = "ASME 1997 International Gas Turbine and Aeroengine Congress and Exhibition, GT 1997 ; Conference date: 02-06-1997 Through 05-06-1997",

}

Download

TY - GEN

T1 - First V84.3A gas turbine installation at hawthorn station

AU - Johnson, T.

AU - Becker, B.

AU - Seume, J.

AU - Termuehlen, H.

PY - 1997

Y1 - 1997

N2 - The first V84.3A gas turbine as tested at the full-load test facility of the Siemens gas turbine factory in Berlin, Germany has now been installed at the Kansas City Power & Light ( KCP&L ) Company's Hawthorn Power Station. The unit will be started in spring of this year and is scheduled to be available in June for the 1997 summer peak. In times when active power is not in demand, the generator can be operated as a synchronous condenser. For this mode of operation, a synchronous clutch has been installed between the gas turbine and the generator. The advanced V84.3A gas turbine has been chosen because of its high simple cycle efficiency based on the measured 38% in the test facility, providing peaking capacity with a minimum on fuel costs. In addition, later conversion to highly efficient combined cycle operation can easily be performed without the need for external air or even steam cooling systems.

AB - The first V84.3A gas turbine as tested at the full-load test facility of the Siemens gas turbine factory in Berlin, Germany has now been installed at the Kansas City Power & Light ( KCP&L ) Company's Hawthorn Power Station. The unit will be started in spring of this year and is scheduled to be available in June for the 1997 summer peak. In times when active power is not in demand, the generator can be operated as a synchronous condenser. For this mode of operation, a synchronous clutch has been installed between the gas turbine and the generator. The advanced V84.3A gas turbine has been chosen because of its high simple cycle efficiency based on the measured 38% in the test facility, providing peaking capacity with a minimum on fuel costs. In addition, later conversion to highly efficient combined cycle operation can easily be performed without the need for external air or even steam cooling systems.

UR - http://www.scopus.com/inward/record.url?scp=84973664660&partnerID=8YFLogxK

U2 - 10.1115/97-GT-357

DO - 10.1115/97-GT-357

M3 - Conference contribution

AN - SCOPUS:84973664660

T3 - Proceedings of the ASME Turbo Expo

BT - Heat Transfer; Electric Power; Industrial and Cogeneration

PB - American Society of Mechanical Engineers(ASME)

T2 - ASME 1997 International Gas Turbine and Aeroengine Congress and Exhibition, GT 1997

Y2 - 2 June 1997 through 5 June 1997

ER -