Exploring Effects of Sequencing Modes towards Logistics Target Achievement on the Example of Steel Production

Publikation: Beitrag in FachzeitschriftKonferenzaufsatz in FachzeitschriftForschungPeer-Review

Autoren

  • Katja Windt
  • Peter Nyhuis
  • Oliver Herr

Externe Organisationen

  • Constructor University Bremen
Forschungs-netzwerk anzeigen

Details

OriginalspracheEnglisch
Seiten (von - bis)620-625
Seitenumfang6
FachzeitschriftProcedia CIRP
Jahrgang3
Ausgabenummer1
PublikationsstatusVeröffentlicht - 15 Aug. 2012
Veranstaltung45th CIRP Conference on Manufacturing Systems, CMS 2012 - Athens, Griechenland
Dauer: 16 Mai 201218 Mai 2012

Abstract

The objective of this paper is to discuss the logistics target conflict of achieving both low set-up costs and high due-date reliability. We are introducing first approaches towards a methodology dealing with this target conflict which enables a strategic positioning on behalf of new Sequencing Operating Curves. Based on an industry case study in the steel industry, we are describing the problem of batching and sequencing under highly demanding technologically constraints. Analysis based on industry data display the extent of the described problem in practice.

ASJC Scopus Sachgebiete

Zitieren

Exploring Effects of Sequencing Modes towards Logistics Target Achievement on the Example of Steel Production. / Windt, Katja; Nyhuis, Peter; Herr, Oliver.
in: Procedia CIRP, Jahrgang 3, Nr. 1, 15.08.2012, S. 620-625.

Publikation: Beitrag in FachzeitschriftKonferenzaufsatz in FachzeitschriftForschungPeer-Review

Windt K, Nyhuis P, Herr O. Exploring Effects of Sequencing Modes towards Logistics Target Achievement on the Example of Steel Production. Procedia CIRP. 2012 Aug 15;3(1):620-625. doi: 10.1016/j.procir.2012.07.106
Windt, Katja ; Nyhuis, Peter ; Herr, Oliver. / Exploring Effects of Sequencing Modes towards Logistics Target Achievement on the Example of Steel Production. in: Procedia CIRP. 2012 ; Jahrgang 3, Nr. 1. S. 620-625.
Download
@article{abf6515fab93419c902254807090b2bf,
title = "Exploring Effects of Sequencing Modes towards Logistics Target Achievement on the Example of Steel Production",
abstract = "The objective of this paper is to discuss the logistics target conflict of achieving both low set-up costs and high due-date reliability. We are introducing first approaches towards a methodology dealing with this target conflict which enables a strategic positioning on behalf of new Sequencing Operating Curves. Based on an industry case study in the steel industry, we are describing the problem of batching and sequencing under highly demanding technologically constraints. Analysis based on industry data display the extent of the described problem in practice.",
keywords = "Due date reliabiltiy, Industry case study, Logistics targets, Production control, Steel production sequencing",
author = "Katja Windt and Peter Nyhuis and Oliver Herr",
year = "2012",
month = aug,
day = "15",
doi = "10.1016/j.procir.2012.07.106",
language = "English",
volume = "3",
pages = "620--625",
number = "1",
note = "45th CIRP Conference on Manufacturing Systems, CMS 2012 ; Conference date: 16-05-2012 Through 18-05-2012",

}

Download

TY - JOUR

T1 - Exploring Effects of Sequencing Modes towards Logistics Target Achievement on the Example of Steel Production

AU - Windt, Katja

AU - Nyhuis, Peter

AU - Herr, Oliver

PY - 2012/8/15

Y1 - 2012/8/15

N2 - The objective of this paper is to discuss the logistics target conflict of achieving both low set-up costs and high due-date reliability. We are introducing first approaches towards a methodology dealing with this target conflict which enables a strategic positioning on behalf of new Sequencing Operating Curves. Based on an industry case study in the steel industry, we are describing the problem of batching and sequencing under highly demanding technologically constraints. Analysis based on industry data display the extent of the described problem in practice.

AB - The objective of this paper is to discuss the logistics target conflict of achieving both low set-up costs and high due-date reliability. We are introducing first approaches towards a methodology dealing with this target conflict which enables a strategic positioning on behalf of new Sequencing Operating Curves. Based on an industry case study in the steel industry, we are describing the problem of batching and sequencing under highly demanding technologically constraints. Analysis based on industry data display the extent of the described problem in practice.

KW - Due date reliabiltiy

KW - Industry case study

KW - Logistics targets

KW - Production control

KW - Steel production sequencing

UR - http://www.scopus.com/inward/record.url?scp=84879193263&partnerID=8YFLogxK

U2 - 10.1016/j.procir.2012.07.106

DO - 10.1016/j.procir.2012.07.106

M3 - Conference article

AN - SCOPUS:84879193263

VL - 3

SP - 620

EP - 625

JO - Procedia CIRP

JF - Procedia CIRP

SN - 2212-8271

IS - 1

T2 - 45th CIRP Conference on Manufacturing Systems, CMS 2012

Y2 - 16 May 2012 through 18 May 2012

ER -