Details
Originalsprache | Englisch |
---|---|
Seiten (von - bis) | 45-50 |
Seitenumfang | 6 |
Fachzeitschrift | Procedia CIRP |
Jahrgang | 62 |
Publikationsstatus | Veröffentlicht - 18 Mai 2017 |
Veranstaltung | 10th CIRP Conference on Intelligent Computation in Manufacturing Engineering - CIRP ICME 2016 - Ischia, Italien Dauer: 20 Juli 2016 → 22 Juli 2016 |
Abstract
Development of composite structure which are both light and economically competitive is challenging. A new method for the development of CRFP lightweight structures implements a frequent interaction of design and production planning starting in an early design stage. As part of this, production alternatives need to be compared in terms of cost and impact on structural mass. This paper describes how a software module automatically determines suitable process chains based on a preliminary structural design. Cost of production is estimated using analytical process models dealing with imprecise design information. Applied to an aircraft fuselage panel, the method estimates cost and mass of different production alternatives.
ASJC Scopus Sachgebiete
- Ingenieurwesen (insg.)
- Steuerungs- und Systemtechnik
- Ingenieurwesen (insg.)
- Wirtschaftsingenieurwesen und Fertigungstechnik
Zitieren
- Standard
- Harvard
- Apa
- Vancouver
- BibTex
- RIS
in: Procedia CIRP, Jahrgang 62, 18.05.2017, S. 45-50.
Publikation: Beitrag in Fachzeitschrift › Konferenzaufsatz in Fachzeitschrift › Forschung › Peer-Review
}
TY - JOUR
T1 - Estimation of production cost in an early design stage of CFRP lightweight structures
AU - Denkena, Berend
AU - Horst, Peter
AU - Schmidt, Carsten
AU - Behr, Matthias
AU - Krieglsteiner, Joscha
PY - 2017/5/18
Y1 - 2017/5/18
N2 - Development of composite structure which are both light and economically competitive is challenging. A new method for the development of CRFP lightweight structures implements a frequent interaction of design and production planning starting in an early design stage. As part of this, production alternatives need to be compared in terms of cost and impact on structural mass. This paper describes how a software module automatically determines suitable process chains based on a preliminary structural design. Cost of production is estimated using analytical process models dealing with imprecise design information. Applied to an aircraft fuselage panel, the method estimates cost and mass of different production alternatives.
AB - Development of composite structure which are both light and economically competitive is challenging. A new method for the development of CRFP lightweight structures implements a frequent interaction of design and production planning starting in an early design stage. As part of this, production alternatives need to be compared in terms of cost and impact on structural mass. This paper describes how a software module automatically determines suitable process chains based on a preliminary structural design. Cost of production is estimated using analytical process models dealing with imprecise design information. Applied to an aircraft fuselage panel, the method estimates cost and mass of different production alternatives.
KW - Composite
KW - Design method
KW - Development
KW - Methodology
KW - Planning
KW - Production
UR - http://www.scopus.com/inward/record.url?scp=85020756055&partnerID=8YFLogxK
U2 - 10.1016/j.procir.2016.06.031
DO - 10.1016/j.procir.2016.06.031
M3 - Conference article
AN - SCOPUS:85020756055
VL - 62
SP - 45
EP - 50
JO - Procedia CIRP
JF - Procedia CIRP
SN - 2212-8271
T2 - 10th CIRP Conference on Intelligent Computation in Manufacturing Engineering - CIRP ICME 2016
Y2 - 20 July 2016 through 22 July 2016
ER -