Erarbeitung einer zeitdynamischen Kalkulationsmethode unter Einbeziehung kapazitiver Einflüsse

Publikation: Beitrag in FachzeitschriftArtikelForschungPeer-Review

Autorschaft

  • Berend Denkena
  • Andrea Nemeti
  • Jan Schürmeyer
  • Marian Köller
Forschungs-netzwerk anzeigen

Details

Titel in ÜbersetzungWorking up a temporal dynamic method of calculation with consideration of capacitive factors
OriginalspracheDeutsch
Seiten (von - bis)157-160
Seitenumfang4
FachzeitschriftZWF Zeitschrift fuer Wirtschaftlichen Fabrikbetrieb
Jahrgang106
Ausgabenummer3
PublikationsstatusVeröffentlicht - März 2011

Abstract

A time-dynamic calculation approach considering capacitive factors. The tool and mould making Industry needs an individual calculation because of their typical unique manufacturing and their attention to customer requirements. At the same time prices and dates of delivery are already fixed in the phase of supply planning. This leads to high demands on cost calculation and job order planning. Today a variety of supporting software systems is offered. However, they hardly consider time-dynamic components and prevent a transparent time-based argumentation. This paper presents an approach to a "time-dynamic calculation", which allows a time and capacity related price argumentation. First of all the situation of the tool and mould making industry is described and current approaches to price argumentations are described and evaluated. On this basis the Institute of Production Engineering and Machine Tools (IFW) of the Leibniz Unlversität Hannover is developing a concept to integrate time-dynamic components in the supply planning.

ASJC Scopus Sachgebiete

Zitieren

Erarbeitung einer zeitdynamischen Kalkulationsmethode unter Einbeziehung kapazitiver Einflüsse. / Denkena, Berend; Nemeti, Andrea; Schürmeyer, Jan et al.
in: ZWF Zeitschrift fuer Wirtschaftlichen Fabrikbetrieb, Jahrgang 106, Nr. 3, 03.2011, S. 157-160.

Publikation: Beitrag in FachzeitschriftArtikelForschungPeer-Review

Denkena, B, Nemeti, A, Schürmeyer, J & Köller, M 2011, 'Erarbeitung einer zeitdynamischen Kalkulationsmethode unter Einbeziehung kapazitiver Einflüsse', ZWF Zeitschrift fuer Wirtschaftlichen Fabrikbetrieb, Jg. 106, Nr. 3, S. 157-160. https://doi.org/10.3139/104.110525
Denkena, B., Nemeti, A., Schürmeyer, J., & Köller, M. (2011). Erarbeitung einer zeitdynamischen Kalkulationsmethode unter Einbeziehung kapazitiver Einflüsse. ZWF Zeitschrift fuer Wirtschaftlichen Fabrikbetrieb, 106(3), 157-160. https://doi.org/10.3139/104.110525
Denkena B, Nemeti A, Schürmeyer J, Köller M. Erarbeitung einer zeitdynamischen Kalkulationsmethode unter Einbeziehung kapazitiver Einflüsse. ZWF Zeitschrift fuer Wirtschaftlichen Fabrikbetrieb. 2011 Mär;106(3):157-160. doi: 10.3139/104.110525
Denkena, Berend ; Nemeti, Andrea ; Schürmeyer, Jan et al. / Erarbeitung einer zeitdynamischen Kalkulationsmethode unter Einbeziehung kapazitiver Einflüsse. in: ZWF Zeitschrift fuer Wirtschaftlichen Fabrikbetrieb. 2011 ; Jahrgang 106, Nr. 3. S. 157-160.
Download
@article{fea2ea0dbcee46b09a40e7bc55398260,
title = "Erarbeitung einer zeitdynamischen Kalkulationsmethode unter Einbeziehung kapazitiver Einfl{\"u}sse",
abstract = "A time-dynamic calculation approach considering capacitive factors. The tool and mould making Industry needs an individual calculation because of their typical unique manufacturing and their attention to customer requirements. At the same time prices and dates of delivery are already fixed in the phase of supply planning. This leads to high demands on cost calculation and job order planning. Today a variety of supporting software systems is offered. However, they hardly consider time-dynamic components and prevent a transparent time-based argumentation. This paper presents an approach to a {"}time-dynamic calculation{"}, which allows a time and capacity related price argumentation. First of all the situation of the tool and mould making industry is described and current approaches to price argumentations are described and evaluated. On this basis the Institute of Production Engineering and Machine Tools (IFW) of the Leibniz Unlversit{\"a}t Hannover is developing a concept to integrate time-dynamic components in the supply planning.",
author = "Berend Denkena and Andrea Nemeti and Jan Sch{\"u}rmeyer and Marian K{\"o}ller",
year = "2011",
month = mar,
doi = "10.3139/104.110525",
language = "Deutsch",
volume = "106",
pages = "157--160",
number = "3",

}

Download

TY - JOUR

T1 - Erarbeitung einer zeitdynamischen Kalkulationsmethode unter Einbeziehung kapazitiver Einflüsse

AU - Denkena, Berend

AU - Nemeti, Andrea

AU - Schürmeyer, Jan

AU - Köller, Marian

PY - 2011/3

Y1 - 2011/3

N2 - A time-dynamic calculation approach considering capacitive factors. The tool and mould making Industry needs an individual calculation because of their typical unique manufacturing and their attention to customer requirements. At the same time prices and dates of delivery are already fixed in the phase of supply planning. This leads to high demands on cost calculation and job order planning. Today a variety of supporting software systems is offered. However, they hardly consider time-dynamic components and prevent a transparent time-based argumentation. This paper presents an approach to a "time-dynamic calculation", which allows a time and capacity related price argumentation. First of all the situation of the tool and mould making industry is described and current approaches to price argumentations are described and evaluated. On this basis the Institute of Production Engineering and Machine Tools (IFW) of the Leibniz Unlversität Hannover is developing a concept to integrate time-dynamic components in the supply planning.

AB - A time-dynamic calculation approach considering capacitive factors. The tool and mould making Industry needs an individual calculation because of their typical unique manufacturing and their attention to customer requirements. At the same time prices and dates of delivery are already fixed in the phase of supply planning. This leads to high demands on cost calculation and job order planning. Today a variety of supporting software systems is offered. However, they hardly consider time-dynamic components and prevent a transparent time-based argumentation. This paper presents an approach to a "time-dynamic calculation", which allows a time and capacity related price argumentation. First of all the situation of the tool and mould making industry is described and current approaches to price argumentations are described and evaluated. On this basis the Institute of Production Engineering and Machine Tools (IFW) of the Leibniz Unlversität Hannover is developing a concept to integrate time-dynamic components in the supply planning.

UR - http://www.scopus.com/inward/record.url?scp=79955700291&partnerID=8YFLogxK

U2 - 10.3139/104.110525

DO - 10.3139/104.110525

M3 - Artikel

AN - SCOPUS:79955700291

VL - 106

SP - 157

EP - 160

JO - ZWF Zeitschrift fuer Wirtschaftlichen Fabrikbetrieb

JF - ZWF Zeitschrift fuer Wirtschaftlichen Fabrikbetrieb

SN - 0947-0085

IS - 3

ER -