Details
Titel in Übersetzung | Dynamic evaluation of the composition of area types on construction sites |
---|---|
Originalsprache | Deutsch |
Seiten (von - bis) | 319-329 |
Seitenumfang | 11 |
Fachzeitschrift | Bauingenieur |
Jahrgang | 96 |
Ausgabenummer | 9 |
Publikationsstatus | Veröffentlicht - Sept. 2021 |
Abstract
On inner-city construction sites, there is usually only a limited amount of space available. This increases the complexity in the implementation of corresponding construction projects and at the same time the risk of postponements. Both the composition of the demand for specific types of space and the development of demand during the construction period should be taken into account in the course of schedu-ling. One way of assessing the demand for space is to introdu-ce the potential for conversion as an indicator of the property of a specific space to be able to adapt flexibly in the event of possible short-term changes in the construction project. This can be used to create an evaluation basis that initially provides decision support for project planners and can subsequently be integrated into optimising procedures for scheduling. This will have a positive influence on the quality of a schedule in con-nection with its robustness.
ASJC Scopus Sachgebiete
- Ingenieurwesen (insg.)
- Tief- und Ingenieurbau
- Ingenieurwesen (insg.)
- Bauwesen
Zitieren
- Standard
- Harvard
- Apa
- Vancouver
- BibTex
- RIS
in: Bauingenieur, Jahrgang 96, Nr. 9, 09.2021, S. 319-329.
Publikation: Beitrag in Fachzeitschrift › Artikel › Forschung › Peer-Review
}
TY - JOUR
T1 - Dynamische Bewertung der Zusammensetzung von Flächenarten auf Baustellen
AU - Nitsche, Andreas
AU - Zander, Niklas
AU - Stonis, Malte
AU - Nyhuis, Peter
N1 - Funding Information: Die dargestellten Ergebnisse entstanden im Zuge der Bearbeitung des Forschungsprojekts zur "Organisation und Steuerung von Baustellenprozessen in der Modularen Gebäudenachverdichtung". Das IGF-Vorhaben 20198 N des Instituts für Energie-und Umwelttechnik (IUTA) e. V. wurde über die AiF im Rahmen des Programms zur Förderung der Industriellen Gemeinschaftsforschung (IGF) vom Bundesministerium für Wirtschaft und Energie (BMWi) aufgrund eines Beschlusses des Deutschen Bundestages gefördert.
PY - 2021/9
Y1 - 2021/9
N2 - On inner-city construction sites, there is usually only a limited amount of space available. This increases the complexity in the implementation of corresponding construction projects and at the same time the risk of postponements. Both the composition of the demand for specific types of space and the development of demand during the construction period should be taken into account in the course of schedu-ling. One way of assessing the demand for space is to introdu-ce the potential for conversion as an indicator of the property of a specific space to be able to adapt flexibly in the event of possible short-term changes in the construction project. This can be used to create an evaluation basis that initially provides decision support for project planners and can subsequently be integrated into optimising procedures for scheduling. This will have a positive influence on the quality of a schedule in con-nection with its robustness.
AB - On inner-city construction sites, there is usually only a limited amount of space available. This increases the complexity in the implementation of corresponding construction projects and at the same time the risk of postponements. Both the composition of the demand for specific types of space and the development of demand during the construction period should be taken into account in the course of schedu-ling. One way of assessing the demand for space is to introdu-ce the potential for conversion as an indicator of the property of a specific space to be able to adapt flexibly in the event of possible short-term changes in the construction project. This can be used to create an evaluation basis that initially provides decision support for project planners and can subsequently be integrated into optimising procedures for scheduling. This will have a positive influence on the quality of a schedule in con-nection with its robustness.
UR - http://www.scopus.com/inward/record.url?scp=85114668795&partnerID=8YFLogxK
U2 - 10.37544/0005-6650-2021-09-63
DO - 10.37544/0005-6650-2021-09-63
M3 - Artikel
AN - SCOPUS:85114668795
VL - 96
SP - 319
EP - 329
JO - Bauingenieur
JF - Bauingenieur
SN - 0005-6650
IS - 9
ER -