Details
Originalsprache | Englisch |
---|---|
Titel des Sammelwerks | Proceedings of the 1st Conference on Production Systems and Logistics |
Seiten | 12-20 |
Seitenumfang | 9 |
Publikationsstatus | Veröffentlicht - 2020 |
Veranstaltung | Conference on Production Systems and Logistics - Stellenbosch, Südafrika, Deutschland Dauer: 17 März 2020 → 20 März 2020 Konferenznummer: 1 https://cpsl-conference.com/ |
Publikationsreihe
Name | Proceedings of the Conference on Production Systems and Logistics |
---|
Abstract
Despite constantly increasing condition monitoring parallel to operation, maintenance, repair & overhaul (MRO) processes in the regeneration of complex capital goods are still characterised by a high degree of uncertainty regarding the capacity and material demands to be expected from a regeneration order. In order to meet the committed delivery times and dates, the disassembly at the beginning of the regeneration supply chain is of particular importance for the performance of the entire downstream regeneration process. High potential for improving logistical performance lies in an intelligent and logistics-oriented sequencing strategy in disassembly. In addition to technical-physical boundary conditions, the interaction of the disassembly process with downstream process steps and additional other control measures must also be taken into account. The logistical description and evaluation of the sequencing-oriented measures for improving the logistical performance of disassembly in the context of the regeneration of complex capital goods makes their modelling a necessary prerequisite and basis. This paper presents a basic logistical design and modelling approach.
ASJC Scopus Sachgebiete
- Ingenieurwesen (insg.)
- Wirtschaftsingenieurwesen und Fertigungstechnik
- Ingenieurwesen (insg.)
- Maschinenbau
- Betriebswirtschaft, Management und Rechnungswesen (insg.)
- Technologie- und Innovationsmanagement
- Betriebswirtschaft, Management und Rechnungswesen (insg.)
- Strategie und Management
Ziele für nachhaltige Entwicklung
Zitieren
- Standard
- Harvard
- Apa
- Vancouver
- BibTex
- RIS
Proceedings of the 1st Conference on Production Systems and Logistics. 2020. S. 12-20 (Proceedings of the Conference on Production Systems and Logistics).
Publikation: Beitrag in Buch/Bericht/Sammelwerk/Konferenzband › Aufsatz in Konferenzband › Forschung › Peer-Review
}
TY - GEN
T1 - Disassembly sequencing in the regeneration of complex capital goods
AU - Lucht, Torben
AU - Heuer, Tammo Mimken
AU - Nyhuis, Peter
N1 - Conference code: 1
PY - 2020
Y1 - 2020
N2 - Despite constantly increasing condition monitoring parallel to operation, maintenance, repair & overhaul (MRO) processes in the regeneration of complex capital goods are still characterised by a high degree of uncertainty regarding the capacity and material demands to be expected from a regeneration order. In order to meet the committed delivery times and dates, the disassembly at the beginning of the regeneration supply chain is of particular importance for the performance of the entire downstream regeneration process. High potential for improving logistical performance lies in an intelligent and logistics-oriented sequencing strategy in disassembly. In addition to technical-physical boundary conditions, the interaction of the disassembly process with downstream process steps and additional other control measures must also be taken into account. The logistical description and evaluation of the sequencing-oriented measures for improving the logistical performance of disassembly in the context of the regeneration of complex capital goods makes their modelling a necessary prerequisite and basis. This paper presents a basic logistical design and modelling approach.
AB - Despite constantly increasing condition monitoring parallel to operation, maintenance, repair & overhaul (MRO) processes in the regeneration of complex capital goods are still characterised by a high degree of uncertainty regarding the capacity and material demands to be expected from a regeneration order. In order to meet the committed delivery times and dates, the disassembly at the beginning of the regeneration supply chain is of particular importance for the performance of the entire downstream regeneration process. High potential for improving logistical performance lies in an intelligent and logistics-oriented sequencing strategy in disassembly. In addition to technical-physical boundary conditions, the interaction of the disassembly process with downstream process steps and additional other control measures must also be taken into account. The logistical description and evaluation of the sequencing-oriented measures for improving the logistical performance of disassembly in the context of the regeneration of complex capital goods makes their modelling a necessary prerequisite and basis. This paper presents a basic logistical design and modelling approach.
KW - Disassembly
KW - MRO
KW - complex capital goods
KW - condition monitoring
KW - regeneration
UR - http://www.scopus.com/inward/record.url?scp=85126077683&partnerID=8YFLogxK
U2 - 10.15488/9642
DO - 10.15488/9642
M3 - Conference contribution
T3 - Proceedings of the Conference on Production Systems and Logistics
SP - 12
EP - 20
BT - Proceedings of the 1st Conference on Production Systems and Logistics
T2 - Conference on Production Systems and Logistics
Y2 - 17 March 2020 through 20 March 2020
ER -