Details
Originalsprache | Englisch |
---|---|
Titel des Sammelwerks | Proceedings of the 1st Conference on Production Systems and Logistics (CPSL 2020) |
Seiten | 198-208 |
Seitenumfang | 11 |
Publikationsstatus | Veröffentlicht - 2020 |
Publikationsreihe
Name | Proceedings of the Conference on Production Systems and Logistics |
---|
Abstract
ASJC Scopus Sachgebiete
- Ingenieurwesen (insg.)
- Wirtschaftsingenieurwesen und Fertigungstechnik
- Ingenieurwesen (insg.)
- Maschinenbau
- Betriebswirtschaft, Management und Rechnungswesen (insg.)
- Technologie- und Innovationsmanagement
- Betriebswirtschaft, Management und Rechnungswesen (insg.)
- Strategie und Management
Ziele für nachhaltige Entwicklung
Zitieren
- Standard
- Harvard
- Apa
- Vancouver
- BibTex
- RIS
Proceedings of the 1st Conference on Production Systems and Logistics (CPSL 2020). 2020. S. 198-208 (Proceedings of the Conference on Production Systems and Logistics).
Publikation: Beitrag in Buch/Bericht/Sammelwerk/Konferenzband › Aufsatz in Konferenzband › Forschung › Peer-Review
}
TY - GEN
T1 - Deriving of Sequencing Strategies for Multi-Stage Productions Supported by Logistic Models and Software Tools
AU - Mütze, Alexander Carolus Erich
AU - Nyhuis, Peter
N1 - Acknowledgements The contribution was created within the knowledge transfer project "Logistics-Oriented Sequencing strategies for multi-stage production", funded by the Deutsche Forschungsgemeinschaft (DFG, German Research Foundation) – 409759709. In addition, the authors would like to thank the Koenig & Bauer Industrial AG & Co. KG as transfer partner for the valuable input and contribution to the project. For the correctness of the calculations in the software tools, no liability is taken over by the authors nor the Institute of Production Systems and Logistics belonging to Leibniz University Hannover.
PY - 2020
Y1 - 2020
N2 - Sequencing as a core task of production control has a significant influence on the logistical performance and efficiency of a single work system. Particularly in the presence of sequence dependent setup times, systematic sequencing can increase the productivity of a work system by saving them. This, however, leads to a decreasing schedule reliability of the work system, which creates an area of conflict. In recent years, mathematical models have been developed at the Institute of Production Systems and Logistics (IFA) that describe the influence of different sequencing rules on the schedule reliability and productivity of a work system. In a further step, these single so-called partial models can be linked with each other. This allows a calculation of the lateness behaviour of a multi-stage production in dependency of the sequencing rules assigned to the individual work system and thus of the overall sequencing strategy. This paper presents the possibilities of linking different logistic models in order to quantify the influence of sequencing on logistic target values as well as two software tools by which the impact and combination of various sequencing rules can be examined based on production feedback data or by means of a generic supply chain. As a result, it is possible to assess different sequence configurations of a multi-stage production and thus strategically align the production in the area of conflict between productivity and schedule reliability.
AB - Sequencing as a core task of production control has a significant influence on the logistical performance and efficiency of a single work system. Particularly in the presence of sequence dependent setup times, systematic sequencing can increase the productivity of a work system by saving them. This, however, leads to a decreasing schedule reliability of the work system, which creates an area of conflict. In recent years, mathematical models have been developed at the Institute of Production Systems and Logistics (IFA) that describe the influence of different sequencing rules on the schedule reliability and productivity of a work system. In a further step, these single so-called partial models can be linked with each other. This allows a calculation of the lateness behaviour of a multi-stage production in dependency of the sequencing rules assigned to the individual work system and thus of the overall sequencing strategy. This paper presents the possibilities of linking different logistic models in order to quantify the influence of sequencing on logistic target values as well as two software tools by which the impact and combination of various sequencing rules can be examined based on production feedback data or by means of a generic supply chain. As a result, it is possible to assess different sequence configurations of a multi-stage production and thus strategically align the production in the area of conflict between productivity and schedule reliability.
KW - Demonstrator
KW - Production Planning and Control
KW - Sequencing
KW - Software Tool
KW - Supply Chain Configuration
UR - http://www.scopus.com/inward/record.url?scp=85126077583&partnerID=8YFLogxK
U2 - 10.15488/9661
DO - 10.15488/9661
M3 - Conference contribution
T3 - Proceedings of the Conference on Production Systems and Logistics
SP - 198
EP - 208
BT - Proceedings of the 1st Conference on Production Systems and Logistics (CPSL 2020)
ER -