Deriving of Sequencing Strategies for Multi-Stage Productions Supported by Logistic Models and Software Tools

Publikation: Beitrag in Buch/Bericht/Sammelwerk/KonferenzbandAufsatz in KonferenzbandForschungPeer-Review

Autoren

  • Alexander Carolus Erich Mütze
  • Peter Nyhuis
Forschungs-netzwerk anzeigen

Details

OriginalspracheEnglisch
Titel des SammelwerksProceedings of the 1st Conference on Production Systems and Logistics (CPSL 2020)
Seiten198-208
Seitenumfang11
PublikationsstatusVeröffentlicht - 2020

Publikationsreihe

NameProceedings of the Conference on Production Systems and Logistics

Abstract

Sequencing as a core task of production control has a significant influence on the logistical performance and efficiency of a single work system. Particularly in the presence of sequence dependent setup times, systematic sequencing can increase the productivity of a work system by saving them. This, however, leads to a decreasing schedule reliability of the work system, which creates an area of conflict. In recent years, mathematical models have been developed at the Institute of Production Systems and Logistics (IFA) that describe the influence of different sequencing rules on the schedule reliability and productivity of a work system. In a further step, these single so-called partial models can be linked with each other. This allows a calculation of the lateness behaviour of a multi-stage production in dependency of the sequencing rules assigned to the individual work system and thus of the overall sequencing strategy. This paper presents the possibilities of linking different logistic models in order to quantify the influence of sequencing on logistic target values as well as two software tools by which the impact and combination of various sequencing rules can be examined based on production feedback data or by means of a generic supply chain. As a result, it is possible to assess different sequence configurations of a multi-stage production and thus strategically align the production in the area of conflict between productivity and schedule reliability.

ASJC Scopus Sachgebiete

Ziele für nachhaltige Entwicklung

Zitieren

Deriving of Sequencing Strategies for Multi-Stage Productions Supported by Logistic Models and Software Tools. / Mütze, Alexander Carolus Erich; Nyhuis, Peter.
Proceedings of the 1st Conference on Production Systems and Logistics (CPSL 2020). 2020. S. 198-208 (Proceedings of the Conference on Production Systems and Logistics).

Publikation: Beitrag in Buch/Bericht/Sammelwerk/KonferenzbandAufsatz in KonferenzbandForschungPeer-Review

Mütze, ACE & Nyhuis, P 2020, Deriving of Sequencing Strategies for Multi-Stage Productions Supported by Logistic Models and Software Tools. in Proceedings of the 1st Conference on Production Systems and Logistics (CPSL 2020). Proceedings of the Conference on Production Systems and Logistics, S. 198-208. https://doi.org/10.15488/9661
Mütze, A. C. E., & Nyhuis, P. (2020). Deriving of Sequencing Strategies for Multi-Stage Productions Supported by Logistic Models and Software Tools. In Proceedings of the 1st Conference on Production Systems and Logistics (CPSL 2020) (S. 198-208). (Proceedings of the Conference on Production Systems and Logistics). https://doi.org/10.15488/9661
Mütze ACE, Nyhuis P. Deriving of Sequencing Strategies for Multi-Stage Productions Supported by Logistic Models and Software Tools. in Proceedings of the 1st Conference on Production Systems and Logistics (CPSL 2020). 2020. S. 198-208. (Proceedings of the Conference on Production Systems and Logistics). doi: 10.15488/9661
Mütze, Alexander Carolus Erich ; Nyhuis, Peter. / Deriving of Sequencing Strategies for Multi-Stage Productions Supported by Logistic Models and Software Tools. Proceedings of the 1st Conference on Production Systems and Logistics (CPSL 2020). 2020. S. 198-208 (Proceedings of the Conference on Production Systems and Logistics).
Download
@inproceedings{03a7875685454411820c5ff59b39207d,
title = "Deriving of Sequencing Strategies for Multi-Stage Productions Supported by Logistic Models and Software Tools",
abstract = "Sequencing as a core task of production control has a significant influence on the logistical performance and efficiency of a single work system. Particularly in the presence of sequence dependent setup times, systematic sequencing can increase the productivity of a work system by saving them. This, however, leads to a decreasing schedule reliability of the work system, which creates an area of conflict. In recent years, mathematical models have been developed at the Institute of Production Systems and Logistics (IFA) that describe the influence of different sequencing rules on the schedule reliability and productivity of a work system. In a further step, these single so-called partial models can be linked with each other. This allows a calculation of the lateness behaviour of a multi-stage production in dependency of the sequencing rules assigned to the individual work system and thus of the overall sequencing strategy. This paper presents the possibilities of linking different logistic models in order to quantify the influence of sequencing on logistic target values as well as two software tools by which the impact and combination of various sequencing rules can be examined based on production feedback data or by means of a generic supply chain. As a result, it is possible to assess different sequence configurations of a multi-stage production and thus strategically align the production in the area of conflict between productivity and schedule reliability.",
keywords = "Demonstrator, Production Planning and Control, Sequencing, Software Tool, Supply Chain Configuration",
author = "M{\"u}tze, {Alexander Carolus Erich} and Peter Nyhuis",
note = "Acknowledgements The contribution was created within the knowledge transfer project {"}Logistics-Oriented Sequencing strategies for multi-stage production{"}, funded by the Deutsche Forschungsgemeinschaft (DFG, German Research Foundation) – 409759709. In addition, the authors would like to thank the Koenig & Bauer Industrial AG & Co. KG as transfer partner for the valuable input and contribution to the project. For the correctness of the calculations in the software tools, no liability is taken over by the authors nor the Institute of Production Systems and Logistics belonging to Leibniz University Hannover.",
year = "2020",
doi = "10.15488/9661",
language = "English",
series = "Proceedings of the Conference on Production Systems and Logistics",
pages = "198--208",
booktitle = "Proceedings of the 1st Conference on Production Systems and Logistics (CPSL 2020)",

}

Download

TY - GEN

T1 - Deriving of Sequencing Strategies for Multi-Stage Productions Supported by Logistic Models and Software Tools

AU - Mütze, Alexander Carolus Erich

AU - Nyhuis, Peter

N1 - Acknowledgements The contribution was created within the knowledge transfer project "Logistics-Oriented Sequencing strategies for multi-stage production", funded by the Deutsche Forschungsgemeinschaft (DFG, German Research Foundation) – 409759709. In addition, the authors would like to thank the Koenig & Bauer Industrial AG & Co. KG as transfer partner for the valuable input and contribution to the project. For the correctness of the calculations in the software tools, no liability is taken over by the authors nor the Institute of Production Systems and Logistics belonging to Leibniz University Hannover.

PY - 2020

Y1 - 2020

N2 - Sequencing as a core task of production control has a significant influence on the logistical performance and efficiency of a single work system. Particularly in the presence of sequence dependent setup times, systematic sequencing can increase the productivity of a work system by saving them. This, however, leads to a decreasing schedule reliability of the work system, which creates an area of conflict. In recent years, mathematical models have been developed at the Institute of Production Systems and Logistics (IFA) that describe the influence of different sequencing rules on the schedule reliability and productivity of a work system. In a further step, these single so-called partial models can be linked with each other. This allows a calculation of the lateness behaviour of a multi-stage production in dependency of the sequencing rules assigned to the individual work system and thus of the overall sequencing strategy. This paper presents the possibilities of linking different logistic models in order to quantify the influence of sequencing on logistic target values as well as two software tools by which the impact and combination of various sequencing rules can be examined based on production feedback data or by means of a generic supply chain. As a result, it is possible to assess different sequence configurations of a multi-stage production and thus strategically align the production in the area of conflict between productivity and schedule reliability.

AB - Sequencing as a core task of production control has a significant influence on the logistical performance and efficiency of a single work system. Particularly in the presence of sequence dependent setup times, systematic sequencing can increase the productivity of a work system by saving them. This, however, leads to a decreasing schedule reliability of the work system, which creates an area of conflict. In recent years, mathematical models have been developed at the Institute of Production Systems and Logistics (IFA) that describe the influence of different sequencing rules on the schedule reliability and productivity of a work system. In a further step, these single so-called partial models can be linked with each other. This allows a calculation of the lateness behaviour of a multi-stage production in dependency of the sequencing rules assigned to the individual work system and thus of the overall sequencing strategy. This paper presents the possibilities of linking different logistic models in order to quantify the influence of sequencing on logistic target values as well as two software tools by which the impact and combination of various sequencing rules can be examined based on production feedback data or by means of a generic supply chain. As a result, it is possible to assess different sequence configurations of a multi-stage production and thus strategically align the production in the area of conflict between productivity and schedule reliability.

KW - Demonstrator

KW - Production Planning and Control

KW - Sequencing

KW - Software Tool

KW - Supply Chain Configuration

UR - http://www.scopus.com/inward/record.url?scp=85126077583&partnerID=8YFLogxK

U2 - 10.15488/9661

DO - 10.15488/9661

M3 - Conference contribution

T3 - Proceedings of the Conference on Production Systems and Logistics

SP - 198

EP - 208

BT - Proceedings of the 1st Conference on Production Systems and Logistics (CPSL 2020)

ER -