Details
Originalsprache | Englisch |
---|---|
Seiten (von - bis) | 207-215 |
Seitenumfang | 9 |
Fachzeitschrift | Production Engineering |
Jahrgang | 14 |
Ausgabenummer | 2 |
Publikationsstatus | Veröffentlicht - 12 Feb. 2020 |
Zitieren
- Standard
- Harvard
- Apa
- Vancouver
- BibTex
- RIS
in: Production Engineering, Jahrgang 14, Nr. 2, 12.02.2020, S. 207-215.
Publikation: Beitrag in Fachzeitschrift › Artikel › Forschung › Peer-Review
}
TY - JOUR
T1 - Continuous modelling of machine tool failure durations for improved production scheduling
AU - Denkena, B.
AU - Dittrich, M.-a.
AU - Keunecke, L.
AU - Wilmsmeier, S.
N1 - Funding information: Open Access funding provided by Projekt DEAL. The results presented in this paper were obtained within in the Collaborative Research Center 653 “Gentelligent Components in Their Lifecycle”. The authors would like to thank the German Research Foundation (DFG) for its financial support (Grant SFB653 T09).
PY - 2020/2/12
Y1 - 2020/2/12
UR - http://www.scopus.com/inward/record.url?scp=85079420414&partnerID=8YFLogxK
U2 - 10.1007/s11740-020-00955-y
DO - 10.1007/s11740-020-00955-y
M3 - Article
VL - 14
SP - 207
EP - 215
JO - Production Engineering
JF - Production Engineering
SN - 0944-6524
IS - 2
ER -