Loading [MathJax]/extensions/tex2jax.js

Continuous modelling of machine tool failure durations for improved production scheduling

Publikation: Beitrag in FachzeitschriftArtikelForschungPeer-Review

Autorschaft

  • B. Denkena
  • M.-a. Dittrich
  • L. Keunecke
  • S. Wilmsmeier

Externe Organisationen

  • Volkswagen AG
Plum Print visual indicator of research metrics
  • Citations
    • Citation Indexes: 8
  • Captures
    • Readers: 19
see details

Details

OriginalspracheEnglisch
Seiten (von - bis)207-215
Seitenumfang9
FachzeitschriftProduction Engineering
Jahrgang14
Ausgabenummer2
PublikationsstatusVeröffentlicht - 12 Feb. 2020

Zitieren

Continuous modelling of machine tool failure durations for improved production scheduling. / Denkena, B.; Dittrich, M.-a.; Keunecke, L. et al.
in: Production Engineering, Jahrgang 14, Nr. 2, 12.02.2020, S. 207-215.

Publikation: Beitrag in FachzeitschriftArtikelForschungPeer-Review

Denkena, B, Dittrich, M, Keunecke, L & Wilmsmeier, S 2020, 'Continuous modelling of machine tool failure durations for improved production scheduling', Production Engineering, Jg. 14, Nr. 2, S. 207-215. https://doi.org/10.1007/s11740-020-00955-y
Denkena, B., Dittrich, M., Keunecke, L., & Wilmsmeier, S. (2020). Continuous modelling of machine tool failure durations for improved production scheduling. Production Engineering, 14(2), 207-215. https://doi.org/10.1007/s11740-020-00955-y
Denkena B, Dittrich M, Keunecke L, Wilmsmeier S. Continuous modelling of machine tool failure durations for improved production scheduling. Production Engineering. 2020 Feb 12;14(2):207-215. doi: 10.1007/s11740-020-00955-y
Denkena, B. ; Dittrich, M.-a. ; Keunecke, L. et al. / Continuous modelling of machine tool failure durations for improved production scheduling. in: Production Engineering. 2020 ; Jahrgang 14, Nr. 2. S. 207-215.
Download
@article{13e2491ffaf54c7b982c8678c27afb9a,
title = "Continuous modelling of machine tool failure durations for improved production scheduling",
author = "B. Denkena and M.-a. Dittrich and L. Keunecke and S. Wilmsmeier",
note = "Funding information: Open Access funding provided by Projekt DEAL. The results presented in this paper were obtained within in the Collaborative Research Center 653 “Gentelligent Components in Their Lifecycle”. The authors would like to thank the German Research Foundation (DFG) for its financial support (Grant SFB653 T09).",
year = "2020",
month = feb,
day = "12",
doi = "10.1007/s11740-020-00955-y",
language = "English",
volume = "14",
pages = "207--215",
number = "2",

}

Download

TY - JOUR

T1 - Continuous modelling of machine tool failure durations for improved production scheduling

AU - Denkena, B.

AU - Dittrich, M.-a.

AU - Keunecke, L.

AU - Wilmsmeier, S.

N1 - Funding information: Open Access funding provided by Projekt DEAL. The results presented in this paper were obtained within in the Collaborative Research Center 653 “Gentelligent Components in Their Lifecycle”. The authors would like to thank the German Research Foundation (DFG) for its financial support (Grant SFB653 T09).

PY - 2020/2/12

Y1 - 2020/2/12

UR - http://www.scopus.com/inward/record.url?scp=85079420414&partnerID=8YFLogxK

U2 - 10.1007/s11740-020-00955-y

DO - 10.1007/s11740-020-00955-y

M3 - Article

VL - 14

SP - 207

EP - 215

JO - Production Engineering

JF - Production Engineering

SN - 0944-6524

IS - 2

ER -