Details
Titel in Übersetzung | Influences of in situ production of grouted joints on aspects of structural safety |
---|---|
Originalsprache | Deutsch |
Seiten | 554-560 |
Seitenumfang | 7 |
Band | 91 |
Ausgabenummer | 8 |
Fachzeitschrift | BAUTECHNIK |
Publikationsstatus | Veröffentlicht - Aug. 2014 |
Abstract
Grouted joints represent tube-in-tube connections which are typically used for the construction of offshore wind turbines. These connections connect, for example, the driven pile to the topside of the substructure of all constructions used in Germany up to now, from monopiles to jacket substructures. The gap between the tubes of different sizes is later filled with a high-performance grout to secure a force- and form-fitting connection. These connections compensate the tolerances caused by the pile-driving process. This scientific paper shows the regulations used for grouted joints and the special characteristics of the filling process itself. The requirements of the material behavior of grout to secure an undisturbed filling process are also shown. Furthermore, the erection process and possible failures during this process are analyzed. Two approaches for the experimental simulation of the filling process are shown in laboratory scale and in real scale. Hence, new results considering the flow behaviour of grout materials in the gap of grouted joints can be derived. Finally, results of these filling tests considering the compressive strength are shown and discussed.
Schlagwörter
- grout material, grouted joint, in situ material properties, mock-up tests, offshore grouting procedure, offshore wind turbines
ASJC Scopus Sachgebiete
- Ingenieurwesen (insg.)
- Tief- und Ingenieurbau
- Ingenieurwesen (insg.)
- Bauwesen
Zitieren
- Standard
- Harvard
- Apa
- Vancouver
- BibTex
- RIS
in: BAUTECHNIK, Jahrgang 91, Nr. 8, 08.2014, S. 554-560.
Publikation: Beitrag in nicht-wissenschaftlicher/populärwissenschaftlicher Zeitschrift/Zeitung › Beitrag in Publikumszeitung/-zeitschrift › Transfer
}
TY - GEN
T1 - Ausführungstechnische Einflüsse auf Aspekte der Tragsicherheit von Grouted Joints
AU - Lohaus, Ludger
AU - Werner, Michael
PY - 2014/8
Y1 - 2014/8
N2 - Grouted joints represent tube-in-tube connections which are typically used for the construction of offshore wind turbines. These connections connect, for example, the driven pile to the topside of the substructure of all constructions used in Germany up to now, from monopiles to jacket substructures. The gap between the tubes of different sizes is later filled with a high-performance grout to secure a force- and form-fitting connection. These connections compensate the tolerances caused by the pile-driving process. This scientific paper shows the regulations used for grouted joints and the special characteristics of the filling process itself. The requirements of the material behavior of grout to secure an undisturbed filling process are also shown. Furthermore, the erection process and possible failures during this process are analyzed. Two approaches for the experimental simulation of the filling process are shown in laboratory scale and in real scale. Hence, new results considering the flow behaviour of grout materials in the gap of grouted joints can be derived. Finally, results of these filling tests considering the compressive strength are shown and discussed.
AB - Grouted joints represent tube-in-tube connections which are typically used for the construction of offshore wind turbines. These connections connect, for example, the driven pile to the topside of the substructure of all constructions used in Germany up to now, from monopiles to jacket substructures. The gap between the tubes of different sizes is later filled with a high-performance grout to secure a force- and form-fitting connection. These connections compensate the tolerances caused by the pile-driving process. This scientific paper shows the regulations used for grouted joints and the special characteristics of the filling process itself. The requirements of the material behavior of grout to secure an undisturbed filling process are also shown. Furthermore, the erection process and possible failures during this process are analyzed. Two approaches for the experimental simulation of the filling process are shown in laboratory scale and in real scale. Hence, new results considering the flow behaviour of grout materials in the gap of grouted joints can be derived. Finally, results of these filling tests considering the compressive strength are shown and discussed.
KW - grout material
KW - grouted joint
KW - in situ material properties
KW - mock-up tests
KW - offshore grouting procedure
KW - offshore wind turbines
UR - http://www.scopus.com/inward/record.url?scp=84905449695&partnerID=8YFLogxK
U2 - 10.1002/bate.201400045
DO - 10.1002/bate.201400045
M3 - Beitrag in Publikumszeitung/-zeitschrift
AN - SCOPUS:84905449695
VL - 91
SP - 554
EP - 560
JO - BAUTECHNIK
JF - BAUTECHNIK
SN - 0932-8351
ER -